Beruflich Dokumente
Kultur Dokumente
1
To Temporary Storage
Note 1
SIS
PAHH
165 kPa 206
SV-206
RV-201
180 kPa
From LT-204 on
BT-101
IV-203
H
TW
201
TI
201
FI
202
PI
203
TT
201
FT
202
PT
203
PT
206
DV-203
TW
211
IV-206
TW
208
TT
208
FT
209
TI
208
FI
209
FAH/L
CT
210
CAH/L
CI
210
P-210-080-250-S6-P
CV-202
To Vapour Containment
P-212-080-250-S6-P
To PLC-210 for Nt-201
PIC
205
To PV-205 Cooling
water to HX-201
PAL 95 kPa
IV-208
CD-201
To Vapour Containment
P-213-080-500-S6-P
IV-223
65x50
50x65
BV-201
C-202-040-050-PV-N
FI
212
FT
212
TI
213
TW
213
180 kPa
TW
215
DV-207
Note 3
IV-209
TT
213
FT
229
PI
226
TW
230
IV-224
PI
231
TT
230
PT
231
P-214-080-500-S6-H
FI
225
IV-211
DV-205
PT
226
TW
215
IV-210
PT
214
TI
230
DV-208
IV-222
IV-221
TT
215
PI
214
FI
229
MV-205
CV-203
P-203-080-080-S6-H
RV-202
TT
215
MV-201
To Azeotropic
Distillation
Column ADC-201
Average
TX
215
CD-202
FT
225
HX-202
HX202
Note 4
TW
227
TT
227
LT
228
TI
227
LAH/L
LAHH
LI
228
LAH/L
M2
LIC
221
TT
215
TW
215
IV-219
IV-220
IV-225
P-218-080-50-S6-P
FO
TW
CV-206 232
PV-221
TI
232
PI
233
TT
232
PT
233
To Extraction Column
EC-401
IV-226
CV-205
PT
224
TT
215
DV-209
IV-227
PI
224
MV-206
TT
223
TI
223
40x25
BV-203
CD-204
P-215-080-40-S6-H
25x40
TW
235
FT
234
FI
234
CD-205
TW
223
TW
215
TT
235
TI
235
165 kPa
FI
216
FT
216
TW
218
TI
218
PI PAH/L
219 PAHH
TT
218
PT
219
To Steam Utilities
IV-228
Note 5
22
PT
217
CV-204
IV-212
LT
221
S-216-080-100-S4-H
PI
236
WWD-201
P-217-080-100-S6-P
To Temporary Storage
TIC
215
M1
PI
217
PT
236
DV-210
LT
220
IV-217
FC
PV-215
IV-218
FI
222
MV-203
IV-213
IV-216
LAHH
SIS
220
SV-220
P-207-080-100-S6-P
Note 6
DV-206
200x150
Vapour containment
BV-202
FT
222
CD-203
MV-204
IV-214
IV-215
P--208-080-100-S6-H
Drawing Notes:
1. Over-pressure control:
- At 157.5 kPa (1.05x max
operating pressure), PAH sounds
and cooling water to condenser
HX-201 is increased by PIC-205
through PV-205.
- At 165 kPa (1.1x max operating
pressure), PAHH sounds and
independent Safety
Instrumented System (SIS-206)
opens SV-206 to discharge
vapour to containment.
- At 180 kPa (1.2x max operating
pressure, design pressure),
pressure relief valve RV-201
opens.
2. CT-210 uses a pH probe to
measure hydrogen ion
concentration in top product of
column to adjust flow rate of
NaOH to neutraliser through
PLC 210 and PV-210.
3. Stream from D-201 is directed
to ideal tray position (one of the
3 nozzles on tray 7, 9 and 11 determined upon operation).
4. TX-215 calculates average
column temperature to adjust
flow rate of steam into reboiler
and control boilup flow rate.
5. Flooding control:
- LT-221 measures liquid level in
column and adjusts liquid flow
out of reboiler through PV-221
to prevent flooding.
- Independent Safety
Instrumented System (SIS-220)
opens solenoid valve SV-220 to
prevent large liquid
accumulation in bottom of
column
150x200
General Notes:
1. All pressures are absolute
2. All pressure relief valves are
spring loaded relief valves
3. SIS also have ESD functions
FURFRONT ENGINEERING
P-211-080-600-S6-H
IV-207 MV-202
DV-201
Note 2
TT
211
PT
205
ADC-201
PV-204 IV-202
PI
207
To Condenser HX-201
FC
IV-201
PT
207
DV-204
M3
IV-205
IV-204
LIC
204
LAH/L
CV-201
To Vapour Containment
DV-202
Operating Conditions:
Operating temperature: 80.0-111.2 C
P-209-080-250-S6-P
CODE
ADC-201
DATE
LOCATION
SPAIN
1.0000:1.0
000
6/10/2014
DWG NO
REV
311406-P&ID-2
21
SHEET
1.0000 OF 1