NATIONAL HIGHWAY AUTHORITY OF INDIA


CONSTRUCTION OF 4- LANE (PARTIAL ACCESS CONTROLLED) LADDOWAL BYPASS FROM Km 0.000 TO 17.041 LINKING NH-95 WITH NH-1
VIA LADDOWAL SEED FARM AT LUDHIANA IN THE STATE OF PUNJAB ON HYBRID ANNUITY MODE

Description
S. NO.

unit

Estimated Quantity

unit Rate

Total Amount (Rs.)

BILL NO.1:SITE CLEARANCE


Clearing and grubbing road land, embankment and it's slope complete as per Technical Specification Clause 201,
1.01 or as directed by the Engineer.

Hect.

52.80

28,000

Dismanting including disposal of unserviceable material and stacking the serviceable material INCLUDING ALL
LEADS AND LIFTS, COMPLETE AS PER Technical Specification Clause 202 and Section 2800, or as directed
1.02 by the Engineer.
d) Bituminous PVEMENT
cum
e) Granular bases/sub-base course
cum
f) Scarification
sqm
Total Amount of Bill No. 1, carried forward to summary
BILL NO. 2 : EARTHWORK

2,560.80
5,120.72
13,212.32

220
125
65

Earth in excavation necessary for construction of roadway complete as per Drawing and Technical Specification
2.01 Clause 301, or as directed by the Engineer.
a) in all types of soil including marshy soil
b) Rock (not requiring blasting)
b) Rock ( requiring blasting)

cum
cum
cum

76,453.52

105

Providing and construction of embankment with approved materials from borrow areas, including all leads and
2.02 lifts cxomplete as per Drawing and Technical Specification Clause 305, or as directed by the Engineer.

cum

680,828.72

350

238,290,052

Providing and construction of sub-grade and earthen shoulder with approved material from borrow araes,
satisfying the requirments of minimum soaked CBR value as indicated in the drawinh, include all leads and lifts as
2.05 per Technical Specification Clause 305 and 407, or as directed by the Engineer.
cum

272,045.84

365

99,296,732

16,289.68
30,577.36

150

2,443,452
-

79,200.88

1,500

118,801,320
-

cum

46,952.40

3,650

171,376,260

cum

90,717.44

9,650

875,423,296

Providing and filling in media/island with approved material obtained from road way execution with all leads and
2.06 lifts complete as per Technical Specification Clause 305 and 407, or as directed by the Engineer.
cum
2.07 Special Fill in canal Portion
cum
Total Amount of Bill No. 2, carried forward to summary
BILL NO. 3: SUB-BASE AND BASE COURSES
CONSTRUCTION OF GRANULAR SUB-BASE BY PROVIDING GRADE Material, mixing in a mechanical
mix plant at OMC, carriage of Mixed material to work site, spreading in uniform layers with moter grader on
prepared surface and compacting with vibratory power roller to achieve the desired density, complate as per clause
3.01 401
cum
Total Amount of Bill No. 3 , Carried forward to summary
Bill no. 4: CONCRETE PAVEMENT
Providing and laying Dry Lean cement concrete (DLC) as per Table 600-1 of Technical Specification Clause 601
4.05 with a minimum cement content of 150 kg/cum
Providing un-reinforced,dowel jointed, pavement quality concrete (PQC) OF m40 grade concrete with minimum
cement content of 360 kg/CUM , including all cost of jointing edge cutting dowel bares etc., all complete as per
4.06 drawing and technical Specification clause 602
Total Amount of bill no. 4 c/f to summary
Total

1,478,400

563,376
640,090
858,801
8,027,620
-

1,517,199,398

NATIONAL HIGHWAYS AUTHORITY OF INDIA


CONSTRUCTION OF 4-LANE(PARTIAL ACCESS CONTROLLED) LADDOWAL BYPASS FROM Km 0.000 TO 17.041 LINKING
NH-95 WITH NH-I VIA LADDOWAL SEED FARM AT LUDHIANA IN THE STATE OF PUNJAB ON HYBRID ANNUITY MODE

QUANTITY ABSTRARCT

Unit

Estimated
Quantity

S.No.

Description

5.01

Bill No. 5 : Box, PIPe & SLAB CULVERTS


Earthwroks in excavation for foundation for structures compiete with all lifts and lead upto 1 Jm complete as per

Unit Rate

Total Amount(Rs.)

a
5.02

drawing, technical specilication sections 300 and 2900 and as directed by Engineer.
In all type of strata excluding Hard rock
Cum
Providing and laying Plain cement concrete in open foundation and below foundation of culverts complete as per

4,895.44

135

660,884

a
b
5.03

drawing, Technical Specilication Sections 1500, 1700 and 2100 and as directed by Engineer.
PCC Grade M 15 for levelling course
Cum
PCC Grade M 15 for curtain wall
Cum
Providng and laying Reinforced cement concrete in sub-structure, mechnically mixed and compacted, including centering

882.64
31.68

3,500
4,200

3,089,240
133,056

7.04
39.60

6,000
6,300

42,240
249,480

693.44
3,062.40

4,000
6,500

2,773,760
19,905,600

69.52

7,300

507,496

MT
MT
MT

3.52
223.52
5.28

60,000
60,000
60,000

211,200
13,411,200
316,800

Rmt

855.36

7,500

6,415,200

No.

3.52

1,000

3,520

20.24

3,500

70,840

41.36

11,500

475,640

5.09

cum.
Providing and laying reinforced cement concrete M 30 Grade approach slab including cost of reinforcement (HYSC
TMT Fe 500) complete as per drawing Technical Specification Sections 1500,1600,1700 and 2700 and as directed by
cum
Engineer
Providing weep holes in masony/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe
(Heavy Duty), complete as per drawing, technical Specification Section 2500 and as directed by Engineer.
No.
Providing and laying back fill with granular material behind abutment, wing wall and return wall complete as per

566.72

100

56,672

5.10

cum.
drawing, Technical Specification Section 300 and as directed by Engineer
Providing and laying filter media complete as per drawing, Technical specification Section 2500 with thicJness not less

2,889.04

1,500

4,333,560

5.11

than 600mm behind abutment, wing wall and return wall and as directed by Engineer
cum.
Providing and fixing in position bituminous paper bearing for slabs as per approved drawing and confirming to IS: 1398
and as directed by Engineer.
sqm.

999.68

1,500

1,499,520

8.80

200

1,760

44.00

200

8,800

573.76

4,500

2,581,920

1,835.68

850

1,560,328

and shuttering but excluding cost of reinforcement, all complete as per drawings and Technical specifications and as
b
d
5.03

directed by the Engineer-in charge


RCC Grade M25 for Foundation
Cum
RCC Grade M35 for Foundation\
Cum
Providng and laying Reinforced cement concrete in sub-structure, mechnically mixed and compacted, including centering
and shuttering but excluding cost of reinforcement, all complete as per drawings and Technical specifications and as

a
d
5.03

directed by the Engineer-in charge


PCC Grade M20 for Substructure (Head Wall)
Cum
RCC Grade M35 for substructure
Cum
Providng and laying Reinforced cement concrete in sub-structure, mechnically mixed and compacted, including centering
and shuttering but excluding cost of reinforcement, all complete as per drawings and Technical specifications and as

d
5.04

a
b
c
5.05

5.05c
5.06
5.07
5.08

5.12
5.13
5.15

directed by the Engineer-in charge


RCC Grade M35 for superstructure
Cum
Supplying, fitting and placing HYSD(TMT, FE 500 grade) reinforcement in foundation, sub-structure and superstructure complete as per drawing, Technical Specification Section 1600 and as directed by Engineer
For Foundation
For Substurcture
For Superstructure
Providing and laying reinforced cement concrete pipe NP4 pipe on first class bedding of granular bedding material
(including cost of bedding) in single row/ multi rows including fixing colloar with cement, mortar 1.2 (but excluding
excavation protection.
Dia 1200mm (internal)
Providing and laying Draingae Spouts complete as per drawing, Technical Specification Section 2700 and as directed by
Engineer.
PCC M15 Grade Leveling Course below approach slab complete as per drawing and technical specification

Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per drawing, Technical
Specification Section 2500 and as directed by Engineer.
m
Providing and laying reinforced cement concrete crash barrier at the edge of the road, approaches to bridge Structures
and medians, consturcted with M40 grade concrete with HYSD (TT Fe 500) reinforecement compiete as per drawing

5.17

m
technical specification
Providing and laying in position 65 mm thick wearing course consisting of 40 mm thick biluminous concrete with 25mm
Mastic Asphait over decJ slab after appying prime coat complete as per drawings, Technical Specification Section 2700
and as directed by E
sqm.
Total

58,308,716

NATIONAL HIGHWAY AUTHORITY OF INDIA


CONSTRUCTION OF 4- LANE (PARTIAL ACCESS CONTROLLED) LADDOWAL BYPASS FROM Km 0.000 TO 17.041 LINKING NH-95 WITH NH-1

VIA LADDOWAL SEED FARM AT LUDHIANA IN THE STATE OF PUNJAB ON HYBRID ANNUITY MODE

S. NO.

Description

Estimated
Quantity

unit

unit Rate

Total Amount (Rs.)

Providing and Laying Filter material underneath pitching in slopes complete as per draeing.
5.18 Technical Specification Section 2500 and as directed by Engineer.

cum.

79.20

1,500

118,800

Providing and laying stone Pitching on slopes laid over prepared filter media including
boulder apron laid dry in front of toe of embantment complete as per drawing, Techincal
5.19 Specification Section 2500 and as directed by Engineer.

cum.

189.20

1,500

283,800

Per cm ht. per


letter

3,696.00

25

92,400

sqm.

1,290.96

100

129,096

cum.
cum.

19.36
6.16

5,500
2,500

106,480
15,400
59,054,692

Excavation of foundation of structure in all types of strata other than rock as per drawing and
Technical Specification, including setting out, construction of shoring and bracing, removal
of stumps and other deleterios matter, dressing of sides and bottom and back filling with
6.01 approval material etc. complete.

cum.

3,130.16

Providing and laying in position plain Cement Concrete of Grade M-15 in levelling course
below open foundation, pile caps, approach slabs, relating wall, wring wall, box structure,
curtain wall and in inspection ladders and annular filling around foundation in rock complete
6.02 as per drawing a nd Technical Specification Section 1700 and 2700

cum.

105.60

Providing and laying in position Reinforced Cement Concrete grade M-35 in bored cast in
situ 1.2 m dia concrete piles including boring for piling, cost of routine load test but
excluding cost of steel reinforcement complete as per drawing and Technical Specification
6.03 Section 1100, 1700 and IRC:78-2000 for 1200mm dia. P-iles in all type of starta.

Rm

1,453.76

Providing and laying in position concrete of Grade M 35 in RCC pile caps butb excluding
cost of reinforcement, complete as per drawing and Technical Specification Section
6.04 1500,1700 and 2300.

cum.

1,085.04

cum.

535.04
101.20

Providing and laying Plain/ Reinforced cement concrete in sub-structure complete as per
drawing & technical Specification R.C.C Grade M-35 for Pier Cap with Batching Plant,
6.06 Transit Mixer & concrete pump . Spec. No. MoRTH &H 1500,1760 & 2300 Spc. No. 13.

cum.

821.92

Proiding and laying Pretressed cement concrete M45 in Super Structure complete as per
6.08 drawing and Technical Specification Section 1500, 1700, 1800, and 2300.
a) in PSC I Girders
b) in PSC Voided slabs
c) in PSC Box Griders

cum.
-

659.12
-

Providing and laying wearing course 65 mm Thick (40 BC+ 25 Asphaltic) on top of deck
6.09 complete as per Tech. Spec. Cl. 515 & 2702

Sq. M

2,256.32

MT

600.16

Providing painting , figuring and numbering to culvert upto 6m. Span complete with
Synthetic Enamal Panint, Two coats on new worj, completeas per Technical Specification
5.2 800 and as approved by Engineer.
Providing and applying 2 coats of water based cemant paint to unplastered concrete surface
after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1
5.21 liter for 2 sqm. Complete as per Technical Specification Section.

Providing and laying Rigid flooring 300mm thick flat stone in cement motar 1.3 over 150
mm thick cement concrete M15 grade including cost of providing and laying M15 cement
5.22 concrete complate as per drawing, Technical Specification Section 2500, IRC:89 an.
5.24 Filling in Quadrate Salop Protection
Total Amount of Bill No. 5, carried forward to summary
BILL NO. 6:MINOR/MAJOR BRIDGE

Providing and laying Reinforced Cement Concrete M 35 in Superstructure excluding


reinforcement complete as per drawing and Technical Sp[ecification Section 1500,1700 and
6.05 2300.
a) in RC slab
b) in RC Girder

Supplying, fitting and placing HYSD bar reinforcement in foundatiom/sub- structure


complete as per drawing and technical Specification
spec. no. MoRTH
6.1 & H -1600,2000
Total

NATIONAL HIGHWAY AUTHORITY OF INDIA


CONSTRUCTON OF 4-LANE (PARTIAL ACCESS CONTROLLED) LADDOWAL BYPASS FROM Km 0.000 TO Km 17.041 LINKING NH-95 WITH NH1 VIA LADDOWAL SEED FARM AT LUDHIANA IN THE STATE OF PUNJAB ON HYBRID ANNUITY MODE

SI NO.

Description

Unit

Estimated
Quantity

MT

29.92

1.76
1.76
7.04

5.28
5.28
7.92
7.92

Cum

84.48

Cum

333.52

Rmt

116.16

NO

28.16

Sqm

333.52

Cum

1320.88

Cum

350.24

Cum

594

Cum

183.04

No

1.76

Unit Rate

Total Amount

Providing and fixing in position to exact profiles as given in the drawings for PSC deck, Low
relaxation HT steel strands of required dia. Conforming to class II of IS:14268. including
6.11

anchorages, end block, galvanized sheathing of required dia. And 0.5 mm thick , stressing of
strands from an approved manufacturer, grouting the cables and all leads and heights as per
detailed specifications all as directed by EIC, completed to his satisfaction
Suppling, fitting and fixing in position true to line and level POT-PTFE Bearing confirming to

6.13

IRC:83(PartII ) section IX and clause 2005 of MORTH specifications complete including all
accessories as per Spec. No MORT & H -2000 & 2200
Pinned
Metalic Guided
Free
Pinned
Metalic Guided
Free
Fix Bearing
Transverse Guided
Longitdunial Metallic Guided Bearing
Free Bearing
Providing and laying Plain/ Reinforced cement concrete in Superstructure complete as per

6.14

drawing & Technical Specification R.C.C. Grade M-30 for Deck Slab of Ramp and approch
Slab near A butment with Batching plant, Transit Mixer & Concrete pump. Spec. No. MORT &

T- Capacity

H 1500,1760 & 2300 Spc. No. 13.


Providing and laying controlled M-40 RCC cement concrete of trap/granite / quartize/ gneiss
6.15

metal for cast in situ crash barrier, kreb ,etc. Including compacting by vibrating and curing
including formwork and bailing out of water Spec. No. BR 50 Page No. 143 and BR 7 Page No.
38
Proving and laying of strip seal expansion joint catering to maximum horizontal movement upto
70 mm, complete as per approved drawings and standard specification to be installed by the

6.16
manufacturer /supplier or their authorised representative ensuring compliance to the

6.17
6.18
6.19

manufacturer instruction for installation etc. complete. Spec No . MORT & H -803
Drainage spouts complete as per drawing and technical specification Spec. No. MORT & H
-2705
Painting two coats after filling the surface with synthetic enamel paint in all shades on new
concrete surface Spec. No. MORT & H-803
Back filing behind abutment wing wall and return wall complete as per drawing and Technical
Specification
Providing and laying of Filter media with granular material/stone crushed aggregates satisfying
the requirments laid down in clause 2504.2.2. of MORT & H specifications to a thickness of not

6.20

less than 600mm with smaller size towards the soil and bigger size towards the wall and
provided over the entire surface behind abutment,wing wall and return wall to the full height
compacted to a firm condition to a firm condition complete as per drawing and Technical
Specification.
Providing and Laying Stone Pitching on slopes laid over prepare filter media inluding boulder

6.21

apron laid dry in front of toe of embarnkment complete as per drawing ,Techincal Specification
Section 2500 and as directed by Engineer.
Providing and laying filter material underneath pitching in slopes complete as per drawing

6.22
6.23

,Technical Specification Section 2500 and as directed by Engineer.


Pile Load Test on single Vertical Pile in accordance with IS:2911(Part-IV)
a) Initail Load Test

Total

NATIONAL HIGHWAY AUTHORITY OF INDIA

S. NO.
6.24

CONSTRUCTION OF 4- LANE (PARTIAL ACCESS CONTROLLED) LADDOWAL BYPASS FROM Km 0.000 TO 17.041 LINKING NH-95 WITH NH-1
VIA LADDOWAL SEED FARM AT LUDHIANA IN THE STATE OF PUNJAB ON HYBRID ANNUITY MODE
Estimated
Total Amount (Rs.)
Description
unit
unit Rate
Quantity

Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12mm, true
to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre spacing
betweeen vertical post for expansion, complete as per drawing and Technical specifications

6.25

and as directed by the Engineer-in-charge


Rmt.
Providing weep hoies in Brick masonry/plain/reinforced concrete abutment, wing wall/return

65.12

285.12

616.00

5,329.28

445.28

2,956.80

1,789.0

976.80
170.72

2,831.84

1,595.44

5,170.00

1,262.80

wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of
1v:20 H towards drawing face all coplete as per Technical specifications and as directed by
6.26

the Engineer-in-charge
No.
Printing of up No. and span arrangement of any shade with synthetic enamel paint black or
any other approved colour to give an even shade as per Technical Specifications and as
directed by the Engineer-in-charge.
per cm height per
Total Amount of Bill No. 6, carried forward to summary
Bill No. 7: Flyover
Excavation of foundation of structures in all types of strata other than rock as per drawin and
technical specification, including setting out construction of shoring and bracing, removal of
stups and other deleterios matter, dressing of sides and bottom and back filling with approved

7.01
7.02

Cum
material etc. complete.
Providing and laying in position Plain Cement Concrete of Grade M-15 in levelling course
below open foundations pile caps, approach slabs retaning wall, wing wall, box structure,
curtain wall and in inspection ledders and annular filling around foundation in rock complete

7.03

Cum
as per drawings and Technical Specifications SEctions 1700 and 2700
Providing and laying in position Reinforced Cement Concrete grade M 35 in bored cast in situ
1.2 m dia concrete piles including boring for pilling, cost of routine load test but excluding
cost of steel reinforcement complete as per drawings and Technical specifications Sections

7.04

7.05

7.06

Rm
1100, 1700 and IRC: 78-2000 for 1200 mm dia, piles in all type of starta.
Providing and laying in position concrete of Grade M35 in RCC pile caps but excluding cost
of reinforcement, complete as per drawings and Technical Specifications Sections 1100, 1500
Cum
and 1700
Providing and laying reinforced Cement Concrete M35 in superstructure excluding
reinforcement complete as per drawings and Technical Specifications Sections 1500, 1700
and 2300
a) in RC Slab
Cum
b) in RC Girder
c) in RC Voided slab
d) in RC Box Girder
e) in footpath/Kerb etc
Providing and laying palain/reinforced cement concrete in Sub-Structure complete as per
drawing & Technical Specification R.C.C Grade M35 for Pier Cap with Batching plant,

7.08

Transit Mixer & concrete pump, Spec. No. MORT & H 1500, 1760 & 2300 Spc. No. 13
Cum
Providing and laying prestressed Cement Concrete M45 in SuperSturcture complete as per

7.09

drawings and Techinical specifications Sections 1500, 1700, 1800 nad 2300
a) in PSC I Girders
Cum
b) In PSC Voded slabs
c) in PSC Box Girders
Providing and laying wearing course 65mm Thick (40BC+25 Asphaltic) on top of deck

7.10

complete as per Tech. Spec. CI 515 &2702


sq.m
Suppying, fitting and placing HYSD ar reinforcement in foundation/substructure/sperstructure complete as per drawing and technical specifications.
Spec. No.
MORT & H-1600,2000
MT
Total

NATIONAL HIGHWAY AUTHORITY OF INDIA


CONSTRUCTON OF 4-LANE (PARTIAL ACCESS CONTROLLED) LADDOWAL BYPASS FROM Km 0.000 TO Km 17.041 LINKING NH-95 WITH NH-1
VIA LADDOWAL SEED FARM AT LUDHIANA IN THE STATE OF PUNJAB ON HYBRID ANNUITY MODE
S. NO.

Description

unit

Estimated
Quantity

unit Rate

Total Amount (Rs.)

7.11
Providing and fixing in position to extract profiles as given in the drawing fo5r PSC deck,
Low relaxation HT steel stards of required dia, conforming to class II of IS :14269, including
anchorages, and block, galvanized sheathing of required dia, and 0.5 mm thick, stressing of MT
strands from an approved manufacture, grouting the cables nand all other ancillarey and
allied works related to prestressing, directed by EIC, complete to his satisfaction.

72.16

37,433.44

7,649.84

7.12

duly watered, rolled and completed.


sqm.
Providing and laying in position RCC crash bariier and friction slab in M40 grade complete
but excluding reinforcement as per drawing and technical Specifications claused 1500, 1600,
1700 and 2300.
Lm
Filing,grading and compaction with selected soild meeting approved design parametres in
Cum
layers in soil reinforced zone complete as per MoRT & H specifications Section 3100
Proving filter media behidn reinforced earth panel with well packed materials to specified

164,706.96

7.12(d)

22,460.24

4.40
4.40
3.52

2.64
2.64
3.52

7.04
10.6
7.04
10.56

317.68

870.32

H - 2607
Rmt.
Drainage spouts complete as per drawing and technical specification spec. No. MORT & H2705
No.
Painting two coats after filling the surface with synthetic enamel paint in all shades on new
sqm.
concrete surface. Spec. No. MORT & H-803

236.72

65.12

711.04

Down Take pipe

739.20

7.12(a)

Constructions of Reinforced Earth retaining wall including excavation for foundation,


foundation concrete and cement concrete grooved sealing in foundation for facing elements
and placement, assembling, joining and laying of reinforcing element complete. The above
item shall be payable only after backfilling behind the wall is completed by granular material

7.12(b)

thickness with smaller size towards the soild and bigger size towards the wall complete with
all leads and lifts as per approved design, drawing and Technical Specifications clauses 305
7.13

Cum
& 2504
Supplying, filtting and fixing in postion true to line and level POT-PTFE Bearing confirming
to IRC: 83 (Part-II) section IX and clause 2005 of Drawing and technical specifications
Spec. No. MORT & H-2000 & 2200
Pineed
Metalic guided
Free
Pinned
Metalic guided
Free

7.14

Fix Bearing
Trannsverse guided
Longitidulnal metallic guided bearing
Free Bearing
Providing and laying Plain /Reinforced cement concrete in Superstructure complete as per

T-Capacity
-

drawing & Technical Specification R.C.C Greade M30 for Edeck Slab of Ramp and
approach slab near Abutment with Batching Plant, Transit Mixer & Concrete pump. Sp[ec.

7.15

No. MORT& H 1500, 1760 & 2300 spc. No. 13


Cum
Providing and laying controlled M40 RCC cement concrete of trap/granite/quartize/gneiss
metal for cast in situ carash barrier, keerb, etc. inculding compacting by vibration and curing
inculding formword and bailing out of water. Spec. No. BR 50 Page no. 143 and BR 7 page

7.16

no. 38
Cum
Providing and laying of a strip seal expansion joint catering to maximum horizontal
movement upto 70 mm, complete as per approved drawings and standard specification to be
installed by the manufacturer/supplier or therir authorised representative ensuring
compliance to manufacturers instructions for installation etc. complete. Spec. No. MORT &

7.17
7.18
7.19

Total

RM

NATIONAL HIGHWAY AUTHORITY OF INDIA


CONSTRUCTION OF 4- LANE (PARTIAL ACCESS CONTROLLED) LADDOWAL BYPASS FROM Km 0.000 TO 17.041 LINKING NH-95 WITH NH-1
VIA LADDOWAL SEED FARM AT LUDHIANA IN THE STATE OF PUNJAB ON HYBRID ANNUITY MODE

Sl. No
7.20

Description
Pile Load Test on single vertical pile in accordance with IS: 2911(Part-IV)

Unit

a) initial load test

Nos.

Printing of up No. and span arrangement of any shade with synthetic enamel paint black or
any other approved colour to give an even shade as per Technical Specifications and as
directed by the Engineer-in-charge

per cm height
per letter

Estimated
Quantity

Unit Rate

Total Amount (Rs)

1,742.40

32,951.60

cum
cum
cum
cum

676.72
4,446.64

and as per drawings and Technical specifications Section 1600, or as directed by the Engineer MT
Turting embankment slopes, median and other locations with green sods all complete as per

155.76

66,301.84

3,342.24

394.24

1,179.20

2,005.52

1,336.72

14,432.00

9,838.40
7,216.00

992.64

30,871.28
18,523.12
84,318.96
4,224.00
12,979.12

35,688.40
1,562.88
16,089.92

7.21

Total Amount of Bill No. 7 carried forward to summar


Bill No. 8 : Drainage And Protection Works
8.01

8.02

Earthwork in excavation for drains with all lifts and leads complete as per drawing and
Technical Specifications Clause no. 304 asnd 309
a)in all types of soil including marshy soil
cum
b) Rock (not requiring blasting)
cum
C) Rock (requireing blasting/ controlled blasting)
cum
Providing and laying in position plain cement concrete of Grade M15 in levelling course
below drains complete as per drawings and Technical specifications Sections 1500, 1700 and

8.03

Cum
2700 or as directed by the Engineer
Providing and consturcting Line drain, toe wall, Retianing wall and other allied workds as per

8.04

IRC-6 complete as per technical specification clause 309 and as directed by the Engineer
a) PCC M 15 Grade
b) RCC M 20 Grade
c) RCC M 25 Grade
d) RCC M 30 Grade
Providing, placing and fixing in position thermomechanically treated (TMT) Fe-500 grade
reinforcement bars or prefabricated reinforcement cage for drains including cutting,
straightening, cleaning, bending, welding, binding with GI binding wire of suitable gaudge

8.09

8.1
8.11
8.12

8.13
8.14
8.15
8.16

8.17
8.18
8.19
i)
ii)
iii)
iv)
8.2
8.21
i)
ii)
iii)

technical Specification clause 307, or as directed by the Engineer


Sqm
Construction of drainage chute on high embankment slopes complete as per drawing and
Technical Specification Section 1500 and 1700
Lm
Construction of Energy Dissipation Basin at toe of chutes complete as per drawing and
Technical Specification Sections 1500 and 1700
Nr.
Providing RCC Hume Pipe NP4 as per drawing and Technical Specifications Section 2900
Lm
900 dia
Lm
1000 dia
Lm
Providng and laying stone pitching on Embankment slopes as per drawings and Technical
Cum
Specifications Clauses 1400 and 2500
Providing and laying filter media beneath the stone pitching complete as per drawing and
Cum
Technical Specifications clause 2504
Providing of New weep holes as per Technical Specification and as directed by the Engineer
no.
Providing and erecting a W metal beam crash barrier complete as per Drawings and technical
specifications clause 810
a) Providsion of new metal beam crash barrier
Lm
Providing M.S. Railing as per drawing
Lm
Providing and constructing Guard Stone complete as per drawing and Technical Specification
Nr.
Section 1500, 1600 and 1700
RE wall
RE wall Fascia Panel
Sq. m
Filter media
cum
Select fill in reinforcing zone
cum
Crash Barrier and friction slab
Lin.m
Canal Lining
cum
Retianing wall
Excavation
cum
PCC
cum
RCC-M25
cum
Total

NATIONAL HIGHWAY AUTHORITY OF INDIA


CONSTRUCTION OF 4- LANE (PARTIAL ACCESS CONTROLLED) LADDOWAL BYPASS FROM Km 0.000 TO 17.041 LINKING NH-95 WITH NH-1
VIA LADDOWAL SEED FARM AT LUDHIANA IN THE STATE OF PUNJAB ON HYBRID ANNUITY MODE

QUANTITY ABSTRACT
Estimated
Quantity

Sl. No

Description

Unit

iv
v
vi
vii
viii
ix
x

TMT steel
Filter Media
Weep Hole
Back filling
Slab
Mastic over cantilever/ portal portion
Crash Barrier over retaining wall
Total Amount of Bill No. 8, carried forward to summary

MT
cum
Nr
cum
cum
Sqm
Lin.m

885.28
11167.2
12091.2
17193.44
992.64
2782.56
5016

0
0
0
0
0
0
0

Lm
Lm

26454.56
3942.4

0
0

Nr.
Nr.
Nr.
Nr.

149.6
5.28
24.68
119.68

0
0
0
0

Sqm.
Nr.
Nr.

11641.52
31.68
3.52

0
0
0

Sqm.
Nr.

1.76
1.76

0
0

1.76
20.24

0
0

95.92
17.6
95.92

0
0
0

7011.84
8.80

0
0

0.88
0.88

0
0

1.76

14148.64

9.01 a

Bill No.9: Traffic Signs, marking & Other Appurtenances


Construction of plain cement kerb & channel M-20 grade including foundation complete
as per drawing & technical specifications Clause 408

i)
ii)

New Kerb laying


Channel Kerb

Unit Rate

Total Amount (Rs)

9.02
Providing and fixing reinforced cements concrete M-20 grade boundary, stones,
hectometre, km and 5th km stones including excavation, foundation concrete in M-10
grade and reinforcement including all inscriptions etc. complete as per drawing and
technical specifications Clause 800
(a) Boundary Stones
(b) 5th km stone
( C) Km. stone
(d) Hectometre stone
Pavement marking with hot applied thermoplastic paints confirming to ASTM D36/BS3262 (Part-1) as per drawing and technical specifications Clause 803

9.03

a) Lane/centre line/ edge line marking


b) Pededtrain crossing
c) Chevron Marking
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign
as per IRC: 67 made of encapsulated lens type high intensity reflective sheeting vide
clause 801.3, fixed over aluminium sheeting, 2.0 mm thick including vertical pipes/
angles/ posts, earthworks, PCC M-15 foundations and incidentals complete as per
drawing and technical specifications Clause 801

9.04

a) Informatory Signs, facility Signs, Directions Signs, Advance Direction/ Destination


signs, Route Marker Signs, etc
b) Cautionary Signs, Triangular (Size 900 mm side)
c) Mandatory Signs
i) Circular 600mm dia.
ii) Octagon 900 mm height (For "STOP")
iii) Triangular 900 mm side (for "Give Way")
iv) Route Marker Sign (4500*6100)
v) Route marker Sign (300* 250 + 450*600)
vi) NH Route Marker Sign (450* 600)

Nr.
Nr.
Nr.
Nr.
Nr.
Nr.

9.09 Proviing and construction footpath/ paved separator platform/ paved part of median and Sqm.
island including cost of providing and laying precast tiles of 25 mm thick preparation of
base, drain pipes all complete as per drawing and technical specification clause 409
9.1
9.11
9.12
9.13

Litter Bin
Solar Studs
Toilet Block
Prov drinking water Kiosk in the form of tube well
Total Amount of Bill No. 9, carried forward to summary

Nr.
Nr.
No.
No.

Bill No.10: Toll Plaza


10.01 Clearing and grubbing road land, embankment and it's slope complete as per Technical
Specification Clause 201, or as desired by the Engineer
Ha.
10.02 Providing and construction of embankment with approved materilas from borrow areas,
including all leads and lifts complete as per drawing and technical specification clause
305, or as directed by the Engineer
Cum
Total

NATIONAL HIGHWAY AUTHORITY OF INDIA


CONSTRUCTION OF 4- LANE (PARTIAL ACCESS CONTROLLED) LADDOWAL BYPASS FROM Km 0.000 TO 17.041 LINKING NH-95 WITH NH-1

VIA LADDOWAL SEED FARM AT LUDHIANA IN THE STATE OF PUNJAB ON HYBRID ANNUITY MODE

S. NO.
10.03

Description

unit

Estimated
Quantity

unit Rate

Total Amount
(Rs.)

Providing and construction of sub-grad3e and earthen shoulder with approved amterial from borrow
areas, satisfying the requirements of minimum soaked CBR value as indicated in the drdawings,
including all leads and lifts as per Technical Specifications Clause 305 and 407 , or as directed by the

10.04

Engineer.
Cum
Construction of granular sub-base by providing claose graded Material, mixing in a mechanical mix

9,433

9432.6

plant at OmC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on
prepared surface and compacting with vibratory power roller to achieve the desired desnsity , completed
as per clause 401
cum
Providing & laying Dry Lean Concrete subbase in M15 cc in Toll Plaza area as per MoRTH Spec.

2,830

2830.08

10.05

(Fourth Revision ) CI 601 and as approved by the Engineer


cu.m.
Providing & laying Pavement Quality Concrete of M45 Grade of Specified thickness in Toll Plaza area

2,764

2764.08

10.06

5,529

5529.04

264

264

6.16
1.76
1,337.60

774.40
774.40

3.52
1.76
1.76
1.76
1.76
1.76
1.76

290.40

1,258.40
283.36

57.20

using minimum cement content 350 kg/cu.m. with slip form paver as per MoRTH Spec (Fourth
10.07

10.08

10.09
10.1
10.11
10.12
10.13
10.14

10.15

a)
b)
10.16
10.17
10.18
10.19

Revision) CI 602 and as approved by the Engineer.


Providing Toll Plaza buildings including arrangement of electric supply.
a) Administrative block including change room and Pantry (7.0mx 20m)
b) Single Toll Booths
c) Double Toll booths
Providing, installing & commissioning electrically operated barrier gates
a) For 3.2 m wide toll lane
b) For 4.5 m wide toll lane
Providing and installing canopy for tall Palaza
Construction of boundary wall
Providing & fixing barbed wire fencing
Construction of covered Drain under footpath
Constructing of covered lateral Drain under road
Supplying and fixing at site retro-reflectrised type sign boards.
a) cantilever gantry signs-T1 & T8
b) cantilever gantry signs-T2
c) Kerb sign for toll gate, T3
d) Kerb sign for exempt vehicles, T4
e) Kerb sign-T5
f) kerb sign-T6
g) kerb sign-T7
Pavement marking with hot applied thermoplastic paints conforming to ASTM D36/BS-3262 (Part-I) as

Cu.m.
NO.
NO.
NO.
No.
No.
Sqm.
Rm
RM
Rm

No.
No.
No.
No.
No.
No.
No.

per drawing & Technical Specifications Clause 803


Lanel/Centerline/edge marking/transverese/pedestrian crossings/diagnoal marking and any other marking
Sqm.
Chevron marking
No.
Construction of plain cement concrete kerb M20 grade complete as per drawing & Technical
Specifications Clause 408
Lm
Painting concrete kerb complete with suitable paint
Sq.m.
Generator Room
Sq.m.
Under ground box type tunnel
Rmt.
Total Amount of Bill NO. 12, carried forward to summary
Total

9432.72