Sie sind auf Seite 1von 8

Project - 2 x 600 MW STPP

BOQ for CW PUMPS Pacakage

BOQ for 2X600 MW Singhitarai Thermal Power Project


Project - 2X600 MW Singhitarai Thermal Power Project
Client - ABIR singhitarai Thermal Power Project
Package Name : CW PUMPS
Vendor Name : KBL
LOA No & Date :

Ordering Status
Sr. No.

Description

Qty.

Unit

CVP2100, Single Stage, Concrete Volute


Pumps at 330 RPM @ 50 Hz

Nos

1.1

Rotating Assembly (Consisting of below items)

Set

Set

1.1.1

Impeller

1.1.2

Impeller Shaft

1.1.3

Cardon Shaft Assembly with universal joints

1.1.4

Shaft sleeves

1.2

Stationary Components(Consisting of below items)

1.2.2

Bearing Housing (Journal & Thrust Bearing)

1.2.3

Split Bearing & Stuffing Box

1.2.4

Thrust Bearing Lantern

1.2.5

Casing Cover

1.2.6

Thrust Bearing

1.2.7

Liner

As per L2
Schedule

Actual
Ordering Date

Sub-Vendor
name

Page 1 of 8

Purchase
Order No. & Ordered Qty
Date
Present Status

Manufacturing Status
% of
Completion

Manufactured Qty
Current

Cumulative

Project - 2 x 600 MW STPP

BOQ for CW PUMPS Pacakage

Ordering Status
Sr. No.

1.3

Description

Preliminary & Secondary Embeded Parts(Consisting of


below items)

1.3.1

Liner holder Ring

1.3.2

Volute Radius Ring

1.3.3

Volute Tongue

1.3.4

Cover ring

1.3.6

Dischrage Divergent Pipe

1.3.7

Manhole Assembly

1.3.8

Motor Base Plate with Foundation Bolts & Hardwares

Qty.

Unit

Set

1.4

Wooden form work for Volute

Set

1.5

Wooden Form Work for Draft tube

Set

Nos

2
2.1

As per L2
Schedule

Actual
Ordering Date

Sub-Vendor
name

ELECTRICAL MOTOR
Electric motor 3650Kw - 11KV, 18 Pole, IP55W, CACA SCIM.

CONTROL & INSTRUMENTS

3.1

RTD (Duplex) 2 Nos/Phase for winding temperature


measurement of the Motor

30

Nos

3.2

RTD (Duplex) for each DE & NDE bearing of the Motor

10

Nos

3.3

RTD (Duplex) PT 100 RTD for pump Thrust Bearing Pad

Nos

3.4

RTD (Duplex) PT 100 RTD for pump Thrust Bearing oil

Nos

3.5

Pressure Gauge on Discharge Piping

Nos

3.6

Temperature Gauge for Motor Bearing

10

Nos

3.9

Level Gauge

Nos

3.10

Reverse Rotation Switch (RRS)

10

Nos

Page 2 of 8

Purchase
Order No. & Ordered Qty
Date
Present Status

Manufacturing Status
% of
Completion

Manufactured Qty

Project - 2 x 600 MW STPP

BOQ for CW PUMPS Pacakage

Ordering Status
Sr. No.

Description

Qty.

Unit

3.11

Reverse Rotation Monitor

Set

3.12

Flow switch at thrust bearing cooling water outlet

Nos

3.13

Sight Flow indicator at cooling water outlet of Pump thrust


bearing

Nos

3.12

Vibration Sensor

30

Nos

3.14

Key Phasor

Nos

3.15

Vibration Monitoring System

Set

3.16

Pressure Gauge for Seal Water System

Nos

3.17

Pressure Transmitter for Seal Water System

Nos

3.18

Differential Pressure Switch

Nos

3.19

Junction Box

Nos

3.2

Control Cabling upto Junction Boxes

Set

As per L2
Schedule

Actual
Ordering Date

Sub-Vendor
name

Start Up & Commissioning Spares

4.1

Bearings for Pumps

Set

4.2

Motor Bearings (1DE Bearing/ 1 NDE Bearing)

Set

4.3

Gaskets

Set

4.4

Gland Packing Rope

Set

4.5

Stuffing Box Packings

Set

4.6

O-rings

Set

4.7

Fasteners

Set

4.8

Washers

Set

4.9

Shaft key

Set

4.10

RTDs

Set

4.11

Thermo well for all temperature elements

Set

Page 3 of 8

Purchase
Order No. & Ordered Qty
Date
Present Status

Manufacturing Status
% of
Completion

Manufactured Qty

Project - 2 x 600 MW STPP

BOQ for CW PUMPS Pacakage

Ordering Status
Sr. No.

4.12
5

Description

Gauges

Qty.

Unit

set

Special size spanners, wrenches specific to the equipments (if


any)

Set

5.2

Special lifting tools and tackles for specific equipments

Set

5.3

Special Power jacks and jacking screws


( Impeller Puller Pusher & Handel for
bearing Lock nut)

Set

5.5

Coupling pullers of each size and rating

Set

Supervision of Erection & Commissioning of equipemts


pertaining to our scope of supply

6.2

Eretion of wooden Form work of Draft tube & Volute

6.3

Civil Design & Drawings for draft tube & Volute

6.4

Supervision of Civil Work for draft tube & Volute construction at


site

6.5

CFD Analysis (from Cooling towers to Forebay, Complete


forebay, CW Sump)

6.6

Physical Sump Model Study

6.7

PG Testing of concrete Volute Pumps

6.8

Training of O&M Personnel of the owner

Others Supplies

7.1

Air Release Valves

Nos

7.2

Flange at Discharge Divergent Pipe

Nos

7.3

Sealing & Cooling Water System

Sets

Mock Up tools

Set

7.4

Sub-Vendor
name

Services

6.1

Actual
Ordering Date

Special Tools & Tackles

5.1

As per L2
Schedule

Page 4 of 8

Purchase
Order No. & Ordered Qty
Date
Present Status

Manufacturing Status
% of
Completion

Manufactured Qty

Project - 2 x 600 MW STPP

BOQ for CW PUMPS Pacakage

Project

Inspection Status
Proposed date of
Inspection

Actual Date of
Inspection

Delivery Status
Inspected Qty

Actual Qty
Delivered

Date of receipt at site


Remarks

LR No. & Date Transporter name

Current

Cumulative

Page 5 of 8

Project - 2 x 600 MW STPP

BOQ for CW PUMPS Pacakage

Inspection Status
Proposed date of
Inspection

Actual Date of
Inspection

Delivery Status
Inspected Qty

Actual Qty
Delivered

Date of receipt at site


Remarks

LR No. & Date Transporter name

Current

Cumulative

Page 6 of 8

Project - 2 x 600 MW STPP

BOQ for CW PUMPS Pacakage

Inspection Status
Proposed date of
Inspection

Actual Date of
Inspection

Delivery Status
Inspected Qty

Actual Qty
Delivered

Date of receipt at site


Remarks

LR No. & Date Transporter name

Current

Cumulative

Page 7 of 8

Project - 2 x 600 MW STPP

BOQ for CW PUMPS Pacakage

Inspection Status
Proposed date of
Inspection

Actual Date of
Inspection

Delivery Status
Inspected Qty

Actual Qty
Delivered

Date of receipt at site


Remarks

LR No. & Date Transporter name

Current

Cumulative

Page 8 of 8

Das könnte Ihnen auch gefallen