1.
Purpose
The purpose of this document is to provide step by step methodology for preheat
procedure qualification used for carbon steel and LTCS materials during equipment
modification. It is necessary to develop the procedure to ensure uniform heating using
oxy-acetylene torch and with precautionary measurements, have adequate confidence
to avoid any local hot spot /puncturing.
Studies were made on the issue and following points were observed:
2.
i)
In ordinary oxyacetylene cutting torch, the lever system is added to trigger the
cutting action. In case the oxyacetylene heating torch is designed without any
lever system, the likely hood of accidental cutting of base material is drastically
reduced.
ii)
Using oxyacetylene gas, the flame generated is having two distinct regions. The
primary combustion takes place due to inner blue cone region generating
highest temperature, i.e. as high as 3092 C which is much above the melting
point of iron (1539C). The secondary combustion takes place in the outer
portion of the flame whose temperature is below the melting point of iron and
this can be utilized only for preheating. Hence during preheating, care needs to
be exercised so that the blue cone region does not come in direct contact with
the base material.
Scope
The scope of this procedure is limited to the carbon steel and LTCS materials and
applicable to equipment modifications for project of Reliance.
3.
4.
5.
Reference
AWS Handbook
CS
Carbon steel
HOD
LTCS
PWHT -
QMD
Responsibilities
EPCMD-2-QM00-JEP-ME-032, Rev:00
Confidential Reliance. All rights reserved
Page 3 of 6
Reliance
6.
Methodology
6.1
Variables:
Following are the essential variables and change in any of these variables shall require
re-qualification of the procedure:
The heating torch must be designed without any lever arrangement for cutting
actions. In addition, the heating torch design and manufacturer of torch shall be
treated as essential variable.
The distance between torch tip and job surface shall be maintained 6 inch
(minimum) and blue cone flame length shall be 3 inch (max). Any change will
require re-qualification.
6.2
Preparation of joint:
Under present scope of work for nozzle modification job, the material is required to be
preheated for thickness > 25mm. The maximum thickness of vessel is 88mm.
Instances will arise (during nozzle to shell joining) that though the nozzle thickness
does not ask for preheating, but preheating is required due to the heavy thickness of
shell. The preheating temperature on job shall be as follows:
Sr.
No.
6.3
Thickness of base material (In case of dissimilar thickness, preheating temperature shall
be decided by the higher thickness material)
Preheat
temperature (min)
01
Thickness>25 to 32mm
79C
02
95C
03
125C
EPCMD-2-QM00-JEP-ME-032, Rev:00
Confidential Reliance. All rights reserved
Page 4 of 6
Reliance
6.4
6.4.1
Time taken to reach the preheat temperature on the groove shall be noted. Preheating
temperature shall be checked with temple stick.
6.4.2
After reaching the preheating temperature on the groove, same shall be verified on
either plate at a distance of 25mm (minimum) from the edge of the groove to assess
the uniformity of heating.
6.4.3
The length up to which the same preheat temperature is maintained shall be noted to
understand and assess the capacity of the torch.
6.4.4
Preheat temperature shall be continued on the joint for a further period of 30 minutes
and then observed through visual inspection for any puncture/damage on the coupon.
6.5
Acceptance:
6.5.1
In case the same preheat temperature is achieved on groove as well as on either side
of the joint at a time and there is no physical damage observed on base material
during preheating, the procedure shall be treated as qualified within the limits of
variables.
6.5.2
The minimum thickness qualified shall be the thickness of the test coupon.
7.
Attachment:
Annexure-1 (Preheating Procedure Qualification Record Format)
EPCMD-2-QM00-JEP-ME-032, Rev:00
Confidential Reliance. All rights reserved
Page 5 of 6
Reliance
Annexure-1
Pre-heating Procedure Qualification Record Format
Sr.
Check points
No.
01
02
03
Remarks
04
05
06
Observation
07
08
09
10
11
EPCMD-2-QM00-JEP-ME-032, Rev:00
Confidential Reliance. All rights reserved
Page 6 of 6