Material Submittal

For
i

'J

DSC System

Giza System

Yokogawa - Japan

Des System -

Al Shabab Power Plant

Rev.O

.....

Technical Proposal

Des System - AI Shabab Power Plant

Rev.O

GIZR
SYSTEMS
we InlJeQrate

OVERVIEW

Technical Proposal to:


East Delta Electricity Production Company

the document is for damitta project

GIZR
SYSTEMS
Industrial Applications B.U.
8 AI-Fawakeh St.,
Mohandessin,

Giza 12311,
Egypt
T e l : +202 37604597
F a x : +202 37603247
http://www.gizasystems.com

herein is the property of Giza Systems, and may not be copied, used
or in part except with the prior written permission of Giza Systems or,
under a contract with another party as expressly authorised under

Page 1 of 36

GIZR
SYSTEMS
------y"e inte<::jri')[!2

Project: AlSHABAB 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
2of36
Rev. No.:
0

TABLE OF CONTENTS
1

1.1

DCS SYSTEM DESCRIPTION (CENTUM VP)

Centum VP Benefits

1.1.1 System Architecture

1.1.2 Operation

1.1.3 Control

1.1.4 Engineering

1.1.5 Maintenance

1.2

Centum VP Major Components

1.2.1 Operator Interface, Human Interface Station - HIS

1.2.2 Engineering Work Station - ENG

13

1.2.3 Field Control Station - FCS

15

1.2.4 I/O Hardware - Field Network I/O (FlO)

17

1.2.5 Real Time Process Control Network - Vnet!IP

20

GIZR
SYSTE/V\S
---vve integrate

-"~'._H __

Project: ALSHABAB - 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
30f36
Rev. No.:
0

1.3

..~)

Centum VP Major Features

24

1.3.1 Expandability and Sizing

24

1.3.2 Total Integration

25

1.3.3 Plant Resource Manager (PRM)

27

1.3.4 HART Communication

29

31

2.1

PROPOSED SYSTEM FOR ALSHABAB POWER STATION


Project Specific Details

ASSUMPTIONS AND DESIGN CINSIDERATIONS

31

32

GIZR
SYSTEMS
-"------v..;e int2<;Jra t.e

Project: ALSHABAB 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-98?-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
4of36
Rev. No.:

1. Introduction
We thank you affording us this opportunity to submit this offer to your esteemed
company.
Giza Systems a premier systems integrator for Y okogawa and solution provider,
supplies the Middle East market with the latest Industrial Automation Solution.

We very well understand the importance of this tender, so we carefully selected the
optimum solutions and products from our reputable partners
It is worthy to state that Yokogawa DeS system is now Installed successfully in
FIVE power plants in Egypt which is Cairo West Power Plant unit 7&8 2x350MW,
Nubaria III power plant 3x250MW, Atf Power Plant 3x250MW, Sidi Krir unit 5
power plant 3x250MW and Kafr Eldawar power plant unit 4, 110MW.

We are fully committed for project success in case of wining.


Sincerely yours,

Amr Sherif
Power Sector Manager
Industrial Applications Business Unit
T e l : +2023761-3751,3760-3247
Fax.
: +2023760-3247
Mobile : +20102337671
E-Mail: amr.sherif@GizaSystems.com

GIZR
SYSTEMS
------..-we integrat.e

Project: ALSHABAB - 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
50f36
Rev. No.:
0

1.

DCS SYSTEM DESCRIPTION (CENTUM VP)

Yokogawa's Distributed Control System - CENTUM - was released in 1975 as the


first real Distributed Control System (DCS) in the world. Since then, it has been
continuously

enhanced

and

upgraded, incorporating state-of-the-art technology

maintaining continuities and backward compatibility of the system. CENTUM VP as


a DCS is the key component in Yokogawa's concept "Enterprise Technology
Solutions". With this brief introduction of CENTUM VP, we hope to give you a
good

understanding

of the

basic architecture without going into too detailed

information. The detailed technical information is provided in the enclosed technical


literature of our proposal. The CENTUM VP is a truly open system. It provides,
besides straightforward process control, excellent capabilities for:
D Integration of sub-systems such as PLC's, analysers, etc.

D Integrated Instrument Management with Plant Resource Manager (PRM)

D Integration over the control network (Vnet/IP) for ESD system (ProSafe-RS

case)

Altogether comprising in a total integrated production and facilities control system, and
operated via a single window. Due to the modularity and system architecture these
functions can all be implemented in a segregated way.

By using these segregation

features the process control system can be implemented in such a way that the plant
segregation is fully reflected in the production control system architecture.

GIZR
SYSTEMS
Project: ALSHABAB - 1000 MW SIMPLE
CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
6of36
Rev. No.:
0

1.1. CENTUM VP BENEFITS

1.1.1.System Architecture

The CENTUM VP System Architecture is straightforward. Highly flexible networks


can be designed using of commercially available network equipment like switching
HUB (Layer2 & Layer3). Although open and control communication data can be
transferred on the physically same V netlIP cables, these communications are logically
Jyy-"

segregated so that they do not have an effect on each other. It will enable
integration of non- CENTUM components to the network. The System Architecture
allows up to 1,000,000 Tags and 512 Stations. Different Domains can be defined to
segregate functional disciplines within the user's organization.
" ,\,,$
v)'

1.1.2 Operation

The Human Interface Station (HIS) is a powerful and easy-to-use Operator Station
with Operator Functions, Graphic Functions, Database Functions, and if required
Engineering Functions. It even provides User-defined Faceplates for an optimal ManMachine Interface.

The Windowing Operation allows the operator to place

frequently used displays (e.g. in a personal group) on the screen. Different Sources of
Information from the DCS (Graphic Panel, Trend Panel, etc.) as well as Information
from Supervisory Computers can be presented to the Operator on one Screen in a
uniform manner. The Report Package provides production reports by using spreadsheet
functions. Data Compression Techniques (e.g. Min., Max., Average etc.) are avalable.

GIZR
SYSTEMS
-------we inte9fate

Project: ALSHABAB -1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
7of36
Rev. No.:
0

)
CABINETS

Figurel-1-2: Computer application integration in CENTUM VP operator interface (HIS)

1.1.3 Control

The Field Control Station (FCS) is a state of the art generation model that integrates
process and batch control, and computer functions. The Integrated Control Functions
)

include:

Regulatory and Advanced Control Functions (Control Loops)

Sequence Control Functions (Sequence Table, Logic Charts, Sequential


Function Chart)

Subsystem Integration Functions

!]

Field Instrument Management Functions

These control functions are executed at high speed by the high performance Reduced
Instruction Set CPU (RISC processor). These functions can be combined to optimize

GIZR
SYSTEMS
_-___-Vv'E!.

inte~Jrar.e

Project: ALSHABAB -1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
80f36
Rev. No.:
0

continuous processes, batch processes and even discrete processes.

Redundancy

The Field Control Station is available in a "pair and spare" dual-redundant


configuration. For the first time in a DCS the Field Control Stations central processor
unit uses "pair and spare". Problems, which were not detected with fonner "duplex"
)

redundancy, are now easily detected.

Field Network I10JFIO)

The FlO range consists of direct nodes connected by Extended Serial Backboard (ESB)
bus and Remote nodes connected by Enhanced Remote (ER) bus. Both the busesvmay}
'~.

~ dual redundant. ESB bus is used within the cabinets and, by using Optical Fiber
Cable; the ER bus can be used for longer distances. The physical media of ER bus is
compatible with 10Base2 coaxial Ethernet cable or 100BaseTX Unshielded Twist
Pair (UTP) Ethernet cable.

1.1.4 Engineering
)

CENTUM VP offers engineering solutions, which match the user's introduction


schedule

and

engineering procedures.

Simplification of engineering work Since

CENTUM VP functions are configured using computer- aided engineering (CAE),


engineering work can be simplified.

Function configuration techniques confonn to

Sequential Function Chart (SFC) standards.

Reduction of engineering work time

CENTUM VP is capable of perfonning concurrent engineering. Thereby, two or more


engineers can share the engineering work. Also, the work time can be reduced by reusing previously developed application software that has been registered as parts of
models. Moreover, debugging can be improved by using off-line testing and simulation
in the test stage without having target hardware such as FCS available. Improvement
of engineering work enviromnent in CENTUM VP, the user can perfonn engineering

GIZR
SYSTEMS
vve intE:9rat.p

Project: ALSHABAB -1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
90f36
Rev. No.:
0

work not only from the Engineering Workstations but also from personal computers in a
network, enabling concurrent engineering.

This network can even be extended to

various locations all over the world by latest network technology.

Integration of

user's engineering tools CENTUM VP is capable of connecting different engineering


tools from several users to minimize the human error for engineering as well as to
shorten the engineering work.
1

Figure 1-1-4: Typical CENTUM VP control application engineering window

1.1.5 Maintenance
The Maintenance Functions of CENTUM VP include monitoring, extensive selfdiagnostics as well as on-line Maintenance Functions. The Maintenance Functions
automatically monitor the status of the system continuously. The status of each

GIZR
SYSTEMS
_---we 'nt(?t;:lf21l.e

Project: ALSHABAB - 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
10 of 36
Rev. No.:
0

card in the stations is monitored and reported to the Operator in case of failure.
The Remote Maintenance Functions (Optional Service) link the user's Engineering
Workstation to the Maintenance Computer at a Yokogawa Regional Service. The
Maintenance Computer can diagnose the user's system and skilled Maintenance
Engineers can carry out a comprehensive diagnosis of the system status more quickly
and at lower cost compared to a site visit. Furthermore, by using Remote Maintenance
____ .J'

Service (RMS), the Maintenance Engineer can prepare himself if a site visit would be
required.

1.2 CENTUM VP MAJOR COMPONENTS


A brief description of CENTUM VP major components is stated within this section.
For more detailed technical information on the CENTUM VP components, please
refer to the technical literature enclosed to this proposal (In Part 3 in this proposal).

1.2.1 Operator Interface, Human Interface Station - HIS


The HIS is the operator interface of the system. It provides dedicated screens for
)

operation, monitoring, reporting, trending etc. It is directly connected to Vnet/IP,


ensuring real-time communication between the operator interface and plant behavior,
e.g. faceplates and alarms etc.
The HIS is also connected to Ethernet which interconnects all HIS allowing for clientserver features on the operator interface level such as sharing of trend files, event data
bases etc.

GIZR
SYSTEMS
___-_-V'fe

integratE'

Project: ALSHABAB 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
11 of 36
Rev. No.:
0

man Interface Station

Figure 1-2-1a: Human Interface Station features

Depending on customer requirements several platforms can be used for HIS functions
viz. desktop or console type.

The Yokogawa Console Type with dual/Quad stacked

LCD or CRT is state-of-the-art, ergonomically designed for ease of use and faster
)

response to the operator.

A general purpose PC is installed inside the console to

achieve maximum synergy with installed base, minimize spare parts and different
maintenance contracts. Standard mM compatible PC workstation can also be used as an
operator station.

Operation Capability

The HIS provides powerful operation environment by many capability and much
capacity. The HIS can be operated as stand-alone station without depending to a
central server etc. Each operator is able to do the daily operation independently by
using dedicated HIS. All HIS has a capability to communicate and exchange
necessary data flexibly, and realize mutual back-up configuration by any other HIS.
The following functional capability and capacity can be built up into each HIS station.

Page 11 of 36

GIZR
SYSTEMS
-------------------vve i nt2grat2

Project: ALSHABAB -1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
12 of 36
Rev. No.:
0

o Number of Tags: 100,000 (Expandable up to 1,000,000)

o Graphic Window: 4,000 (400 data per window)

o Trend Window: 800 (8 colored trends per window)


o Trend Point Window: 6,400
o Trend Data Save Period: No limitation

Window Display Update Period: 1 second (as standard specification)

Historical Massage Save Period: No limitation

GIZR
SYSTEMS
-----we integrate

Project: ALSHABAB - 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricitv

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Production Company

DOC No.:
IA-HT-C-AI-16-987-10
Sheet:
13 of 36
Rev. No.:
0

Terminal Service
The CENTUM VP HIS is able to provide a Tenninal Service (TS) by utilizing
Windows 2003 TS technology. The TS Server allows to access CENTUM VP
application simultaneously, maximum 8 clients. Operating and monitoring function can
be realized from remote PCs same as local HIS. The following drawing shows typical
system configuration of TS capability.

CENTUM
CS3000

'I JI

Server for Remote


Operation and
Monitoring

~.~

VnetllP

Central control room


fDH".i!I

Figure 1-2-1c: System Configuration for Terminal Service


1.2.2 Engineering Work Station - ENG
An ENG is the engineering environment of the system and contains the master

GIZR
SYSTEMS
___vJe integralE'

Project: ALSHABAB - 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
14 of 36
Rev. No.:
0

database of the application. This system is based on a standard IBM compatible pc.
The engineering environment allows engineering in a fully graphical way.

By using

"pick and click" and "drag and drop" standard Windows features, the entire
configuration can be built in a graphical manner, including logics, sequences, control
loops, graphics etc.
With the concurrent engineering possibility, multiple engineers can work on a
)

configuration simultaneously, thereby allowing for testing, configuration etc. at the same
time.

HlS

n&

Vmrt

""c"'"""m"'''=.''~"~. _"w.m''_='~'''''~.,,_.,,_,,.__=~''".~,,__,,_.__''''="~..''_<'''"~'
._--_.",_.--1

ConCl.llrll!nt~nginiE!erjng

vi.a Y net

unctions

FeB
(Control functions)

Figure 1-2-2a: Concurrent Engineering

Test Function
The ENG provides testing environment at the phase of in-house engineering, FAT, site
service, etc. Typically 2 types of test function are configured by ENG station, namely

GIZR
SYSTEMS
WE:~

intE'r"lfCltE'

Project: AlSHABAB 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Production Company

DOC No.:
IA-HT-C-AI-16-987-10
Sheet:
15 of 36
Rev. No.:
0

Virtual Test Function and Target Test Function. The Virtual Test Function provides
testing environment without actual Fes controllers. A FeS simulator is used on pe to
simulate the functions and actions of Fes. The Virtual Test Function mainly
includes the capabilities of FeS operation, Wiring simulation, Break point, One-shot
execution, Tuning parameter saving, etc.
CENnlM CS 3000

Opt:>ration &: monitoring


i
functions andeng1neerlllg .
functions are mquiroo.

FCS

Figure 1-2-2b: Virtual Test Function

The Target Test Function provides testing environment with actual FeS, but without
field wiring or I/O cards. Even if the field wiring is furnished, this testing function is
available by ignoring the actual field wiring. Process I/O signals are simulated by
software I/O in FeS, and pe is able to receive input signal and send output signal
from/to FCS. The Target Test Function mainly includes the capabilities of FCS
operation, Wiring simulation, I/O disconnection, Break point, One-shot execution,
Tuning parameter saving, etc.

Page 15 of 36

GIZR
SYSTEMS
Project: ALSHABAB 1000 MW SIMPLE
CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
16 of 36
Rev. No.:
0

VnGt
!/C) switching imagE!

FeB

OlJT

IN

)
ItO simulator

Figure 1-2-2c: Target Test Function


1.2.3 Field Control Station - FCS

The FCS is the heart of the CENTUM VP Control System. It consists of dual
power supplies, dual communication cards and single or "pair and spare" redundant

RISC processor(s) depending on the required availability of the system.


The FCS performs all process control related actions. It contains the actual PID
and other controllers, switches, logics, sequences and advanced control algorithms. It
communicates via the ESB/ER bus with the NIUs and via VnetlIP (the real time
process control Local Area Network (LAN)) with the operator interface and the
engineering environment.

GIZR
SYSTEMS
------------we integrate

Project: ALSHABAB - 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
17 of 36
Rev. No.:

Figure 1-2-3a: Field Control Station

Figure 1-2-3b: Pair & Spare Configuration

1.2.4 110 Hardware - Field Network 110 (FlO)

110 Modules (FlO)

GIZR
SYSTEMS
VvE-:. lntegrate

Project: ALSHABAB - 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
18 of 36
Rev. No.:

The Input modules convert process signals to the digital data format used in the FCS.
Output modules convert the digital data format used in the FCS to analogue or contact
signals. I/O modules are available for all types of signals available in process industry.
FlO modules offer lots of flexibility in selection of connection with field signals viz.
pressure clamp terminals, MIL connectors and KS cable (Yokogawa's own system
cable) interface adapter. Dual redundancy is possible for all I/O modules and signal
types. HART compatible I/O modules are available, and realize a direct input of
HART signal to I/O module, without an intermediate HART multiplexers etc.

Field Network 1/0 (FlO) Configuration

FlO Eial:ure'

Direct Node:
fv'lax 10 NodeslFCS
Remote Node:
Max 14 NodeslFCS
Field COmmUnication
2 ports per RS card
4 segments I FF-H1

Figure 1-2-4a: Field Network 110 Configuration


The major I/O modules for FlO are listed as the following.

Table 1-2-4: 110 Module Line-up for FlO

GIZR
SYSTEMS
___. ._""...v-1e integrate

Project: ALSHABAB -1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricitv


Production Company

DOC No.:
IA-HT-C-AI-16-9S7-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
19 of 36
Rev. No.:

Description
16.::11 Analog Illput
16eh Analog In!)ut
16c11 A.nalo2: Input
16e11 Analog Output

.'\"."\1841

Sell Aualo2: hlput


Sell Analo!.: Outmtt

HART
Available

.,

Available

'If\

,,1

AAIl43
AAI543

Seh Analog hlPUt


Seh Analog OlifJmt
16c11 Analog hlput
16ch Analo2: Ollt}:lut

AAVl44

16e11 Analog Input

1~.AV544

16ch Analog0utput

AAT141

16ch Tie Input

ill'

AA..R181
AAI135

12ch RTUInput
8ch i\nalog IIlput

AAI835

4ch Analog Input


4ch Analog 0il1]Jltt

AA.Tl45

16ch TIC Input

AAR.145

SiO'llal
4 to 20 mA
1 to 5 V
-10 to 10 V
10 to lOY
4 to 20 mA.
1 to 5 V
4t020mA
4to 20mA.
4 to 20 lu..'\
1 toSV
-10 to 10 V
-10 to lOV

AAB841

.J

Model
AAI141
AAV141
AAV142
A.AV542

16ch RTD Input

AAP135

Seh Pulse fnput

AJJV141
ADV142
AD\1151
AJJV161
ADV551
AJJV561

16eh Digital Input


16ch Di2ital Input
32eh Digital Input
64.::h Di<>itaI Input
32c11 Digital Output
64.::h Digital Output

ADR541

16el1 Relay Output

ALRl11
ALR12 1
ALEl11
ALFlll
ALPIll

2port Serial Com


2port Serial Com
lport Ethernet Com
4port FF Com
Iport Profibus Com

T)~e

Available
Available

J, K; E, B, R. S, T, N
"

PUOO (3-wil'e)
4t020mA
4 to 20 mA
.A

Available

c..'lfi

T)-{ie ,J, K, E, B, R, S, T, N
111'

'

PtlOO (3-wire)
Potentiometer
Contact 011fOff (2-wire)
Voltage Pulse (2i3-wire)
Cum'mt Pulse (2-wire)
100 to 120 VAC
20010 240 VAC
24VDC
24VDC
24VDC
24VDC
24 to 110 VDe
.ill"l..

.L'<.
<>_.

.... 11''-'1

RS:ZJ1e<

Available

RS-422!RS-485
IEEE802.3, lOBASE-T
Foundation Fieldbus
Profius-DPVl

Remnt'ks

System I<;oIatioll
~tem Isolation
System Isolation
lI.!2ut Signal Selectable
~'5tem Isolation
Sysfem Isolation
hlPut Signal Selectable
System Iso11tion
Challnel Isolation
Channel Isolation
Channel Isolation
Input Sizual Selectable
Channel Isolation
Input S~al Selectable
Channel Isolation
System r'Solation
System Isolation
System Isolation
Sy;;tem I<;oiatioll
System Isolation
System Isolation
System Isolation

GIZR
SYSTEMS
-------~,.i'\fe ~ntegrE~

te

Project: ALSHABAB 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description: .

Client .REF: Tender No.

Sheet:
20 of 36
Rev. No.:

DCS TECHNICAL PROPOSAL OVERVIEW

ITel1nina! tfuok I
MlL connector COVl;lf

IlOModule

)
PreSSUfe clamp iemlinal

FD~EPS

Figure 1-2-4b: Signal Connector for FlO 110 Module

Node Interface Unit - NIU


The NIU is signal processing unit which convert and transmit analogue or digital
process I/O signals received from the field devices to the Field Control Unit (FCU)
for FlO. The NIU for FlO has Extended Serial Backboard (ESB) bus node units
(local node units) installed at the FCS station and remote node units installed in remote
cabinets.

GIZR
SYSTEMS
--____--_-we integratE:'

Project: ALSHABAB 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-1 0

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
21 of 36
Rev. No.:
0

Enhanced Remote Bus - ER Bus


The ER bus connects the remote node units to the FCS via ER bus interface modules
installed in direct nodes. The ER bus can be further extended via fiber optic cable
utilizing standard off-the-shelf fibber optic converters, for remote node installation.

1.2.5 Real Time Process Control Network - VnetJIP

Yokogawa's VnetlIP is a control network with high reliability and quick response. It

IS

a control bus conforming to IEEE 802.3 and UDPJIP, and has a transmission rate as
high as 1 Gbps. It uses commercially available cables, layer 2 switches, layer 3 switches
and the like.

VnetJIP connection topology utilizes a tree formation. Devices within domains are
connected using layer 2 switches. In a dual-redundant VnetlIP, buses 1 and 2
are independent subnets. Two independent communication routes exist in each bus.
In a VnetJIP network, a region in which devices are connected without using a router,

layer 3 switch or V net router is called a domain. VnetIIP constructs a network for each

domain.

GIZR
SYSTEMS
-____we ,nte\;lrale

Project: ALSHABAB - 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
22of36
Rev. No.:
0

HIS, ENG, SENG, SI,oS,


APeS, GSGW. Exaop!::

)
Layer :3 switch

Figure 1-2-5a: VnetlIP Network Configuration


VnetlIP System Components
Vnet/IP systems utilize commercially available networking devices. It enables to
make VnetlIP as open network, and utilize latest network technologies. VnetlIP enable

devices include PC equipments with VnetlIP interface card (VI701), Yokogawa's


control system, and general purpose equipments which use general Ethernet
protocol. The following Yokogawa's components can be connected to VnetlIP.

Human Interface Station (HIS)

Engineering Workstation (ENG)

Field Control Station (FCS)

Generic Subsystem Gateway (GSGW)

GIZR
SYSTEMS
------------vv0. inte(;;Jrate

Project: ALSHABAB -1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

Date:

Client .REF: Tender No.

DOC No.:
IA-HT-C-AI-16-987-10
Sheet:

23.12.2010

23 of 36

Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Rev. No.:

System Integration OPC Station (SIOS)

Exaopc (OPC Interface of CENTUM VP)

Advanced Process Control Station (APCS)

Field Communication Server for Plant Resource Manager (PRM)

o Safety Engineering Workstation (SENG)

Safety Control Station (SCS)

SOE OPC Server

Open Communication

The Open Communication on Vnet/IP network is achieved by using bus 2 of VnetlIP


)

network. Ethernet based devices can be connected to VnetlIP as Open Communication.


Control and open communication coexist in the same VnetlIP network. Bus 1 is used
for control communication and bus 2 is for open communication. If any failure occurs
on the bus 1, its control communication is automatically and instantly changed over to
Bus 2, and bus 2 communicates control and open communication until bus 1 recovery.
Yokogawa designed and take sufficient capacity for VnetlIP specification to prevent
any failure situation. The Open Communication is physically integrated to same
network as control communication, but logically segregated completely to make no
effect on control communication.
VnetlIP Secured Design

Generally speaking, as adopting an open technology the system will need to fight

GIZR
SYSTEMS
Project: AL5HABAB 1000 MW SIMPLE
CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
24 of 36
Rev. No.:
0

against the threat of cyber attack. To coexist with open network and secured network,
VnetlIP control network has well-considered strict secured functionalities. Yokogawa
developed the technologies of network security by the methods of distinctively
secured connection, entirely wrapped conduit, etc.
To make secured connection, Security Association will be established between every
Vnet/IP nodes such as HIS, ENG, FCS, etc., by making shared key. Each Security

Association is unique for each connection between individual nodes. The Security
Association with shared key is

mandatory to communicate with

other

nodes.

Additionally, the individual shared key will be updated periodically.

Figure 1-2-5b: Security Association between VnetlIP Nodes

In conventional CENTUM system, the Vnet protocol was used on a physical

Ethernet layer. This Vnet protocol is specific for Yokogawa system and never opened
its internal specification. In VnetlIP protocol, the conventional Vnet frame is wrapped
without any special modification, and transmitted by standard UDPlIP protocol. Even
if a packet on VnetlIP is listened illegally, it should be impossible to read the
original Vnet packet.

Page 24 of 36

GIZR
SYSTEMS
------------we int2r;;Jri'.1l.E:'

Project: ALSHABAB 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:

Client .REF: Tender No.

23.12.2010

Sheet:
25 of 36

Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Rev. No.:
0

Af
...

SA

Recei....er

T rans~iller

Figure 1-2-5c: Vnet Frame on VnetlIP Tagged


1.3 CENTUM VP MAJOR FEATURES

1.3.1 Expandability and Sizing

CENTUM VP provides a hierarchical system configuration to ensure flexible system


expansions.

The basic concept of the hierarchical system configuration is illustrated

below. For every system domain a total of 64 FCS and HIS can be connected. Incase
more stations are needed to fulfil the end user's requirements, more domains Can be
)

specified, up to maximum of 31 domains. The total system however remains fully


transparent throughout all these domains. For example, a HIS located in domain I can
provide the consolidated operation of all processes which are controlled by each
control system (domain 2, 3..... n) since all HIS have a large database to accommodate
the process data (1,000,000 tags). The process data/events monitored/controlled data by
each control system (domain 2, 3, ..... n) are transmitted to the HIS located in domain I
via a Layer 3 Switch so that an HIS can execute total plant operation located in
domain 1 as consolidated operator stations. For future expansions within the limits of
one particular domain, it is possible to add FCS in that domain.

GIZR
SYSTEMS
____we lnr.E::Clrar.e

Project: ALSHABAB - 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
26 of 36
Rev. No.:
0

Max.
Domaill!

...

Max. S1jStem

:f4

Figure 1-3-1: CENTUM VP System Scale


)

1.3.2 Total Integration


CENTUM VP can easily realise the total integrated control and management
solutions not only with subsystems such as high level computers, programmable logic
controllers (PLC), machine monitoring systems etc., but also with multi-vendor
software such as advanced control packages to provide single window operation.

Subsystem Integration
As an interface to subsystems, such as PLC, Vibration Monitoring System etc. a
communication card located in the FCS is provided.

This card has RS232C or

RS485/RS422 interface port or Ethernet, and the cable from the subsystem is plugged
into the port directly. The communication cards contain the subsystem driver

GIZR
SYSTEMS
_ .._.._-. we Integrate

Project: ALSHABAB 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

Doe No.:

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
27 of 36
Rev. No.:
0

IA-HT-C-AI-16-987-10

function. The transmitted data from the subsystem is stored in subsystem data image file,
and the stored data is transmitted to the standard CENTUM instruments andlor
sequence control elements in the FCS.

After the transmission, the data is

transferred into the database (CENTUM standard instruments/sequence control


elements) of the FCS. These are processed in exactly the same way as other CENTUM
YP data. The HIS can represent the subsystems data in the similar fashion as other
)

CENTUM data (face plates, graphics, etc.), ensuring full integration of the subsystem
into CENTUM YP. In case redundant communication is required, two communication
cards are used to update the subsystem data simultaneously.

FCS

SlOIqnsl"IOS oontrol

"Regulatory
controltl ook

block

rei

~
!Datfi

D~

mfarenoo

,.

f8ll?tting

Communicallon 1<'0 dam are.a

Communicalion module 1.'0 imilgl9'

ALE11i

Sllbs~'518m

oommunlcatlon
package

Ethamet
Sulx,ystem

SUbllystElm dam

Figure 1-3-2a: Data Flow of Subsystem Communication (In case of ALEnl)


Intelligent Integration
The CENTUM VP HIS is designed to support very large system (Max 1,000,000
Tags) to realize the total operation integration (consolidated Operator Station) for the

GIZR
SYSTEMS
..----...Vvt.o

,nte~Jra

te

Project: ALSHABAB 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
28 of 36
Rev. No.:
0

whole plant with unit-based operation. The HIS is also designed to provide operation
flexibility (CRT access level priority, operation groups etc.). Especially, operation
grouping is the effective function to segregate the operation functions among the HIS on a process unit basis - as if they are dedicated Operator Stations for a certain process
unit although this HIS has the total database for the overall process.
)

". "e::;:::i"I"- ""'


1Ptegrated

1."

"mIT" " .

.. J: Ins!:l"uments

E: Efectricai fadires
CiComputers

Figure 1-3-2b: CENTUM VP System Integration


1.3.3 Plant Resource Manager (PRM)
Today, networked production sites are becoming the norm. These networks greatly
improve maintenance work. Plant Resource Manager (PRM), the software package
from Yokogawa, offers a new style of maintenance tailored using the benefits of
intelligent field instruments. PRM is applied for both HART and Fieldbus
application plant to enable remote and automated maintenance functions. PRM
acquires device information including the device ID, various parameters, and selfdiagnostic information and other device related details, in addition to measured data.
This wealth of information is used for administration and supervision of assets such as
field devices, and also for remote automated inspections. PRM transforms the style of

GIZR
SYSTEMS
..._-we !megrd!.e

Project: ALSHABAB - 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

DOC No.:
IA-HT-C-AI-16-987-10

Production Company

Sheet:
29 of 36
Rev. No.:
0

maintenance from manual work mainly done on site, into IT-based automated device
management. PRM can support its users to embed the competency gap between the
latest technologies and current maintenance practices.

1.3.4 HART Communication


The FCS is able to connect HART devices directly via HART compatible I/O
modules, without any intermediate multiplexers. The analog data and HART variable
from field devices are stored in the I/O image area in analog I/O module, and
exchanged between I/O module and FCS controller. The HART related variables
can be transmitted on VnetlIP control network, and managed by PRM asset management
system. The typical configuration with HART instrumentation is shown as the
following.

<==k= PRM CK"nt


Field C-ommunica-tions Server

'11191

lIP

68401; G'S.B DUB Interfutce sla"", module,; In Loonl Node)


EB401: E.R bus interface- ",asmr modul,g (in Loca1 Nod.;.)
1:950'1: EA bU6 int9riaoQ. eln~ .m-c-dulp {In Remot-Q No-:lQ"/.

HART I/O module> (111 ..e,vi""')


HART flO module (stand-bY)

(dual.redundant)

Figure 1-3-4: System Configuration with HART

GIZR
SYSTEMS
- - - - w e integra!.E:'

Project: ALSHABAB - 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Production Company

DOC No.:
IA-HT-C-AI-16-987-10
Sheet:
30 of 36
Rev. No.:
0

1.3.5 Time Synchronization

VnetlIP control network of CENTUM VP has a capability to synchronize the time


between the stations connected via Vnet/IP. The time synchronization sets the clock
time in each VnetlIP station, at the same time the OS clock is also set by Vnet/IP master
time with inter-station time synchronization service.

Time Synchronization within a Domain

Time synchronization in each VnetlIP station within a domain is performed so that the
clock time is set to its own domain master station's clock. The domain master
station is the station that manages the setting information within a domain. The
master station within a domain is automatically selected from the VnetlIP stations
within the domain. Users need not be aware of the domain master station. The domain
master station broadcasts its own VnetlIP clock time (performs clock time multicasting)
periodically to the VnetlIP stations within the domains.

Time Synchronization between Domains

If multiple domains are present, Vnet/IP defines the time groups by domain
)

property in CENTUM VP engineering function on a domain-by-domain basis. Time


equalization will be carried out between domains belonging to the same time group. A
time group allows the selection of a Vnet/IP time master from the domain master station
within a domain belonging to the same time group. A VnetlIP time master is also
selected automatically. Users need not be aware of the VnetlIP time master. The time
group is specified by a number from 0 to 7. A domain specified with time group
number 0 is a special domain that the time is synchronized within the domain, and it is
not synchronized with other domains.

GIZR
SYSTEMS
__..we integrate

Project: ALSHABAB -1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

Doe No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
31 of 36
Rev. No.:
0

2.

PROPOSED

SYSTEM

FOR

ALSHABAB

POWER

PLANT

PROJECT
2.1 PROJECT SPECIFIC DETAILS:
Please refer to the following documents in our offer for project specific:

Des I/O Summary and Sizing

o DeS Bill of Material- Hardware

DeS Bill of Material- Software

DCS System Architecture Drawing

2.2 SCOPE OF WORK


2.2.1 Engineering:
Review of Input/Output List, Vendors logic diagrams and Piping & Instrumentation
Diagram (PID) for the Plant Systems mentioned in list of main Package

Generator Step Up Transformer


Auxilliary Transfomrer
Distribution Transformer
Generator Circuit Breaker
Diluge System for Step Up transformer
Oily waste sump system
MY Switchgear 6.6 KV
LV Switchgear
system shall Control/interface with the following areas:
Emergency Deisel Generator service water system-RO water system-Oemi water system
waste water and sewage treatment systems
Fire Pump System
ana shall Interface with:
Unloading Fuel Pumps
CEMS-Instrl.lment Air-Service Air-fan cooiers
Solar Oil Tank
Sevice Air and Instrument Air

DCS design will be based on Field Controllers with Input/Output Racks located in the MY
Switchgears rooms in order to mimize the field cable lengths, distributed in the following
areas

GIZR
SYSTEMS
__---_--\/'-ie

;nte~H"i'..lf.e

Project: ALSHABAB - 1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

Date:

Client .REF: Tender No.

DOC No.:
IA-HT-C-AI-16-987-10

Document Description:

Sheet:
32 of 36
Rev. No.:

DCS TECHNICAL PROPOSAL OVERVIEW

23.12.2010

Local control Station -1 to manage the Power Island - I and 2

Local control Station -2 to manage the Power Island - 3 and 4

Local control Station -3 to manage the Power Island - 5 and 6

Local control Station -4 to manage the Power Island - 7 and 8

Local control Station -5 to manage the BOP and Fuel Unloading area

The DCS will responsible to communicate through OPC TCP/IP with the Turbine
Control System, Mark VI for the CTG 1,2,3,4,5,6,7,8.
Our proposal is based on modbus communication with the Substation Automation
System (SAS), to be modified according to SAS provider requirement.
Modbus Communication with the Water Treatment Plant PLC.
Prepare wiring diagrams, panel front views and internal arrangement.
The DCS panels will be supplied with prefabricated terminal boards to minimize the
tennination work at site.
Preparation of factory test reports for the DCS.
Preparation of O&M manual and AS Built for the supplied DCS.

2.2.2 Manufacturing and Supply:


Manufacture the DCS systems and Marshalling panels.
Pack and transport the complete DCS panels to
Supply of Field cables from MV Swg and Local Boxes to
the DCS remote Input/Output racks distributed in the field.
Supply the Interconnecting Cables, Data Communication Cables.

Supply of 5 UPS for each system cabinet and One UPS for the control room

GIZR
SYSTEMS
_-____-we jntegrdt.e

Project: ALSHABAB -1000 MW SIMPLE


CYCLE GAS TURBINE UNITS

Customer: East Delta Electricity


Production Company

DOC No.:
IA-HT-C-AI-16-987-10

Date:
23.12.2010
Document Description:
DCS TECHNICAL PROPOSAL OVERVIEW

Client .REF: Tender No.

Sheet:
33 of 36
Rev. No.:
0

4.S KVA, 30 min


UPS Manufacturer: Mer1lin Gerin, ARTRONIC OR Equivalent
Note: A provision of 22,000 m cables CUIPVC/PVC/OS (14Xl.S mm), 6,000m
(14X2Xl.Smm) and SOOO m (7X2Xl.Smm).
Cables Payment to be as actual cable lengths used at site.

--)

2.2.3

Site Servies

Giza systems will handle the site services required to complete the job
- DCS Panels, Junction Boxes and Consoles Installation.
- Loop Check per Signal
- Function Test for each system
- Cables from Junction Boxes to DCS Laying and termination.

2.2.4

On shore Training:

Our proposal includes On site training for the Plant Operators & Maintenance Engineers.

2.2.5

Work out of scopc:-

- The custom duties and sales taxes will be paid by customer.


- Any civil work activities in the place of the panels.
- Supply or install any cable trays or Cable management Systems
- Any external electrical andlor mechanical installations to complete the job

Technical data sheets

Des System - Al Shabab Power Plant

Rev.O

Contents

index

Integrated Production Control


System CENTUM VP
System Overview (VnetllP Edition)

General
Specifications

CNTUMYp

~iJr

GS 33L01A10-40E

II GENERAL
VnetllP is a control network with high reliability and quick response and achieves steady response with little delay
even under heavy load. Using general-purpose network equipment conforming to IEEEB02.3 and UDPIIP standards,
it realizes open-based communications. VnetllP can connect to a V net system with a V net router. This GS
provides the system specifications, system configuration equipment, and network specifications for CENTUM VP
Systems with VnetllP.

II SYSTEM CONFIGURATION

---------------------------

I
I
I
I

Open
Display
Style
Console

Enclosed
Display
Style
Console
HIS

HIS
Human
Interface

VnetllP domain

---------------------------

SNTP

ProSafe-RS
Safety
Instrumented
System
.-----------.

I
I
I
I

: L3SW
Layer 3 switch

I L3SW
: Layer 3 switch

I
I

V net router

re!'l9=m

Remote node

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _________ ___________ J
F01E.ai

Figure Example of System Configuration

YOKOGAWA+

Yokogawa Electric Corporation


2-9-32, Nakacho, Musashino-shi, Tokyo, 180-8750 Japan
Tel.: 81-422-52-5634 Fax.: 81-422-52-9802

GS 33L01A10-40E
Copyright Feb. 2008 (YK)
1st Edition Feb. 4, 2008 (YK)

Contents

Index

IIiIl SYSTEM COMPONENTS


Human Interface Station (HIS)
An HIS serves as a human interface for operation,
monitoring, and engineering. Software packages
installed in a general-purpose personal computer (an
IBM PC/AT compatible computer, hereinafter referred
to as a general-purpose PC) or in a console HIS,
consisting of a general-purpose PC and Open Display
Style Console Assembly, implement operation and
monitoring functions as well as engineering functions.
Users can install and run operation and monitoring
functions and/or engineering functions in an HIS as
necessary. For connections to the VnetllP, a VI701
Control Bus Interface Card is used.
As for HIS hardware requirements, refer to following
General Specifications:
GS 33M50B40-40E "Enclosed Display Style
Console Assembly"
GS 33M50B50-40E "Open Display Style Console
Assembly"
GS 33M05D10-40E "Standard Operation and
Monitoring Function"
GS 33L50C10-40E "VnetllP Interface Card"

Field Control Station (FCS)


The FCS performs process control and manages
communications with subsystems such as PLCs. Two
types of field control stations for Vnetll P and FlO are
available:
AFV10S: Field Control Unit (for VnetllP, FlO, rackmounted)
AFV10D: Duplexed Field Control Unit (for VnetllP,
FlO, rack-mounted)
By mounting ESB Bus Coupler Module on FCS, local
node can be connected. By mounting ER Bus Interface
Master Module on FCS or local node, in addition,
remote node can be connected.

Advanced Process Control Station (APCS)


An APCS advanced process control station implements
control functions with a general-purpose PC
connected to a VnetllP, aimed at improving advanced
control and plant efficiency. For this purpose, install
LFS1200APCS control functions. Use VI701 Control
Bus Interface Card for connection to VnetllP. For
more details, see APCS Control Functions General
Specifications (publication GS 33M15U10-40E).

Generic Subsystem Gateway Package


(GSGW)
With a general-purpose PC connected to a VnetllP,
GSGW packages can collect and set data of various
types of subsystems using an OPC DA server. They
can easily collect and set subsystem data without
creating dedicated communications programs.
Install LFS1250 Generic Subsystem Gateway Package.
Use VI701 Control Bus Interface Card for connections
to VnetllP. For more details, see publication GS
33M20F10-40E.

Safety Instrumented Systems (ProSafe-RS)


ProSafe-RS has been approved by German safety
test labs TOV (Technische Oberwachungs Verein) as
the SIS (Safety Instrumented System) that meets SIL
(Safety Integrity Levels) 3 established by IEC 61508.
The SCS (Safety Control Station) for ProSafe-RS
monitors the safety state of plants and performs
predetermined safety operation according to each
request for safety control. The SENG (Safety
Engineering PC) performs engineering and
maintenance of SCS. Moreover, ProSafe-RS can be .
integrated with CENTUM VP and enables operation
and monitoring of SCS from HIS.
For details, refer to GS 32S51B10-01E Safety
Instrumented Systems ProSafe-RS System Overview
(VnetllP Edition)".

System Integration OPC Station (SIOS)


As for FCS hardware requirements, refer to following
General Specifications:

GS 33L50E20-40E "Field Control Unit (for VnetllP


and FlO)"
GS 33M50E25-40E "ESB Bus Coupler Module"
GS 33M50F25-40E "ER Bus Interface Master
Module (for FlO)"
GS 33M50F20-40E "Node Units (for FlO)"
GS 33L50F10-40E "FlO System Overview (for
AFV10D)"

All Rights Reserved. Copyright 2008, Yokogawa Electric Corporation

System Integration OPC Station (SIOS) is a station


used when other companies' PCS (Process Control
System) is integrated to CENTUM VP system. It
provides functions to import other companies' PCS data
to CENTUM VP using OPC (OLE for Process Control)
and to have CENTUM VP receive alarms and events
occurred in other companies' PCS.
LBC2100 System Integration OPC Client Package is
installed. For connection with VnetllP, VI701 (VnetllP
Interface Card) is used.
As for details, refer to GS 33M20D10-40E "System
Integration OPC Client Package".

GS 33L01A10-40E Feb. 4, 2008-00

Contents

Index

VnetllP

Boundary Router

VnetllP is IEEE802.3 compliant control bus configured


with dual-redundant busses. Each dual-redundant
bus is configured with a layer 2 switch (*1) with
the maximum transmission speed of 1Gbps and
1000BASE-T cables and devices in a domain are
connected in star connection or tree connection.

Boundary router is a network device to connect VnetllP


with external network such as in-house LAN. Bus 2 is
used for connection with external network. Boundary
router needs to have firewall function to protect
CENTUM VP from the threat of external network. Use
all-purpose, commercially available boundary router.

VnetllP dual-redundant bus 1 is exclusively used for


control communication and bus 2 is used not only for
control communication but for open communication by
a various kind of standard protocol based on Ethernet
Bus 2 enables data access by Exaopc OPC interface
and communications based on TCPIIP protocol.
General-purpose, commercially available products are
used for network device such as repeaters, cables,
layer 2 switches and layer 3 switches for VnetllP.
In VnetllP, IPv4, ClassC private address is used as IP
address for communication. (Some ClassB private
address is also used.)
*1:
Layer 2 switch is a switching HUB with a bridge
function and it does not send data to terminals
other than destination. Using layer 2 switch
reduces bus traffic.

V net Router
A V net router is a device to connect a VnetllP
domain and a V net domain for relaying control
communications. This router realizes operation and
monitoring of a control station in one domain from
another domain by connecting the VnetllP and V net
domains. The following product is available:
AVR10D: Duplexed V net Router (for redundant use of
communications and power supply modules)
For the hardware specifications, see publication GS
33L50D30-40E.

SNTP Server

Layer 3 Switch

When synchronizing the time of the VnetllP station with


UTC (Coordinated Universal Time), the SNTP server is
connected .

Layer 3 switch is a network device to connect VnetllP


domains. It has path control by IP address and a
routing function to relay communication frame in two
domains when necessary. Use layer 3 switch which
relays communication frame by hardware at high
speed. Use all-purpose, commercially available layer
3 switch.

Since an HIS supports Microsoft Windows Vista,


Windows XP, or Windows Server 2003, windowscompatible peripherals, such as printers, can be used.
Consult Yokogawa for more details on peripherals that
can be used with an HIS .

Peripherals

.>

All Rights Reserved. Copyright 2008, Yokogawa Electric Corporation

GS 33L01A1O-40E Feb. 4, 2008-00

Contents

Index

Field Communications Server for Plant Resource


Manager (PRM)
V net Router (AVR10D)
On the bus-2 side, up to 124 general-use Ethernet
devices (including intelligent network devices) other
than listed above can be connected.

iii SYSTEM SPECIFICATIONS


HIS Operation/Monitoring Capacity (Tags)
Number of tags: Up to 100000 (when using LHS4000,
up to 1000000 per system)
Number of tags that can be entered in one HIS: Up to
100000 (*1)
*1: \M1en a system is configured as CENTUM VP
Entry Class; however, the maximum number of
tags shall be 8000.

Expanded System
A layer 3 switch allows a hierarchical construction
with other VnetllP domains. In addition, a V net router
allows connection to a system using other V nets or
VL nets. Existing systems (via an HF-bus or RL-bus)
cannot be directly connected to a VnetllP network.
These systems can be connected via a BCV on a V
net. A hierarchical connection using a layer 3 switch
and a V net router allows a system expansion that
exceeds the maximum system indicated in the previous
section. In other words, hierarchical connections
of other control systems allow hierarchical system
expansion at the core of CENTUM VP.
Total number of interconnected domains: Up to 16
(VnetllP domains + V net domains)
Hierarchical connections by V net router: Three-level
control bus hierarchy, i.e., three control
bus levels, linked by two bus converters
Number of tag names: Max. of 100000 (up to
1000000 per system when using
LHS4000)
Connecting devices: V net routers and bus converters
Note that the levels ofVnetllP domains on an access
router and the levels of V net routers are not counted
when hierarchical connections are restricted.

Minimum System
A minimum system consists of one HIS and one FCS.
Maximum System
In a CENTUM VP system, a system within an area that
does not communicate via devices such as routers,
layer 3 switches, or the like is called a domain. Up to 64
VnetllP-enabled devices per domain can be connected.
Our VnetllP-enabled devices include equipment with
VI701 (control bus interface cards) incorporated in
a general-purpose PC, FCS for VnetllP and V net
routers. The following lists our specific VnetllP-enabled
devices:
.
Human Interface Station (HIS)
Field Control Station (FCS)
Advanced Process Control Station (APCS)
Generic Subsystem Gateway (GSGW)
System Integration OPC Station (SIOS)
Safety Instrumented Systems (ProSafe-RS)
OPC Interface Package (Exaopc) OPC server

- - - - - -- --,
I

VnetllP domain
Ff==;;FFf._TI V net router

Layer 3 switch

V net domain

)
V net domain
BCV-V
FCS

BCV-H

V net domain

HF-bus domain
EFCS
I

FCS
I

,-------_ ....
Bus converter
(0 level)
One control-bus
level

: BCV-V: Bus converter


I 0J net to V net}
: BCV-H: Bus converter
I (HF-bus to V net)

----------------------------------------~

One bus-converter level


and one control-bus level
that are connected via
a V net router

Two bus-converter levels and


three control-bus levels (max.)
connected via a V net router

FD2e..1

Figure Expanded System Configuration

VnetllP domains and V net domains can be managed in the same project. In addition, these two domains can be
integrated with a multiple project connection package.
As for details of Multiple Project Connection Package, refer to GS 33M05K20-40E "Multiple Project Connection
Package".
All Rights Reserved. Copyright 2008. Yokogawa Electric Corporation

GS 33L01A10-40E Feb. 4. 2006-00

Contents

Installing of Server pes


Each number shown below includes the number of CS
3000 station.
CENTUM VP realizes many functions using file sharing
function of Windows. The number of PCs to share
files simultaneously is restricted on the Windows
Workstation OS. Therefore, when there are 9 or more
stations (HIS, ENG, Exaopc) in one project, the server
PC may be required.
Please count the total station number in one project
using the equations shown below in order to judge
whether server PC is required or not. If the number
is eight or smaller, a server PC is not required. If the
number is larger than 8, consult our sales rep for
further examination.

Index

In case of PCs storing master Engineering


database file
When not using Engineering Tool for Foundation
Fieldbus (SSS5700)
Total station number =
HIS + ENG - 1) x 2) + Exaopc
When using Engineering Tool for Foundation Fieldbus
(SSS5700)
Total station number =
HIS + ENG - 1) x 2) + Exaopc + 2

In case of PCs storing Audit trail data


When using LHS5170 Access Administrator Package,
one PC which is dedicated to the audit trail data must
be prepared. When there are 9 or more stations (ENG,
Recipe Management PC) in one project, the server PC
may be required for storing Audit trail data.
Please count the total station number in one project
using the equations shown below in order to judge
whether server PC is required or not. If the number
is eight or smaller, a server PC is not required. If the
number is larger than 8, consult our sales rep for
further examination.
Total station number ENG + Recipe Management

ENG:

Number of PCs in which Standard Builder


Function (LHS5100 or LHM5100) is
installed.
Recipe Management: Number of PCs in which CS
Batch 3000 Recipe Management package
(LHS5161) is installed

HIS:

Number of PCs in which Standard


Operation and Monitoring Function
(LHS1100 or LHM1101) is installed
ENG:
Number of PCs in which Standard Builder
Function (LHS5100 or LHM5100) is
installed.
Exaopc:
Number of PCs with Exaopc Interface
Package (NTPF100)
When using Multiple Project Connection Package
(LHS4450), please see the specifications for Multiple
Project Connection Package (GS 33M05K20-40E).
When using Expanded Test Function (LHS5425),
server PC is always required for storing master
Engineering database.

All Rights Reserved. Copyright 2008, Yokogawa Electric Corporation

GS 33L01A10-40E Feb. 4, 2008-00

Contents

index

Models AFV10S, AFV10D


Field Control Unit
Duplexed Field Control Unit
(for VnetllP, for FlO, 19" Rack Mountable
Type)

General
Specifications
GS 33L50E20-40E

II! GENERAL
This GS covers the hardware specifications of the
Field Control Unit which is the processor of the Field
Control Station (FCS).

II! HARDWARE SPECIFICATIONS


For the installation specifications and the environmental
conditions common to the systems, refer to "VnetllP
System Overview (GS 33L01A10-40E)."

Processor
VR5432 (133 MHz)

Main Memory Capacity


32 Mbyte

Memory Protection During Power FailUre


Battery
Battery Back-up for Main Memory: Max. 72 hours
Battery Recharge Time: Min. 48 hours

FCU Status Contact Output


2 terminals (NC, C)
Contact Points open during FCU failure
Contact Rating: 30 V DC, max. 0.3 A

F01E.al

[19" Rack Mountable Type FCU]

Communication Interface
VnetllP Interface: Dual-redundant
ESB bus interface:Dual-redundant or Single(ln case
ofAFV10D, always Dual-Redundant.)

VnetilP Communication Speed


1000 Mbps Full Duplex

Connection Specifications

Cable: CAT5e (Enhanced Category 5 cable), UTP


Transmission:
1000Base-T and 100Base-TX compliance
Connector: RJ45 connector
Max. distance: 100 m (Distance betweenAFV100
and Layer 2 switch)
Autonegotiation

When connecting a Remote Node to FCU, install ER


Bus Interface Master Module (EB401) to FCU.
To make single configuration, EB401 must be
installed in an odd-number slot, and make a space on
the right side of the installed EB401.
See "ER Bus Interface Master Module (for FlO), (GS
33M50F25-40E) for further information.

Power Supply
(specify with Suffix Codes)
Voltage:
100-120 V AC, Frequency: 50/60 Hz
Voltage:
220-240 V AC, Frequency: 50/60 Hz
Voltage:
24 V DC

Power Consumption

No. of Node Units Connectable


Max. 14/FCU
The total number of the local and remote nodes that
can be connected to FCU are 14 or less. (The local
nodes: 9 or less)
3 or less normally; however, can be expanded to 14
if LFS 1530 Application capacity Expansion Package
(for AFV100) is purchased.

No. of I/O Modules

100-120 V AC: 200 VA


220-240 V AC: 230 VA
24 VDC: 5.5A

Weight
Approx. 7 kg (AFV10S)
Approx. 8 kg (AFV10D)

Mounting
19" Rack Mounting:
Rack mount (M5 x 8 screws)
Insulation bush (accessory)

Max.8/Node

Local Node Connection


When connecting a Local Node to FCU, install ESB
Bus Coupler Module (EC401) to FCU.
EC401 must be installed in slot 7 and slot 8. To make
single configuration, EC401 must be installed in slot
7, and Slot 8 must be empty.

YOKOGAWA+

Remote Node Connection

Connection
Power Supply: M4 screw terminal connection
Grounding: M4 screw terminal connection
Contact Output: M4 screw terminal connection
Network: Connect CAT5e (Enhanced Category 5
cable) to Layer 2 switch.

Yokogawa Electric Corporation


2-9-32, Nakacho, Musashino-shi, Tokyo, 180-8750 Japan
Tel.: 81-422-52-5634 Fax.: 81-422-52-9802

GS 33L50E20.40E
Copyrighl Feb. 4, 2008{YK)
1sf Edition Feb. 4, 2008{YK)

Contents

Index

Local Node Connection


When connecting a Local Node to Compact Field Control Unit (for FlO), install ESB Bus Coupler Module (EC401) to
Compact Field Control Unit (for FlO).
EC401 must be installed in slot 7 and slot 8. To make single configuration, EC401 must be installed in slot 7, and Slot
8 must be empty.
Power Supply
(Specify with Suffix Codes)
Voltage:
100-120 V AC, Frequency: 50/60 Hz
220-240 V AC, Frequency: 50/60 Hz
Voltage:
Voltage:
24 V DC

Electric Power Consumption


100-120VAC: 200 VA, 120W
220-240 V AC: 230 VA, 120 W
24 V DC: 5.5A

Weight
10 kg (incl. 810Ms)

Regulatory Compliance
For the detailed information of following standards, see "Integrated Production Control System CENTUM VP System
Overview (GS 33M01A10-40E)."
Safety Standards
[CSA]
ICE Mark]

(for 100-120 V AC and 24 V DC power supply)


(for 220-240 V AC and 24 V DC power supply)

EMC Conformity Standards


ICE Mark]
IC-Tick Mark]

(for 220-240 V AC and 24 V DC power supply)


(for 220-240 V AC and 24 V DC power supply)
Standards for Hazardous Location Equipment
[CSA Non-Incendivej (Remote Node only, for 100-120 V AC and 24 V DC power supply)
[FM Non-Incendivej (for 100-120 V AC, 220-240 VAC and 24 V DC power supply)
(for 24 V DC power supply)
[Type nJ

III CONFIGURATION

Rack Mounting
Card configuration

Power Supply Module: Two modules in case of a dual-redundant configuration.


Power supply to the 110 Modules, and supply power to the transmitters.
The power supply terminals use M4 screws.
Bus Interface Module: Two modules in case of a dual-redundant configuration.
E5B Bus Interface Slave Module (5B401)
ER Bus Interface Slave Module (E8501)

III LIMITATIONS OF INSTALLATION AND NOTICES FOR iNSTALLATION


For installing 110 modules in node unit, the quantity and allocation are limited. Also, when installing a node unit to
the dedicated cabinet, there are limitations of installation under the ambient operating temperature conditions. When
modules with built-in barriers are installed in any node unit, an insulating partition (Part No. T9083NA) must be
installed.
For details, please refer to "Limitations and Precautions for Installation (GS 33M50F10-40E)."

All Rights Reserved. Copyright 2008, Yokogawa Electric Corporation

GS 33M50F20-40E

Feb. 4, 2008-00

Contents

Index

II EXTERNAL DIMENSIONS
ANB10D, ANB10S Node Unit for ESB Bus (Figure of ANB10D)
Unit: mm

~BI
DO
0
0
0
0

JBB
DO ~ ~ ~ ~
I=F
o\--"0
0

482.6
465.1

8.75
21.3

205
150.6

18.4

440

,r-

~HHH~~O

221.5

I~

Hole for 19" rack mounting

37.75

(4 x M5 screw holes)
F03E.a1

ANR10D, ANR10S Node Unit for ER Bus (Figure of ANR10D)


Unit: mm

)
4826
465.1

8.75
21.3

205
150.6

18.4

440

rfl>
146
22 1.5

_fl:

I[ ~
RI

~ ~~ ~ ~

r~ i

I-

I.'~
\

37.75

All Rights Reserved. Copyright 2008. Yokogawa Electric Corporation

I~

l-

t Ie

mID

lIE
IlLBo'

Hole for 19" rack mounting


(4 x M5 screw holes)

GS 33M50F20-40E

F04E.a1

Feb. 4. 2008-00

Contents

1\1

~Index~

MODELS AND SUFFIX CODES

Node Unit for Single ESB Bus (19" Rack


Mountable)

Node Unit for Single ER Bus


Description
Model

Description
Model

ANB10S
-3

Node Unit for Single ESB Bus


(19" Rack Mountable)
Single power supply

.4"...................... Duai:redundanipowersuppiY.
Suffix
Codes

100 - 120 V AC power supply

ICU1 N

............ Co;:;-~eclor"ljnitWiihTe;minaio;:for

Suffix

Codes

:::::::r::::::::::::::: :~!t~~9~~CZ:~~~t:~~Ei?~i.:::~:::::~::::~:::
o

3
IATDOC

Option
Codes

Z~f~:9.:'::::::::: :~~:~~~l~~i~!~:~!~:~;~~~~~~~::
(Mandatory for connection with
AFF50D orAFV10o)

Node Unit for Dual-Redundant ESB Bus (19" Rack


Mountable)

..................._........ 'softWars'L:lcenss'for'Nods'EXpans'i'on"
IN DEL

Node Unit for Dual-Redundant ER Bus


Description
Model

ANR 100
-4

ANB10D
-4

Node Unit for Dual-Redundant ESB


Bus (19" Rack Mountable)
Dualredundant power supply
100 - 120 V AC power supply

1
Suffix

Codes

24 V DC power supply
Basic type

ICU2T

Connector Unit with Terminator for


ESBBus

Z~f.~!?:~~::::~: ::~P.[~~~i?~:~:~~!i.?~~~:M~~~i.(::::::~:~::::::::::
!NOEL

Node Unit for Dual-Redundant ER


Bus (19" Rack Mountable)
Dual-redundant power supply
100 - 120 V AC power supply

:::::I:~~::::::::::::: :~~Q:::~~.:y!::.:P.~~~~~~P.P.~.::::::::::~::::::~:
4

24 V DC power supply
8asictype

._.........; ............. ViiitiiisAG3..;;ptiona~dtempe;~iUis

::~:::~::::::::::::::~::: :?3..:::3.~9.Si.!::.:p.~~~~~~!?!?~i.:::::::::::::::::::::

..1 WttiiSAStandard. G30ptior;


Connector Unit for ESB Bus
...ICU2N
-...............................................................................................................
..
Option
Codes

(Mandatory for connection with


AFF50D or AFV1 00)

Note: Ttype Connector of ER Bus (YCB146) is supplied


with this unit.

Description

Suffix
Codes

(-20 to 70 DC) option


Explosion Protection Manual

ESBBus

!NDEL

ModeJ

Basic type

........................... ViiitiiisAG3opii;;nandtemperatuffi

..opiion-

.;~~~.~

Option
Codes

isASianda~dG3

Connector Unit for ESB Bus

Dual-redundant power supply


100 -120 VAC power supply

-4

24 V DC power supply
Basic type

......_..................... Viiilh..

Node Unit for Single ER Bus


(19" Rack Mountable)

.~........................~~~\!~~.r.~~~E.~~f?!?~Y...........................................

:~:::I:~::::::::~:::~ :??Q:~~?~.:Y..!::.~p.~Y.i.~i:~~p.p.~::::~:::::::::~::::
4

ANR10S

IATDOC

Option

............................

Codes

INDEL

(-20 to 70C) option


Explosion Protection Manual
'S;;ftWare'Licen'ss'for"Node'Expa~sioii"

(Mandatory for connection with


AFF500 or AFV1 00)

Note: T-type Connector of ER Bus (YCB146) is supplied


with this unit.

Software License for Node Expansion


(Mandatory for connection with
AFF50D or AFV10D)

All Rights Reserved. Copyright 2008, Yokogawa Electric Corporation

GS 33M50F20-40E

Feb. 4. 2008-00

Contents

Index

Dummy Cover

Model

ADCV01
ADCV02

Description
Dummy Cover (for 110 Module)
Dummy Cover (for Power Supply Module)

Insulating Partition
Description

Part No.

T9083NA

Insulating Partition

Note: When mounting an FlO module with built-in barrier to a node unit, place this part to the 8th slot.

lIIII ACCESSORIES AND SPARE PARTS


Parts Names

Parts Numbers

Description

Quantity

4
1
2
2
4

Accessory

Tjunction

Insulating bush

S9049PM

Accessory assembly

S9768UK

ANR10S

Accessory assembly

S9768UK

ANR10D

Clampfifter

A1193MN

ANR10S

Clamp filter

A1193MN

ANR10D

Remarks

Content of S9768UK
Coaxial connector

A1120JA

Cover

T9072MB

Cover

T9072MC

1
1

III ORDERING INFORMATION


Specify the model and suffix codes.

lIIIITRADEMARKS
CENTUM is a registered trademark ofYokogawa Electric Corporation .
Other product and company names appearing in this document are trademarks or registered trademarks of their
respective holders.

All Rights ReselVed. Copyright 2008, Yokogawa Electric Corporation


Subject to change without notice.

GS 33M50F20-40E Feb. 4, 2008-00

Contents

Index

VnetilP NETWORK SPECIFICATIONS


The VnetllP is a real-time process control network used to connect system components. The VnetllP supports
two types of communications: control-bus communications and open communications. The VnetllP is always dualredundant. Usually, control bus communications are carried out via bus 1. Open communications are carried out via
bus 2. If a control communications error occurs at the bus-1 side, control bus communications will be carried out via
bus 2. The VnetllP uses general-purpose communications devices for network connection.

~2APCSGSGW
HISENG
Exaopc

F03E 1

Figure Network Configuration

Connection within a Domain


In a system used with the VnetllP, sections separated by communications devices, such as routers, layer 3 switches,
etc., are called domains. One domain allows the connection of up to 64 of our VnetllP-based devices including the
FCS, HIS, etc. In addition, a maximum of 124 devices, which includes switches, routers, etc., can be connected in
configuring a network with Ethernet devices other than our VnetllP-based devices.
Devices in a domain are connected in a star or tree-like fashion at the core of a layer 2 switch. A dual-redundant Vnetl
IP bus is an independent subnet for each line; therefore, a layer 2 switch should be installed in each line. Up to seven
levels of layer 2 switch connections can be connected in a domain.

Inter-domain Connection

General-use layer 3 switches allow connections between VnetllP domains. Up to 16 domains can be connected.
Up to 15 level (i6-hierarchical) connections ofVnetllP domains can be connected.
Two types of VnetllP domain connections are possible: bidirectional and hierarchical connections. In bidirectional
connections, HIS's in both domains can perform operation and monitoring of the other domain.
Bidirectional Connection
Both HIS's can perform operation and monitoring of the other domain. Stations in both domains can receive and send
FCS and HIS messages.
Hierarchical Connection
Hierarchical domain relations are established. The HIS of a high-order domain can operate and monitor a low-order
domain. FCS and HIS messages generated in a low-order domain can be accepted by a station in a high-order
domain. A V net conversion router allows connection to a system connected to a V net. Connection to an existing
system (via an HF-bus or RL-bus) connected with a BCV via a V net is also possible.

All Rights Reserved. Copyright 2008, Yokogawa Electric Corporation

GS 33L01A 10-40E

Feb. 4. 2008-00

Contents

Index

Communications Specifications

Network Device Specifications

Control bus communications

Layer 2 switch

Communication Method: Read/write communication,


message communication, and link
transmission
Link Transmission Period: 100 msec

Open communications
Open communications are executed via the bus-2
side. Connected with commercially available Ethernet
communications devices.
The bandwidth that can be used for open
communications via the bus-2 side is up to 300
Mbps.

Transmission Path Specifications


Network Topology: Star formation
Transmission Path Redundancy: Available (control
bus communications only)
Transmission Cable: Unshielded twisted pair (UTP) at
enhanced category 5 or greater.

--)

Connection

Between station
and layer 2
switch
Between layer 2
switches

Between layer 2
switch and router
*1:

Cable
Standard

100BASE-TX
(IEEEB02.3u)
1000BASE-T
(lEEEB02.3ab)
1000BASE-T
(IEEEB02.3ab)
1000BASE-LX
(lEEEB02.3z)
1000BASE-T
(IEEEB02.3ab)
1000BASE-LX
(IEEEB02.3z)

Speed

100 Mbps
(*1)

Maximum
Distance

Connection Port: 1000BASE-T, full duplex


Connection between switches: 1000BASE-T,
1000BASE-LX with speed, 1 Gbps (1.5
Mpps@64 byte) or faster, full duplex
Auto-Negotiation: Essential

Layer 3 switch
Connection Port: 1000BASE-T, full duplex
Connection between switches: 1000BASE-T,
1000BASE-LX with speed, 1 Gbps (1.5
Mpps@64 byte) or faster, full duplex
Unicast dynamic routing protocol: RIPv2 (RIPv1
compatible mode essential)
Multicast Protocol:
IGMP:
Essential
DVMRP or PIM-DM: Essential
Management function
SNMP

Address Used for VnetilP


100m

1 Gbps
1 Gtips

100m

1 Gbps

5km

1 Gbps

100m

1 Gbps

5km

For V net Router, SCS and Open communication


network.

Communications between Devices


Maximum distance between arbitrary stations: 40 km
Only a couple of media converter between devices
can be connected.

Class C private address is used for communications


for control and open communications.
For Yokogawa equipment supporting VnetllP, three
IP addressed are automatically provided: one for
bus 1 control communication; one for bus 2 control
communication; one for bus 2 open communication.
Communications for control
Bus-1 side 192.168.(Domain No.).1 to 129.254
Bus-2 side 192.168.(128 + Domain No.).1 to
129.254
Open Communications
Bus-2 Side 192.168.(128 + Domain No.).130 to 253
The following addresses are used for multicast
communications.
For stations within domains
Bus-1 side 239.192.24.0
Bus-2 side 239.192.24.1
For all domains
Bus-1 side 239.192.24.4
. Bus-2 side 239.192.24.5
Class B address is used for the TCPIIP protocol
communications on VneVIP.
Make sure that there are no overlaps in IP addresses.

All Rights Reserved. Copyright 2008, Yokogawa Electric Corporation

GS 33L01A10-40E

Feb. 4, 2008-00

Contents

Index

IIII/O COMMUNICATIONS BUS


ESB Bus
Application
An ESB bus is an I/O communications bus that connects the processing unit of an FCS to a local node.
Communication Specifications
Connectable Devices: Node units (ANB10S and ANB10D)
Number of Connectable Devices: The number of local node units that can be connected to an ESB bus varies
according to the database selected.
Database
Control Function for Standard Field Control Unit (*2)
Control Function for Standard Reid Control Unit plus Application Capacity
Expansion Package
*1:
*2:

Maximum Number of
Local Nodes
3

Total Number of
Local and Remote Nodes (*1)
3

14

The total should not exceed this number.


If local node units are connected to an AFV1 OS or AFV1 OD FCU, ESB Bus Coupler Modules (EC401) should be installed in
~~7~&
.

Transmission Path Specifications


Network Topology: Bus formation
Transmission Path Redundancy: Available
Transmission Speed: 128 Mbps
Transmission Cable: Dedicated cable (YCB301)
Transmission Distance: 10m max.

ER Bus
Application
An ER bus is a remote I/O communications bus to connect an FCU or local node unit to a remote node.
Communication Specifications
Connectable Devices: Remote node units (ANR10S, ANR10D)
Number of ER buses: Max. 4 per FCU
Number of Connectable Devices: The number of remote node units that can be connected to an ER bus varies
according to the model and database selected.
Database
Control Function for Standard Field Control Unit
Control Function for Standard Field Control Unit plus Application Capacity
Expansion Package
*1:
*2:

Maximum Number of
Remote Nodes
3

Total Number of
Local and Remote Nodes (*1)
3

14 (*2)

14

The total should not exceed this number.


Up to eight remote nodes per ER bus can be connected.

All Rights Reserved. Copyright 2008, Yokogawa Electric Corporation

GS 33L01A10-40E Feb. 4, 2006-00

Contents

Index

Transmission Path Specifications


Network Topology: Bus formation
Transmission Path Redundancy: Available
Transmission Speed: 10 Mbps
Transmission Cable: Coaxial cable (YCB141, YCB311). Use YCB 147 ER-bus Adapter and YCB 149 ER Bus
Converter Unit for connecting YCB 141 and YCB311 cables.
Transmission Distance:
YCB141: Max.185 m
When mixing YCB141 and YCB311:
Length ofYCB141 + (185/500) x Length ofYCB311 ::; 185
Number of Bus Adapter Units: Max. 4 per segment (*1)
General-purpose Ethernet Repeater (*2):
The total transmission distance is limited by the number of repeaters.
L:=; 4 - 0.5 x n
L: total transmission distance (km)
n: the number of the general-purpose Ethernet repeater (Max. 4 repeaters)
*1:
*2:

When ER bus is connected with a repeater, one segment means the area between repeaters.
General-purpose Ethemet repeater can be installed in only non-hazardous areas.
EB401

.)

AFF50D
(Nadel)

I.4'EB401

. I " III~I~IBBII

--

ER bus

""'--

ANR10D (Node2)

. IIIII

I]

flEB50l

LL

I
I Repeaterl LRepeate~

LRepeate~ l RepeaterJ

F04 '

Figure Example of ER Bus connection

All Rights Reserved. Copyright 2008, Yokogawa Electric Corporation

GS 33L01A1D-40E Feb. 4, 2006-00

Contents

10

Index

III SOFTWARE
Operation and Monitoring Software
LHS1100 Standard Operation and Monitoring
Function
LHS1120 Console HIS Support Package for
Enclosed Display Style
LHS1130 Console HIS Support Package for Open
Display Style
LHS 1150 Server for Remote Operation and
Monitoring Function
LHS2411 Exaopc OPC Interface Package (for HIS)
LHS2412 CENTUM Data Access Library
LHS4000 Million Tag Handling Package
LHS4100 Configured Information Reference
Package
LHS4150 Recorder Output Package
LHS4190 Line Printer Support Package
LHS4200 Consolidated Historical Message Viewer
(Meeting FDA)
LHS4410 Control Drawing Status Display Package
LHS4420 Logic Chart Status Display Package
LHS4450 Multi Project Connection Package
LHS4600 Multiple-monitor Package
LHS4700 Advanced Alarm Filter Package
LHS6510 Long-term Data Archive Package
LHS6530 Report Package
LHS6600 CS Batch 3000 Process Management
Package
LHS6710 FCS Data Setting/Acquisition Package
(PICOT)
SSS4510 Long-term Trend Historian
For details on the above functions, see the respective
GS's.
The operating system for an HIS is Windows Vista
Business Edition or Windows XP Professional. If it is
necessary to run other third-party software on the HIS,
contact our sales representative to confirm that it is
supported.

Engineering Software
LHS5100
LHS5110
LHS5150
LHS5160
LHS5161

Standard Builder Function


Access Control Package
Graphic Builder
CS Batch 3000 Builder
CS Batch 3000 Recipe Management
Package
LHS5170 Access Administrator Package (FDA: 21
CFR Part 11 compliant)
LHS5420 Test Function
LHS5425 Expanded Test Functions
LHS5426 FCS Simulator Package
LHS5427 HIS Simulator Package
LHS5450 Multiple Project Connection Builder
LHS5490 Self-documentation Package
For details on the above functions, see the respective
GS's.

Standard FCS Software


LFS1500

Control Function for Standard Field


Control Unit (for FlO, VnetllP)
LFS 1530 Application Capacity Expansion Package
(for AFV1 00)
For details, see publication GS 33L 15C20-40E.

Optional FCS Software


LFS3132 Valve Pattern Monitor Package
LFS8620 Off-site Block Package
For details on these functions, see the respective GS's.

All Rights Reserved. Copyright 2008, Yokogawa Electric Corporation

GS 33L01A1~OE

Feb. 4,2008-00

Contents

.~

..

Subsystem Communication Software

Operation Support Software (for HIS)

For each subsystem, optional communications software


is available.
LFS2410 FA-M3 Communication Package (for
ALR111, ALR121)
LFS2420 YS Communication Package (for ALR121)
LFS2421 YS Communication Package with Direct
Connection (forALR121)
LFS2430 MELSEC Communication Package (for
ALE111)
LFS2431 FA-M3 Communication Package (for
ALE111)
LFS2432 DARWINIDAQSTATION Communication
Package (for ALE111)
LFS2433 PLC-5/SLC500 Communication Package
(for ALE111)
LFS2453 Modbus Communication Package (for
ALE111)
LFS2456 SLC500 Communication Package (for
ALR111, ALR121)
LFS2457 PLC-5 Communication Package (for
ALR111, ALR121)
LFS2542 PROFIBUS Communication Package (for
ALP111)
LFS2610 Foundation Fieldbus Communication
Package (forALF111)
LFS2710 HART Communication Package (for
AAlhhh-H)
LFS9153 Modbus Communication Package (for
ALR111, ALR121)
LFS9162 MELSEC-A Communication Package (for
ALR111,ALR121)
For details, see the respective GS's.

NTPS100 Exaplog EventAnalysis Package


NTPS200 Exapilot Operation Efficiency
Improvement Package
As for details of each function above, refer to GS
36J06A10-01E "NTPS100 Exaplog Event Analysis
Package" and GS 36J06B20-01 E "NTPS200 Exapilot
Operation Efficiency Improvement Package".

Sequence of Events Manager Software


LPC6900 SOE Server Package
LPC6910 SOE Server Configurator Package
LPC6920 SOE Viewer Package
LPC6930 SEM OPC Interface Package
For details, see publication GS 33L30D1 0-40E "SEM
Sequence of Events Manager (for FlO and VnetlIP)".

VTSPortal Software

11

Index

LPC7800 VTSPortal Basic Pack


LPC7801 VTSPortal Multiple Client Builder License
As for details, refer to GS 33Q02N81-31E "VTSPortal
Basic Pack, VTSPortal Multiple Client Builder License".

Documents
LHS5495 Electronic Document
As for details, GS 33M01W10-40E "Electronic
Instruction Manual".

Plant Resource Management


SSS7700 Plant Resource Management Server
SSS7710 Plant Resource Management Client
SSS7720 Field Communications Server
As for details, refer to GS 33Y05Q10-31E "Plant
Resource Manager".

All Rights Reserved. Copyright 2008, Yokogawa Electric Corporation

Safety Instrumented System


CHS5100 Safety System Generation and
Maintenance Package
CFS1100 Safety Control Functions Package
As for details, refer to GS 32S51 81 0-01 E "ProSafe-RS
Safety Instrumented System Overview (for Vnetll P)".
I11III

INSTALLATION AND
ENVIRONMENTAL CONDITIONS

The installation and environmental conditions for


Yokogawa's devices, except for general-purpose PCs,
General-Purpose Network Device, console HIS's, node
units for FlO and I/O modules, are shown below. For
a general-purpose PC and General-Purpose Network
Device, see their specifications. For an enclosed
display style console HIS, an open display style
console HIS, a node unit for FlO, or an I/O module, see
the general speCifications for each device (publications
GS 33M50B40-40E, GS 33M50B50-40E or GS
33M50F10-40E).
Ambient Temperature:
5 to 40 C (yAX101)
5 to 35C (YAX801, YAX211)
to 50 C (FCS)
Ambient Humidity:
20 to 80 %RH
10 to 90 %RH (FCS)
Non-condensation
Temperature Change Rate:
10C per hour
Power Requirements:
100 to 120 V AC 10%, 50 or 60 Hz
3 Hz
220 to 240 V AC, 50 or 60 Hz 3 Hz
24 VDC 10%
Withstanding Voltage:
1500 V AC for 1 minute (for 100-120 and
220-240 V AC model)
500 V AC for 1 minute (for 24 V DC
model)
Insulation Resistance:
20 MO at 500 V DC
10 MO at 500 V DC (yAX101, YAX801,
YAX211)
Grounding:
Independent ground of up to 100 0
Noise:
Electric Field: Up to 3 VIm (26 MHz to 1 GHz)
Magnetic Field: Up to 30 AIm (AC), up to 400 AIm
(DC)
Static:
Up to 4 kV (direct discharge), up to 8 kV
(aerial discharge)
Continuous Vibration:
Displacement amplitude: Up to 0.25 mm
(1 to 14 Hz)
Acceleration: Up to 2 m/s2 (14 to 100 Hz)

GS 33L01A10-40E Feb. 4, 2008-00

Contents

12

Index

II CENTUM VP Entry Class


The CENTUM VP Entry Class is available for small-scale systems .

Components and Software


The CENTUM VP Entry Class uses specific Entry Class packages such as built-in HIS packages. There is no
restriction on FCS models.

Operation and Monitoring Software


The following software packages are provided for the Entry Class. Except for the packages listed below, current
CENTUM VP system operation and monitoring software packages can be used. But, the LHS4000 Million Tag
Handling Package cannot be used in an HIS with the built-in LHM1101 Standard Operation and Monitoring Function.

Operation and Monitoring Software


Entry Class Model
LHM1101
LHM1150
LHM4410
LHM4420

Product
Standard Operation and MonitOring Function
Server for Remote Operation and Monitoring Function
Control Drawing Status Display Package
Logic Chart Status Display Package
CS Batch 3000 Process Management Package

LHM6600
LHM6710

FCS Data Setting/Acquisition Package (PiCOn

Remarks
Number of operation and monitoring tags: up to 8000

Maximum number of active recipes:


Type A: 4
TypeB: 10
Type C: 999

Engineering Software
Entry Class Model
LHM5100
LHM5150
LHM5490

Product
Standard Builder Function
Test Function
Self-documentation Package

Remarks

All Rights Reserved. Copyright 2008, Yokogawa Electric Corporation

GS 33L01A10-40E Feb. 4, 2008-00

Contents

13

~Index~

II REGULATORY COMPLIANCE

*5:

The standards to which CENTUM VP hardware devices


conform are listed below. See the applicable general
specifications to ensure each device's compliance.

*6:

Safety Standards ("1)

[CSA]
CSA C22.2 No. 61010-1-04 (for 100 to 120 V AC
and 24 V DC power supply)
ICE Mark] Low Voltage Directive
EN 61010-1 (for 220-240 V AC and 24 V DC power
supply) (*8)
EMC Conformity Standards (*1)
ICE Mark] EMC Directive
EN 55011 Group 1 Class A (for 220-240 V AC and
24 V DC power supply) (*9)
EN 61000-6-2 (for 220-240 V AC and 24 V DC
power supply) (*2)
EN 61000-3-2 (for 220-240 V AC power supply) (*3)
EN 61000-3-3 (for 220-240 V AC power supply) (*4)
[C-Tick Mark]
AS/NZS CISPR 11 (for 220-240 V AC and 24 V DC
power supply)
Standards for Hazardous Location Equipment
[CSA Non-Incendive] (*5)
Class I, Division 2, Groups A, S, C and D
Temperature code T4
CSA Standard C22.2 No. 157-92
CSA Standard C22.2 No. 213-M1987
ISA Standard ISA-S12.12 1994
(for 100-120 VAC and 24 V DC power supply)
[FM Non-Incendive] (*6)
Class I, Division 2, Groups A, S, C and D
Temperature code T4
FM Class Number 3600: 1998
FM Class Number 3611: 2004
FM Class Number 3810: 2005
(for 100-120 V AC, 220-240 V AC and 24 V DC
power supply)
[Type n] (*7)
EN 60079-15: 2003
IEC 60079-0: 1998
IEC 60079-11: 1999
(for 24 VDC power supply)
[Intrinsic Safety]
EN 50014 1997 +A1 +A2
EN 50020 1994
EN 50021 1999
*1: To conform to safety standards and EMC
conformity standards, install 19-inch rackmounted devices in a keyed metallic cabinet.
*2: A lightning arrestor or the like is required to meet
this surge immunity standard.
*3: An external device such as a power unit with
harmonic current neutralizer and an active
harmonics conditioner must be connected to meet
this harmonic current emission standard.
*4:
The specified limits of voltage drops across wiring
must be satisfied to meetthis standard.

All Rights Reserved. Copyright 2008, Yokogawa Electric Corporation


Subject to change without nolice.
.

*7:

*8:

*9:

To meet the standard for hazardous location


equipment, 19-inch rack-mounted devices must
be installed in a keyed metallic cabinet approved
by CSA or non-incendive regulator in your area.
To meet the standard for hazardous location
equipment, 19-inch rack-mounted devices must
be installed in a keyed metallic cabinet approved
by FM or non-Incendive regulator in your area.
To be compatible with Type n, the specification
requirements of EN 61010 and EN 60079-15
must be met, and a keyed metallic cabinet, whose
degree of protection is IP 54 or above, prescribed
by IEC 60529 must be used for housing.
The analog input side of this equipment is
measurement category 1.
For details, see CENTUM VP Installation
Guidance (T133Q01J10-01E).
A Class A hardware device is designed for use in
the industrial environment.
Please use this device in the industrial
environment only.

Note: According to the New Approach Directive, the


manufacturer and the representative office in EU
are indicated below:
Manufacturer: YOKOGAWA Electric Corporation
(2-9-32 Nakacho, Musashino-shi, Tokyo 1808750, Japan).
Representative office In EU Community:
Yokogawa Europe B.V. (Databankweg 20, 3821
ALAmesfoort, The Netherlands).

II TRADEMARKS
CENTUM, VnetllP, DARWIN, DAQSTATION ProSafe
and Exaopc are registered trademarks ofYokogawa
Electric Corporation.
Exaplog and Exapilot are trademarks ofYokogawa
Electric Corporation.
Windows is a registered trademark of Microsoft
Corporation in the United States and/or other
countries.
Ethernet is a registered trademark of XEROX
Corporation.
Modbus is a registered trademark of Schneider
Electric and/or such related companies.
PLC, PLC-5 and SLC500 are trademarks or
registered trademarks of Rockwell Automation, Inc.
MELSEC and MELSEC~A are registered trademarks
of Mitsubishi Electric Corporation.
. SYSMAC is a registered trademark of Omron
Corporation.
"FOUNDATION" of "FOUNDATION fieldbus" is a registered
trademark of Fieldbus Foundation.
Other product and company names appearing in this
document are trademarks or registered trademarks of
their respective holders.

GS 33L01A10-40E Feb. 4, 2008-00

yyy

>-

this document is for Damitta project


AAAA

.A..A.

Des System - Al Shabab Power Plant

Rev.O

YOKOGAWA+

YOKOGAWA VnetJlP PCllnterface Card

~--)

YOKOGAWA VneVIP PCllnterface Card

YOKOGAWA VnetJlP PCllnterface Card

YOKOGAWA Vnetnp PCllnterface Card

all screens to be 22" as per DeS architecture


and contract spec.
GOOl-OODDi item 5.17.4

1/8

GIZR
SYSTEMS

YOKOGAWA+

CNTUM~

-----wt!lrll"'WiJle

EAST DELTA ELECTRICITY PRODUCTION COMPANY (EDEPC)


ALSHABAB - 1000 MW SIMPLE CYCLE GAS TURBINE UNITS
Ref.: IA-HT-C-AI-I6-987-IO
Rev. 0

Field Control Unit (FCU)


Dual Redundant CPU with VneYIP 1000 Mbps, 19" rack-mounted
Dual Redundant Power Supply, 220 - 240 VAC
32 MB Main Memory
133 MHz Processor Speed

Node Unit for Dual Redundant ESB Bus, 19" rack-mounted type
Dual Redundant Power Supply, 220 - 240 VAC
Dual Redundant ER Bus Communication, 128 Mbps

-)

2.1.3 Redundant ESB Bus Interface


EB401
ESB Bus Coupler Module
2.1.4

Modules
Ethernet Communication Module, Modbusnp

2.1.5

2.1.6

AI Module, 16-Channel, isolated, 4 .,. 20 mA

10

01 Module, 32-Channel, 24VDC

15

DO Module, 32-Channel, 24VDC

Termination & Cabling

lot

2.2.1
Field Control Unit (FCU)
Dual Redundant CPU with VneYIP 1000 Mbps. 19" rack-mounted
Dual Redundant Power Supply, 220 - 240 VAC
32 MB Main Memory
133 MHz Processor Speed

2.2.2
Node UnH for Dual Redundant ESB Bus, 19" rack-mounted type
Dual Redundant Power Supply, 220 - 240 VAC
Dual Redundant ER Bus Communication, 128 Mbps

3/B

YOKOGAWA+

GIZR
SYSTEMS

CNTUM~

_lnll.'\lTai:.'

EAST DELTA ELECTRICITY PRODUCTION COMPANY (EDEPC)


ALSHABAB - 1000 MW SIMPLE CYCLE GAS TURBINE UNITS
Ref.: IA-HT-C-AI-I6-987-IO
Rev. 0

Ethernet Communication Module, ModbusllP


Including 25% spare
AI Module, 16-Channel, Isolated, 4 _. _ 20 mA

01 Module, 32-Channel, 24VDC


DO Module, 32-Channel, 24VDC

10
15
2

Termination & Cabling


Lot

--)
Field Control Unit (FCU)
Dual Redundant CPU with VnetllP 1000 Mbps, 19" rack-mounted
Dual Redundant Power Supply, 220 - 240 VAC
32 MB Main Memory
133 MHz Processor Speed

Node Unit for Dual Redundant ESB Bus, 19" rack-mounted type

Dual Redundant Power Supply, 220 - 240 VAC


Dual Redundant ER Bus Communication, 128 Mbps
ESB Bus Interface
ESB Bus Coupler Module

Modules
Ethernet Communication Module, ModbusllP
Including 25% spare
AI Module, 16-Channel, Isolated, 4 ... 20 mA

01 Module, 32-Channel, 24VDC

DO Module, 32-Channel, 24VDC

10
15
2

Termination & Cabling


cables, termination and Internal panel wiring are Included

418

Lot

GIZR
SYSTEMS

YOKOGAWA+

CNTUMlJI"p

-welflI.l.WW!

EAST DELTA ELECTRICITY PRODUCTION COMPANY (EDEPC)


ALSHABAB - 1000 MW SIMPLE CYCLE GAS TURBINE UNITS
Ref.: IA-HT-C-AI-I 6-987-/0
Rev. 0

Field Control Unit (FCU)


Dual Redundant CPU With VneUIP 1000 Mbps, 19" rack-mounted
Dual Redundant Power Supply. 220 - 241) VAC
32 M8 Main Memory
133 MHz Processor Speed

Node Unit for Dual Redundant ESB Bus, 19" rack-mounted type

Dual Redundant Power Supply. 220 - 240 VAC


Dual Redundant ER Bus Communication, 128 Mbps
Bus Interface
ESB Bus Coupler Module

Ethernet Communication Module, Modbus/lP

AI Module, 16-Channel, isolated, 4 '" 20 mA

10

01 Module, 32-Channel, 24VDC

15

DO Module, 32-Channel, 24VDC

Termination & Cabling


cables, termination and internal panel Wiring are included

Lot

Field Control Unit (FCU)


Dual Redundant CPU With VneVIP 1000 Mbps, 19" rack-mounted
Dual Redundant Power Supply, 220 - 240 VAC
32 MB Main Memory
133 MHz Processor Speed

Node Unit for Dual Redundant ESB 8us. 19" rack-mounted type
Dual Redundant Power Supply, 220 - 240 VAC
Dual Redundant ER Bus Communication, 128 Mbps

5/8

GIZR
SYSTEMS

YOKOGAWA+

CENTUM"'ilI"p

~1"lWale

EAST DELTA ELECTRICITY PRODUCTION COMPANY (EDEPC)


ALSHABAB - 1000 MW SIMPLE CYCLE GAS TURBINE UNITS
Ref.: IA-HT-C-AI-J6-987-JO
Rev. 0

ESB Bus Coupler Module

Modules
Ethernet Communication Module, Modbus/lP

AI Module, 16Channel, isolated, 4 20 rnA

24VOC
DO Module, 32-Channel, 24VOC

01 Module, 32-Channel,

12
11
2

TermlnaUon & Cabling


Lot

Project 10 License
Software Media for HIS Including Electronic Instruction Manual
Statlon)
Standard Builder Function
Graphic Builder
Self Documentation Package
Test Function
Electronic Instruction Manual
Standard Operation and Monitoring Function

6/8

YOKOGAWA+

GIZR
SYSTEMS

C-ENTUM1!/jt:a

_ln~iIW

EAST DELTA ELECTRICITY PRODUCTION COMPANY (EDEPC)


ALSHABAB - 1000 MW SIMPLE CYCLE GAS TURBINE UNITS
Ref.: IA-HT-C-AI-J6-987-JO
Rev. 0

Bill O(Material (BOM)


Description

pos.\

3.3

3.4

LHS1100

Standard Operation and Monitoring Function (New Installation)

LHS2411

Exaopc OPC Interface Package (For HIS)

LHS6510

Long Term Data Archive Package

2
2
2

LHS6530

Report Package

LBC2100

System Integration OPC Client Package

LHS4600

Multiple Monitor Support Package

Application Capadty Expansion Package for AFV100

Licenses for Controllers


LFS1530

3.5

Licenses for Communications


LFS2453

3.6

\ Qty.

Licenses for HIS (Operation and Operation Monitoring Stations)

MOOBUS Communication Package for ALE111

Licenses for Plant Resource Manager (PRM) (Optionl


SSSSM02

Software Media for Plant Resource Manager

SSSSD02

Electronic Instruction Manual Media for Plant Resource Manager

SSS7700

Plant Resource Manager Server for 1000 devices

SSS7710

Plant Resource Manager Client

SSS7720

Fiefd Communications Server

DELL or HP

PC Based Station for Plant Resource Manager

1
1

NJl\
4.1

DCS System Cabinet

Dimensions: 800x800x2000 mm (DxWxH), Electrostatic painted, IP54, Lighting,


Earthing Connection and system cables, Completely wired with all necessary,
breakers, fans, filters and terminals
4.2

DCS Marshalling Cabinet

Dimensions: 800x800x2000 mm (DxWxH), Electrostatic painted, IP54, Lighting,


Earthing Connection and system cables, Com pletely wired with all necessary, power supply
breakers, fans, filters and terminals
4.3

Power Distribution Cabinet

Electrostatic painted, IP54, Lighting, Earthing Connection and system cables,


Completely wired with all necessary, breakers, fans, fiRers and terminals

7/8

YOKOGAWA+

GIZR
SYSTEMS

CNTUM~

------we Inlk",a1J;!
EAST DELTA ELECTRICITY PRODUCTION COMPANY (EDEPC)
ALSHABAB - 1000 MW SIMPLE CYCLE GAS TURBINE UNITS
Ref.: IA-HT-C-AI-16-987-JO
Rev. 0

Communications and Interconnectivity Design

Display DralNings for up to 100 Graphic Pages

Dig~al

Output Module, 32-Channel, 24VDC With Status Display


Ethernet Communication Module, ModbusllP
VneVIP PCllnterface Card

8/6

2
1

all comments shall be reflected in the DeS system architecture


submitted by KN "10067-9-V01-JQ07-00001"

...

connect the two switches for reduncancy

<}r,ES("~ COIllE.~

1 screen for the large screen PC


as per the BOM"bill of material"

<}JESCCCO~8

dual screen as per 80M

'--'

CTG
GE MarkVle - 1

Co""" Room

III

GPSMuI'trCktct.

Subslailon
Oisl. TX 20QOKVA
LV Load Center~2
LV Package
Substation
Olesel Generators
Fire Pump Stalion
Unloading Fuel
Pump
SoJarOil Tanks
Solar Fuel

Treatment Plant
Serviee/lnslrul'TM

shall Interface with:


CEMS-instrument Air-Service Air-fan coolers

two independent power supplies (UPS+ uninterrupted


J007-00COl item 2.4.2.1

The plant's alert approach fa operalions, maintenance, and information is obvious. Operators are calm and
in conlrol. Managers are well informed, but never overwhelmed with data. All facilities are under control,
ready ta unleash their full polenlial for occasional peak load. Al the same time, palenlial problems are
anticipated before Ihey happen. Aillhis in lhe life of D vigilant operation.

Plant
Expansion
With today's power plants remaining ", operation f'" sav91al decades, there comes a time wilen instrumentation
and .;ontrol systems must be renewed to mai,n\ain a
competiUvfl (~dge.

Th~l

conlrol room is ql.liHt, with arrays ()f compuiet


semens dit;playing Iml1ds and Jllessag(~s on the walls
and operating desks. Gone are ttlH chart recorders.
plinters, metors and push bu~ons of yesterdr.,y. Oporat ..
ing staff remain calm. monitOring operations, prepaling
the plant ior routine tesling and maintenance.

Oll,er operating staff take time out from the control room
jor refresher training on the plant's lui! replica tmining
siln~ator. Here. the atmosphere is not quite as calm as
operating staff get put tl1fough their paces responding to
emergency conditions. and undergo training for less
Willmon tasks such as plant startup.
Being trained tOT a wide vHriety of emergencies: the
operatcl's are ready to handle unexpected events with
confidence, Unscl1edu!ed shutHdowns are minimized
and rapid recoveries from unforeseen incidents are

assured,

At th() start of a repianemHnl project. Yok.ogawH':~ experienced engineering !earn c(uries nu! a piant and control
system audit. The GUstainab!e and I!eKible archi!octure of
Yokogawa's control system means that only the obsolete
control units need to be changed over, allowing existing
equipment 10 be retained to the maximum extent, Strate"
gles for increasing plant safety. avoiding project cost overruns, and increasing plan! availabifrty are put into place.

\Ntlile the design and fabrication proceed, (,.'1Ul(~r proce$s


applicatIon speclalist8 mviHw ttv.) plant control stra!egies
nnd incorporate new centrel concepts. This is thoroughly
tested by simulation, almost always with a full replica
sin"l:ulator. Tesling proceeds separiitely from thl~ manumcltlre of contlol equipment, providing low risk engineering processes lor projects will, short outage times.

Once !he plant outage begins, existing control equipment


is quickly removed. without disturbing existing cabinets
and caDle The new factory-assembled and lested control
equipment i.~ in.<;talled, and connections made !o p.)(iSling
l()mlinafs and (:ablt}S, Comrnlss'!orilng and te&1ing of the
r"eN oorr!roi (-)quiprner'rt cmnrr)(.)f)C(-I.s alrnO&1 frnrnediaJ(~Iy.
As the outHge concludes, opemtlng staff "run uP" the

plan! viilh ti1e confidence that comes from having under


gone extensive training on ~,e plant simulator.
With tile rew oonirol system, tilE! pewer plant Is set for many
more years of safe, rellable and compelitive operation.

T a casual bservar, this calm &. effident settil'l~ m<l'Y seem rl,';!ttaer
b()ring. ilut thi5 is the W'lll'f C! pillnt should run allowing 'Iou to See Cie<:!Ir!~ Know in Advance, and
Ad with Agiliiy. It should run like a VigikmfP!ant.

vigilant'i'Jj:i!'C~~'~ft'
.;
i1F)"'~'

>

~ '

Improving visibility of aU plant information


vvith single unified architecture

Key Enablers:
Single architecture covering the entire plant
- CENTUM VP total power plant control system for turbine, boiler anc! balance of plant (BOP) controls
- TOV SIL3 certified ProSafe-RS integrated salety controller tor the burner management system (BMS) and
protection system
- FOUNDATIONT.. fieldbus anc! HART interface for field instruments. analyzers, and valve positioners
- PROFIBUS interface for electrical equipment and molor valves

- lEe 60870-5 interface for substation equipment

High availability
- Field-proven controller with seven 95 (99.99999%) availability in unique pair-and-spare redundant
architecture
- Pair 8. spare fail-safe architecture is also available for the ProSafe-RS safety controller

long term stability


- =0.04% accuracy "f the DPharp EJX digital transmillar even in the most critical applications (drum level. ett~)

- ",0.1% of upper range limit (URl) for 10 years with EJAJEJX tr..msmitlars
ErrOl (%@rnax.span)

o.tO~.

The effectiveness and efficiency of power plant operations depend on Ihe availability of key performance
information about the plant and the process. Yokogowa delivers a single-architecture monitoring and control
syst&m thot integrales information from all facets 01 a pOW<lr plant and keeps th .. planl personnel well
informed. The industry-leading availability, reliabilify, and long-term stability af the YOKogawa automation
plaffo.m. ens".... an operating environment where your people can have 20,20 vision of your entire
operation.

51

i~~J
1

fHFFP
. :L:j

"0

11

12

13

14

'16

\'c'ler

1
6

()ptinlizing operation & maintenance for


unprecedented plant managernent efficiency

Key Enablers:

- Intelligent alarm management aulomalically displ(~ys alarms requiring oporalor aUrmtion, intllrrni"~)
operators whether alarm pOints are improving while suppressing irrelevant alarm messages.
- Exapfog event analysis package analyzes the frequency of alarms and operator actions. visualizing
stalisti~,aI data and helping to find Ihe rool causes of alarm occurrence and areas for improvement.
- Event sequence analysis with builtin Sequence of Events Manager (SEM) allows 1mseo time resolution
and 1rnsec accurate lime synchronization system across all controllers.

- Integrated asset management with P RM Plant Resource Manager enables effective maintenance of plant
assets in a single unified database system across different protocols and multiple suppliers.

- Full-replica simulator performs highly accurate modeling of actual plant behavior under any scenario for
optimized operation and control.
- Performance calculation is fully integrated with tile Yokogawa DeS and uses predefined formulae to monitor
and optimize pelformance.

Once into commercial operation, competitive po .... r planfs pursue operational excellence by continually
improving effidency and 'preventing/minimizing abnormal situafions. Yokogawa enables optimization
solution.lhal empower plant personnel under bolh normal and abnormal conclilions. Knowledge-based tools

and consulling .eNices enable continual productivity improvement, advanced alarm management, and
integrated plant asset management. No longer just reacting to problems, your people and your <ISseis are
focused on meelingtomorro'N'. challenges.

- Long-term data archiving and date transformation with F..xaquanium ensures enhanced, seamlElsa
Information flow within Mel between plant systems !Ina business applications.

ing agility of business vvith plant


rvices throughout the plant life eyel

Key Enablers:

- Our philosophy of continuous evolution, demonstrated over a 30 year period with CENTUM, ensures a
smooth migration path and keeps your investment for f&C refurbishment

to a minimum.

Efficient piant commissioning with plant simulator


- OHfine commissioning on II high-fidelity simulator allows !horough validation of the DCS c!)I1l1guration
before the software is loaded at the actual plant. keeping to a minimum the final tuning that must be done
during plant commiSSioning,

- Certified professional trainers deliver competency-based training using a plant simulator to create training
scenarios that flexibly replicate normal, abnormal, and emergency operating conditions.

- 2417/365 remote monitoring combined with real-time diagnostic tools and services ensures system
maintenance can be condillon-based. not time-ba~ed, reducing maintenance spending.

- Automated operation procedures created with Exapilot enable the know-how of experienced operators to

Our;ng the relatively long life cycle of a power plant, the .... comeS a time when Ihe instrumentation and
control systems must be r.. n ..wedle maintain a <o~peli!ive edge. Yokogawa supports power plants with
"'pert servi"". that maximize efficiency and minimize (osl over the entire life cycle, From initial design,

,on$lwel;on, and daily operation 10 revamp and reinstrumentation, Yokogawa stands by your power plant.
This long-term partnership ensures hottl.meek-free performance and ongoing optimization Ihat bring speed
and flexibility fo your business,

be shared with less experienced staff.


- Documentation of standard procedures for operation, maintenance, training, cc>mmissioning, audit, and
reporting.

- Plant-wide audits examine human resources, fuel, asset management, environment, production, plant
operation, and information systems, identifying opportunities for improvement and cost reduction.

',,-,
4'

In

Field

wer ;ndus-~w

in:s~ruments

- Pressure. temperature. flow. and level measurement


- Valve positioners and converters

Contro~

Analytical h1struments

Meters and Test Instrurnents


Analog/digital meters, clamp-on power meters, power monitors.
insulation testers. handy calibrate.rs

Safety Management Systems

Plant Optimization SoftW<0H'(t

- TUV SIL3 certified integrated safety systems for burner management and
emergency shutdown

- Performance analYSis. operntional elficiency improvement, and alarm managemem


- Asset management

Unit Control Systems

Power Ph,mt Services

- Distributed control systems

- Commissioning. operator training, operation, maintenance,

- SCADA and network-based control systems

Data Acquisition ;::md

- Paperless videographic recorders


- PC-based and stand-alone data acquisition equipmenl
Single loop and highly scalable programmable logic controllers

- liquid analysis (pH/ORP, conductivity. dissolved oxygen)


- Gas analysis (NOx, SO" CO. CO" 0,. hydrogen purity)

',,--,

and simulation services

1,2

application ex

rience in the

Fossil fuel fired


power plants
CosVoiVgas fired
- Combined cycle
- Simple cycle .

- COiJooeraffon
.' Industrial boilers

CFB boiier plant

"'-..'

~"

control

All types of plant information including process data, alarms, events


and sequence of events (SOE) are handled by plant information
management, enabling the analysis of plant operational performance.

1:1:
-1'::1."

J:!:~I

Plant resource
management
Plant resource management inlegrates and manages
maintenance information from field instruments and monitors
online conditions .

.~

The ProSafe-RS SCS Is a TOV SIL3 certified


safety system that incorporates Yokogawa's
own pair-and-spare technology.

Turbomachinery

!~
'.- .~t~~'l: --. i
""

,I

F(1f)

'.

.}

."'~;t

TVT

FU1-i

::t"f't ~., <!.


S~/~"'iih
15

t,(>,d )'~;n:.I

'I'

?t

f,

"

l " i i."

~~L

-"'ij
~'\;O;!\

p..,fl{j

Typical coal fired power plant

W!illt'~Wlll'1\,

- Boiler control
- Burner management
- Turbomachinery control
- Balance of plant (BOP)
Cosl handling
Waler treatment
Ash handling
Flue gas desulphurlzation (FGD), etc,

lit;

Services

c".;;

'7~~'~

.":"

r a Ii fime of plant e

'~i.{;;

.,~,.,.,.

u~~;n#;$6~/;~~i~~~R;~ftn
TS'.6aV<lrba~tar..I1~;ld .Ofthe1tIlTh~~rnal;~o,WeV~lal1t.

~~~iq; i~bell~og; Wl1at~'bea~tiful thlnil~~~sP~9Plesw.I~ .......... ' ... .....unul

'.1 seeltJemat wqrk;WtlQnw<l ~xpiJrierJciedth!> pl~rit trip,lIeam';dwh~ ~axe(! "

Yokogaw'" d~f<1rorrl from (iiilaro.l.arbiliretl\eir siriCl;rily an~.&!VOliO"lowrll\l

4 x 420 tihr, cool fired, p,.n"U."m.!l,ng

A mom stabfe and robust power supply


The feinstrumented boilers realized both higher stability and
increased throughput, assurin!J a stafJle energy supply.

Reduction of malfunctions and accidents


Since the renovatIon, equipment malfunctions have dropped
dramatically, eliminating costly plant downtimes.

Yokogawa Vigilance at your service worldwide representative projed's


w

u.s
Italy
400MW

Peru
65(1MW

combined cycle

Australia
4xSOOMW

IWPP

cool firl!d revampmg

Fossil fired power plants

Iii Gas turbine power plants

o Renewable energy power plants


4ft Plant services and/or plant simulators
~

'" *1 an t I)lant
lli
.
Vlg.
i!1

f$

The clear path to operational excellence


YOKOGAWA ELECmlC CORPORATION
World Headquarters
9-32, Nakacho 2-chome, Musashino-shi, Tokyo 180-8750, Japan
htlp:llwww.yokogawa.coml

Yokogawa seJVkeoffices

VigilantPlant is YokogaW<l's automation concept for safe, reliable, and profitable


plant operatians. YigilantPlant aims to enable on ongoing state of Operational
Excellence where plant personnel are watchful and aflentive, well-informed,
and ready to take adions that optimize plant and business performance.

1--------------------------------------f

Represented by:

YOKOGAWA CORPORATION OF AMERICA


2 Dart Road, Newnan, Georgia 30265, USA
htlp:/lwww.yokogawa.com/usl

YOKOGAWA EUROPE B.V.


Databankweg 20, 3821 ALAmersfoort, The Netherlands
htlp:/lwww.yokogawa.com/eul
YOKOGAWA ENGINEERING ASIA PTE. LTD.
5 Bedok South Road, Singapore 469270, Singapore
htlp:/Iwww.yokogawa.com/sgl
YOKOGAWA CHINA CO., LTD.
3F Tower D Cartelo Crocodile Building
No.56S West Tianshan Road Changning District, Shanghai, China

f
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ______ 1

URL:www.yokogawa.com/pwr

htlp:llwww.yokogawa.com/cnl

YOKOGAWA MIDDLE EAST B,S.C.(c)


P.O. Box 10070, Manama
Building 577, Road 2516, Busaiteen 225, Muharraq, Bahrain
http://www.yokogawacomlbh/
Trademarks
CENTUM, VneVIP, vigilance and vigilantplant are either trademarks or registered trademarks of Yokogawa Electric Corporation.
All other company brand or product names in this bulletin are trademarks or registered trademarks of their respective holders.

'----'

'.--

ver 300 projects awarded in 7 years


Bulgaria

Romania

I"

8 x 200 t/h
4 x 330 MW
ongo la
f;" t"
fl
d
If;" t"
8 x 420 t/hf coal fired
fI ue gas desu II unza Ion ue gas esu I unza Ion revamQing & simulator

Ita Iy

\ \:

.... ____ ~_

K
orea. .

800 MW supercntlcal
traini

.I"""'i""'''~'i''iPicYV~UD.FS:!i'j:''!j:'''\;'':h'ii:h,i\~,},u...,w.

400MW

Taiwarr
2x 550 MW
coal fired
0/

Vietnam
2 x 300 MW, coal fired
simulator & t .."ininn

India
3 x 660 MW
coal fired

U.

480 MW

(since 2001)

1~~~1~~~~~~~~~j!

---:~.Ij

'.-.../

~:

... ' . 'c; ":;:.~'. :;'~ :0;":-':" ';i'~'f'T;';::;:r:)';;::Ti~'~':i/ <;:"::;(:';:~:";":~ ~:y ;~:'.

}: ..BcaresUNest>R6mania .';:

...,. '. .. ...".' .A.. ,, . ,. .. ..... " ....,.

n,ISQMWtG(;:PP,.(3E.GT&ST"tJQr
:..-,0':>,' .f"{~; >/g;;', :()~::< :)y;;~T>: ","~l";'(i"/:': !\:'i:~: :'~'~<:<')

ji...

.~):!S~Oi~.It>~$~~;Ia~~~ys'::,.~~'

130MW,',CCRPtGt;Gy; UO:nfCS3QOO
:~\:.\i~' ,:~. i:, :;. ,~.',:~'.(::I\, ':.: >.]~1~;;:;;I>A:j1;:,~::i!~;::;: ~):/<.~::~.';::t::~:; >:i

.Kahram(rIWP~
'39~M\lVi~iw~pr.

';.NlJbarjaCCPPt.JEgypf.~.

. 75'O~W>;C;9"P~~;G~i . C,$~9qO.
. i.Sidi ~drGGPP;E9YPt:\ii

i,?~OMWi.CCPP}MHlt,.C$3QQ();
: . ' .. '
p:', .. , ......
:~J'"

"w;', ,"', .'~. " .:"

.:,'

i":'. '':I;I.l\tfiGCpe.t;gypt:;.;',.
. . . :,.7S0MW,/CCPp
/' MHI/C:S3000
:.
.::.',:'" :.'
., .... ,:,: ...: ," .. ,..
. - '., :::
'"

:.'

".~,.

:'NIPPSapei~:pp;Nig~Ha'
"4S0MW~ ~:GE9E;

CS30pq

; . .NIPPth~vbOr;~p/Ni~ri~'
. . .150Mvv, c;rt;9E,J:S3QQO
"iNIPPCaiaQ~~',g~;Nig~ria'

560MW,GT:GE9E,Cs3000'

A Yokogawa Commitment to Industry

vigilance:

Location:
Order Date:
Completion:
Industry:

Bilbao, Spain
2001 (BBE & BBG)
2003 (BBE & BBG)
Power and LNG

) Background of the Proiect


In Spain, the demand for electricity and imported natural gas has been rapidly increasing, a trend that is
anticipated to continue for years to come. To augment the country's energy supply, several new LNG
regasfication plants as well as combined cycle gas turbine plants have been constructed in Spain.

About the Bahia de Bizkaia Plant - BBE and BBG


To achieve a stable supply of gas and electricity for the country, the Spanish government decided to build the
Bahia de Bizkaia Plant. located in Bilbao, this plant consists of Bahia de Bizkaia Electricidad (BBE), an 800
MW gas fired combined cycle power station, and Bahia de Bizkaia Gas (BBG), a regasification facility with
regasificators having a total capacity of 2.7 billion cubic meters.
The Bahia de Bizkaia Plant is one of the most significant power projects to be carried out in this region. The
proiect has been led and financed by Ente Vasco de la Energia, Repsol-YPF, British Petroleum, and Iberdrole
S.A., with the total investment coming to approximately 600 million euros.

)
. The Challenges and Results
{1} High availability (BBE and BBG)
Both facilities aim to have high availability. The field-proven CENTUM CS 3000 distributed control system (DCS)
ensures this by enabling the control and monitoring of the entire BBE power station. The BBG regasification facility is designed to operate 24 hours a day, 365 days a year without having to be shut down for maintenance.
Yokogawa's highly reliable CENTUM CS 3000 DCS offers a high degree of redundancy that contributes to the
entire plant's high availability.

(2) Unified operation of multivender control systems (BBE)


At the BBE power station, General Electric Company gas and steam turbines have been installed and are
controlled by the company's own turbine control system. The electrical equipment of the power station is con-

A Yokogawa Commitment to Industry

vigilance:
trolled by another venderls system. With its Unified Operator Interface (UOI)I Yokogawa/s CENTUM CS 3000
enables the seamless operation of each of these control systems. With the UOI solution l all of the actions required for the operation l management, and maintenance of turbinesl the heat recovery steam generator (HRSG)I
and the balance of plant and electrical controls can be carried out from a single operator interface. The UOI also
eliminates the requirement for operators to master the operation of multiple systems.

(3) Flexible operation and reduced start-up time (BBE)


The BBE power station is capable of working both at base load and at partial loads, which provides flexibility
in the plant operation. In addition l to reduce the start-up time, 100-percent-f1ow by-passes were designed to start
the gas turbine and the HRSG individually without starting up the steam turbine. The Yokogawa DCS for which
the Spanish engineering company Siemsa Notre S.A. (SIEMSA) fully implemented the above operation logic has
. steadfastly supported the safe plant operation and smooth startup.

)
Customer Satisfaction
The SIEMSA engineer commented, IIWe appreciate CENTUM CS 3000's operationality and system reliability.
With the UOI solution l the DCS controls use the same HMI system as the turbine and electrical control system,
and there is no need for a dedicated communication gateway and separate screens. This significantly reduces
I
the engineering time and costs. '

System:

CENTUM CS 3000/UOI (BBE)


CENTUM CS 3000 (BBG)

System configuration: 4 x operator stations


(BBE)
1 x engineering workstation
2 x UOI (Cimplicity) servers
)
4 x field control stations
2,600 inputs/outputs
1,800 Communication Signals
System configuration: 1 x Engineering Stations
(BBG)
6 x Operator Stations
4 x Control Stations
1,500 Inputs/outputs
2,500 Communication Signals
1 x OPC Server

vigilance:

Location:
Order Date:
Completion:
Industry:

New South Wales, Australia


2003
August 2004-2005
Power

.) Executive Summary
1. Faster commissioning
The control system replacement for the four units is continuing. The first two units have been successfully
completed ahead of schedule, providing the customer with financial benefits.
2. Efficient operation ensuring high reliability
The renovated units give very stable and efficient operation, allowing the customer to make everyday load
changes at a faster rate than with the previous control system.
3. Improved system maintainability
The integrated device management system enables real-time, remote maintenance of multivender field devices
via the control system, helping the users to minimize routine maintenance work.
Background
Eraring Power Station, located just north of Sydney, is one of the largest power stations in Australia,
comprising four 660MW coal-fired units.
) The power station has operated reliably since 1981. To ensure continued reliability for the next few
decades, Eraring Energy, the owner of the power plant, decided to replace the original hard-wired control
equipment with a modern integrated control and monitoring system (ICMS). Significant project drivers were
the requirements to maintain plant reliability and to gain operational improvements in order to ensure the
competitiveness in the deregulated Australian power market. The re-instrumentation work started in early
2003 under the leadership of Yokogawa Australia, which teamed up with TechComm Simulation, a wholly
owned Yokogawa subsidia ry.
The Challenges and the Solutions
The customer required an integrated system to control the operation of the boilers, turbines, generators
and other balance of plant equipment. Yokogawa proposed an integrated solution comprised of a distributed
control system (DCS), plant information management system, field device management system, full-replica
training simulator and field instruments together with strong local support.

Operational improvements ensuring plant reliability


The Eraring plant has four large units with a total system
input/output (I/O) count of more than 40,000 as well as 25,000
interfaces to other plant auxiliary systems.
Yokogawa's CENTUM CS 3000 R3 DCS supported this large application
in a single architecture while ensuring reliable plant operation
with its"pair&spare" non-stop controller technology.

, To satisfy the need for further operational improvement, a Yokogawa


) Exaquantum plant information management system was used for
long-term data storage, data and alarm logging, and performance .
calculation. The users can monitor the graphical data for both current
and historical plant information in an Exaquantum window at their
own PCs using the Eraring wide area network. This makes it easier
for operators and plant managers to keep informed and to make
decisions for future plant operation.

Sample window showing


control performance

The customer also desired to improve plant operation in the aspects of human resources and operating
environment. Yokogawa's high fidelity, full-replica simulator enabled custom-made operator training that fully
replicated the characteristics of the Eraring Power Station. This allowed the operators to be familiar with all
aspects of plant operation using the new control system before running the real plant.
The original analog-based control room was replaced with a new control room which is based on the latest
ergonomic deSign, securing operator's higher performance.

Power plant simulator

New control room (CAD deSign drawing)

vigilance:
System maintainability

Another important issue to be considered was system maintainability. From the late 1990's (before the control system replacement), the customer had progressively upgraded its analog field instruments selecting
Yokogawa DPharp EJA transmitters as well as other vendor's devices. A further requirement was to upgrade
the original paper-based field device management system to a Windows-based, user-friendly tool which
integrates various data from multivender HART and analogue devices into a single database. The customer
wanted system compatibility with the DCS and used the opportunity of the plant revamping to achieve tight
integration of the field device management system into the DCS.

Yokogawa met these requirements for integrated device management across the HART protocol with a combination of its CENTUM CS 3000 DCS and its Plant Resource Manager (PRM) software. The new system inte) grates all field information into a single database on a PRM server and allows real-time, remote maintenance
of many hundreds of devices, including around 500 EJA transmitters, via the DCS networks and HART I/O
modules. The open architecture of PRM will also allow the diagnostics of smart Fisher valve positioners via the
Yokogawa DeS just by loading diagnostic plug-in software onto the PRM server. This integrated maintenance
solution helped Eraring's maintenance crew streamline plant maintenance work.

Ethl!.rnet--......_ __

Vn&--------~~------T_----~~--~~~~:

II II
4";,!O,'lfA field de'lices

'With HAAT

PRM window (sample)

Fisher vaf..e

pWooner$

Overall system configuration

vigilance:
Minimum plant outage

Another challenge was the tight commissioning schedule. The first outage was planned 15 months after the
initial order. To minimize the time taken for the control system replacement, Yokogawa proposed a unique
solution making full use of the capabilities of the Yokogawa DCS and simulator.
The CENTUM has a unique engineering test function that enables an application functional test on a generalpurpose PC without any real controller hardware. Yokogawa affiliate TechComm Simulation developed the
high-fidelity Simulation system based on the detailed plant documentation supplied by the customer. Combining these capabilities, Yokogawa engineers were able to very extensively test the new control system on the
simulator prior to DCS commissioning, thereby minimizing the final tuning work once the unit returned to
) service.
Eraring plant operators were well trained in the new control system utilizing the simulator. This avoided
mistakes that could have occurred if they had not been familiar with the new system, ensuring a smooth
plant commissioning process.

The Results
Faster commissioning

The four units at Eraring are being retrofitted progressively, with the first changeover in August 2004 and the
second unit being completed at the beginning of 2005. The customer was very pleased that Yokogawa has
completed return to service of the first unit ahead of schedule, with the second unit approximately two weeks
early and similar results expected for the third and fourth units.

Efficient operation ensuring high reliability

) The renovated units give very stable, and at the same time more flexible operation than before. After the
. revamping, the customer now makes everyday load changes at a rate faster than with the previous control
system. This can provide financial benefits in the competitive Australian electricity market.

vigilance~

o
Time: (Mill.}

The result of control performance

Efficient maintenance

Integrated device management enables predictive maintenance, reducing routine maintenance work. Jeff
Hogan, Power Station Technicians Supervisor of Eraring Energy said, "The upgrading of field instrument is still
in progress but PRM has provided access from our workshop to all smart instruments on site. When a plant
problem occurs we are able to verify the validity of reading and configuration settings of the associated instrument within a couple of minutes. A great diagnostic tool which enhances the Yokogawa CS3000 System."

System Configurations and Details


)

Distributed control system: CENTUM CS3000 R3


Burner management system: CENTUM CS3000 R3
Plant information management system: Exaquantum
Integrated plant resource management system: Plant Resource Manager (PRM)
Simulator: TechComm full-replica training simulator
Field devices: EJA series electronic pressure transmitters, GD series gas density meters
Project includes: Full functional requirements design, control system software development

factory acceptance, installation, commissioning & tuning