Beruflich Dokumente
Kultur Dokumente
Description
1.0
2.0
3.0
Sub-Total
Add 5% Contingency amount
Sub-Total
Add 14% VAT
Tender Amount Carried Forward to Page 4 (Summary for Bid
Opening Price)
Page 1 of 28
IPALITY
5/2016
TITIES:
Total Amount
12,813.90
-
42,713.00
55,526.90
2,776.35
58,303.25
8,162.45
66,465.70
Page 2 of 28
Unit
1.0
1.1.1
INSURANCE
(a) For the works and materials on site
Sum
Sum
1.1.2
Sum
1.1.3
Sum
1.2
1.2.1
1.3
SITE ESTABLISHMENT
Site establishment as per the scope of works requirements.
Sum
1.3.1
1.3.2
Sum
1.3.3
Sum
1.3.4
Sum
1.3.5
Sum
1.6
1.6.1
Page 3 of 28
Sum
Page 4 of 28
NICIPALITY
3/05/2016
ENERAL
Qty
Rate
Total
12,813.90
12,813.90
Page 5 of 28
12,813.90
Page 6 of 28
3.1
3.1.1
3.1.1.1
3.1.1.2
DESCRIPTION
UNITS
Sum
Sum
3.1.1.3
Sum
3.1.1.4
Sum
3.1.1.5
Sum
3.1.1.6
Install Micom P122 relay into 11kV existing panels, including the
required CT`s 800/5, relay panel cut outs and re-instatement of the
removed existing TJM10 relay.
Sum
3.1.1.7
Install Micom P122 relay into 66kV existing panels, including required
CT`s- 150/1, cut outs and re-instatement of the removed TJM 10 relay.
Sum
3.1.1.8
Supply, Install & Sinchronising of the tap changer between the two
20MVA transformers, supply and installation of all related equipment.
Sum
3.1.1.9
Page 7 of 28
Sum
3.1.1.10
3.2
Sum
3.2.1
3.2.2
Page 8 of 28
ea
ea
DESCRIPTION
UNITS
3.2.3
ea
3.2.4
ea
3.2.5
ea
3.2.6
ea
3.2.7
ea
3.2.8
3.2.9
3.2.10
ea
3.2.11
ea
3.2.12
ea
3.2.13
ea
3.2.14
ea
3.2.15
Cable clamps plus timber cable cleats for 500mm XLPE Type A cable
ea
3.2.17
ea
3.2.18
ea
3.2.19
ea
3.2.20
Page 9 of 28
Sum
Page 10 of 28
DESCRIPTION
UNITS
3.4
3.4.1
Supply
3.4.2
Install
3.5
3.5.1
Supply
3.5.2
Install
3.6
3.6.1
Excavations
3.6.2
3.6.3
3.6.4
3.7
3.7.1
Supply
3.7.2
Install
3.8
3.8.1
Supply
sum
3.8.2
Install
sum
Page 11 of 28
Page 12 of 28
DESCRIPTION
3.1
3.1.1
Sum
3.1.2
Sum
3.1.3
Sum
3.1.4
Sum
3.1.5
Sum
3.1.6
Sum
3.1.7
Sum
3.1.8
UNITS
Sum
3.1.9
Supply and Install Micom P122 and P632 relays into 11kV existing
panels, including required CT`s, cut outs and re-instatement of outdated
relays.
3.1.10
Supply and install Micom P122 relay into 66kV existing indoor control
panel.
Sum
3.1.11
66kV outdoor ct`s control cabling to indoor 66kV panels, cables were
stolen.
Sum
3.1.12
Supply, Install & Sinchronising of the tap changer between the two
15MVA transformers, supply and installation of all related equipment.
Sum
Page 13 of 28
Sum
3.1.13
Sum
3.1.14
Supply and Install 11kV, SBV4 with overcurrent and earth fault
protection, 1250A Busbars with a 1250A 11kV breaker including a
joggle panel, connect and testing.
Sum
Page 14 of 28
DESCRIPTION
UNITS
3.1.15
Supply, Install 100m (30m x 3 cables x 150mm single core copper per
phase) from the Transformer MV bushings to the 11kV breaker,
complete with cable ladder, spacers and supports including terminations,
complete.
Sum
3.1.16
Supply and install 11kV transformer palm terminal connector, stud size
38mm
ea
3.1.17
Sum
Page 15 of 28
Page 16 of 28
NICIPALITY
ASSOCIATED EQUIPMENT INSTALLATION
3/05/2016
FORMER
QTY
RATE
AMOUNT
Page 17 of 28
15
Page 18 of 28
NICIPALITY
83/05/2016
QTY
RATE
AMOUNT
-
20
15
45
12
20
24
Page 19 of 28
Page 20 of 28
NICIPALITY
3/05/2016
QTY
RATE
AMOUNT
-
25
25
20
20
20
120
120
Page 21 of 28
Page 22 of 28
NICIPALITY
3/05/2016
QTY
RATE
AMOUNT
Page 23 of 28
Page 24 of 28
NICIPALITY
3/05/2016
QTY
RATE
AMOUNT
-
Page 25 of 28
Page 26 of 28
4.1
4.2
DESCRIPTION
UNITS
QTY
ea
ea
15
ea
ea
ea
ea
3
4
4
14
ea
15
RATE
AMOUNT
4.2.1
4.2.2
4.2.3
4.2.4
4.2.5
4.2.6
4.2.7
4.2.8
26
4.2.9
16
4.2.10
ea
4.2.11
ea
14
4.2.12
ea
4.2.13
ea
4.2.14
ea
4.2.15
Cable clamps plus treated meranti timber cable cleats for 500mm XLPE
Type A cable mounted on structure
ea
24
4.2.16
ea
4.2.17
ea
4.2.18
ea
4.2.19
Sum
unit
unit
1
2
4.2.20
4.2.21
4.2.22
4.2.23
Supply only.
Actom, Micom Protection Relay P632
Actom, Micom Protection Relay P122
Total for Bill 2 Carried forward to next page
DESCRIPTION
UNITS
QTY
RATE
AMOUNT
Page 27 of 28
4.3
4.3.1
4.3.2
Supply
Install
Sum
Sum
1
1
3,508.00
460.00
3,508.00
460.00
4.3.3
Sum
1,000.00
1,000.00
m
m
25
25
425.00
112.00
10,625.00
2,800.00
m
m
3
3
m
m
m
m
20
20
20
4
m
m
120
120
sum
sum
1
1
sum
sum
1
1
4.4
4.4.1
4.4.2
4.5
4.5.1
4.5.2
4.6
4.6.1
4.6.2
4.6.3
4.6.4
4.7
4.7.1
4.7.2
4.8
4.8.1
4.8.2
4.9
4.9.1
4.9.1
180.00
670.00
75.00
450.00
3,600.00
13,400.00
1,500.00
1,800.00
Page 28 of 28
3,625.00
395.00
3,625.00
395.00
42,713.00