PROCUREMENT PLAN
1

GOODS

General
Country/Organisation:
Project/Programme Name:
Project/Programme SAP Identification #:
Loan Number:
Executing Agency:
Approval Date of Procurement Plan :
Date of General Procurement Notice:
Period Covered by this Procurement Plan:

Goods and Non-Consulting Services: Prior/Post review Thresholds


Procurement Method

Prior review
Threshold
(UA)

Post review
Threshold
(UA)

Frequency of Review

1.
2.
3.
4.
5.
6.

3. Procurement Packages Methods and Time Schedule for 18 months


Package description

Lot
Number

Estimated
Lot Description Amount in UA
(000)

Procurement
Method

Pre-or PostQualification

Dom. or
Regional
Preference

Prior or Post
Review

SPN
Publication
Date

Contract
Start Date

Comments
Ex: advance
contracting

Total Cost

0.00

Page 1

ORPF-Simplified Procurement Plan150811.xlsx

Works Web Template

PROCUREMENT PLAN

WORKS

1 General
Country/Organisation:
Project/Programme Name:
Project/Programme SAP Identification #:
Loan Number:
Executing Agency:
Approval Date of Procurement Plan:
Date of General Procurement Notice:
Period Covered by this Proc. Plan:

x
x
x
x
x
x
x

2 Works: Prior/Post review Threshold


Procurement Method

Prior review
Threshold
(UA equiv.)

Post review
Threshold
(UA equiv.)

Frequency of Review

1.
2.
3.
4.
5.
6.

3. Procurement Packages: Methods and Time Schedule for 18 months


Package Description

Lot
Number

Estimated
Lot Description Amount in UA
(000)

Lump sum or
Unit rate

Procurement
Method

Pre- or PostQualification

Dom. or
Regional
Preference

Prior or Post
Review

SPN
Publication
Date

Contract
Start Date

Comments
Ex: Advance
contracting

Total Cost

0.00

Page 2

ORPF-Simplified Procurement Plan150811.xlsx

Consultants Web Template

PROCUREMENT PLAN

CONSULTANTS

1 General
Country/Organisation:
Project/Programme Name:
Project/Programme SAP Identification #:
Loan Number:
Executing Agency:
Approval Date of Procurement Plan:
Date of General Procurement Notice:
Period Covered by these Proc. Plans:

x
x
x
x
x
x
x

2 Consulting Services: Prior/Post review Threshold


Selection Method

Prior review
Threshold
(UA equiv.)

Post review
Threshold
(UA equiv.)

Frequency of Review

1.
2.
3.
4.
5.
6.

3 Consulting Services: Selection Method and Time schedule for 18 Months


Description

Selection
Method

Lump sum or
Time-Based

Total Cost

Estimated
Amount in
UA (000)

Prior/Post
Review

EOI
Publication
Date

Contract
Start Date

Comments

0.00

Page 3