Sie sind auf Seite 1von 3

Camille & Reina

Camille & Reina


Shayne
Shayne
Ica
Camille
Shayne
Ica
Ica

CHAPTER 4 Sample feasib


1. Technical objectives
2. Location/project site
3. Production/technical process
4. Costing
5. production handling design
6. project layout
7. plant size or production schedule
8. equipments and instruments
8. Standard operting procedures
9. wastes and waste disposal method

address; positive characteristi


flow of the production (Story te
see table
How the materials are received
address; total area; parts of th
Capacity and relevange range
Story telling lang uli about sa p
Kwento mo yung ginawa ni ne
stablish entity's concern about

ddress; positive characteristics; project site area; near establishments (market); near establishment (supplie
ow of the production (Story telling); Flow of production (Flowchart
ee table
ow the materials are received; Control procedures; Packaging picture ang function of it
ddress; total area; parts of the office and its functions ; parts of the mobile and functions
apacity and relevange range
tory telling lang uli about sa process ng bidding; yung mga naging considerations natin kung bakit iyon na a
wento mo yung ginawa ni nep
tablish entity's concern about sa environmet; Story telling again tungkol sa paano tayo nagdidispose ng wast

stablishment (suppliers) head office; reason why choose

ns
kung bakit iyon na ang napili natin; List of PPE

nagdidispose ng waste;

Das könnte Ihnen auch gefallen