MATERIAL RECEIVING PROCEDURE


Project

KINOA 4307

Company

NAVTECH KELOA/KINOA INVESTMENT S.A

Contractor

PT. UNITED SINDO PERKASA

Document no

USP-NC-MRP-005

Document revision
status

Rev

For Submission

Date

Description

QA

Project
Manager

ABS

Client

Prepared

Reviewed

Reviewed

Approved

KINOA 4307 ACCOMMODATION SERVICE


PLATFORM
PT UNITED SINDO PERKASA

Document Number

Document Title

USP-NC-MRP-005

MATERIAL RECEIVING PROCEDURE

TABLE OF CONTENTS

1.

Scope

2.

Purpose

3.

Reference Document

4.

Responsibility

5.

4.1

Store Supervisor

4.2

QC Inspector/Store Keeper (Store Department)

4.3

Project Management Team

Procedure
5.1.

General

5.2.

Receiving Inspection

5.3.

Review of Certification Document

6.

Non-conformance items control.

7.

Release of Accepted Material


7.1

Attachment Material Receiving Report

Page

2 of 7

Rev

Date

13 MAR 2010

KINOA 4307 ACCOMMODATION SERVICE


PLATFORM
PT UNITED SINDO PERKASA

Document Number

Document Title

USP-NC-MRP-005

MATERIAL RECEIVING PROCEDURE

Page

3 of 7

Rev

Date

13 MAR 2010

1. Scope
This procedure describes the inspection scope, inspection item and documentation result and the
non-conforming item control for the incoming material plate, piping, profile, and bulb plate at PT
USP
2

Purpose
This procedure is to ensure that the materials are received in accordance with the requirements of
The Purchase Order Specification & Client Specification.

3. Reference Documents

Client Specification

Materials Certificate

Class Regulation

Inspection & Test Plan

4. Responsibility
4.1

Store Supervisor
Responsible for the following tasks,

4.2

1.

Receive the information of material delivery from vendors.

2.

Visual inspection of the box package quantity that delivered, and put notice on the
delivery order if found non conformity.

3.

Put a stamp and date of inspection on the delivery order as legalization.

QC Inspector/Store Keeper (Store Department).


Responsible for the following tasks:

1. Identification and inspection of the received materials, preparation of MRR (Material


Receiving Report).
2. Storage of the materials according to the kind of materials.

3. Release the accepted materials to Relevant Department/User.


4. Segregation of the non-conforming materials.
5. Documentation of the inspection result.
6. Conservation, preservation, safe & secure storage.

KINOA 4307 ACCOMMODATION SERVICE


PLATFORM
PT UNITED SINDO PERKASA

Document Number

Document Title

USP-NC-MRP-005

MATERIAL RECEIVING PROCEDURE

4.3

Page

4 of 7

Rev

Date

13 MAR 2010

Project Management Team


Responsible for the following tasks,
1.

Control of material delivery release status and schedule.

2.

Expediting of all materials, equipment and service.

3.

Summary of material received per discipline, and updating

5. Procedure
5.1

General
The receiving inspection shall carry out before material release for fabrication or
installation. It shall be carried-out within the designated area or quarantine area. Material
shall only be moved to the designated storage areas after completion of the inspection
procedure.
The Preservation of the equipment shall carry out in accordance with equipment
preservation procedure.
QA/QC Inspector and Store Keeper shall check items quantities and visual condition plus
nominal sizes plate dimension & thickness tubular nominal sizes/diameter, overall length
against shipping documents. For ease to classify and identify material plate by thickness
and Grade specification both party may apply coloring code as follows:

KINOA 4307 ACCOMMODATION SERVICE


PLATFORM
PT UNITED SINDO PERKASA

Document Number

Document Title

USP-NC-MRP-005

MATERIAL RECEIVING PROCEDURE

Page

5 of 7

Rev

Date

13 MAR 2010

1 : PROJECT IDENTIFICATION: WHITE (KINOA)


2 : MATERIAL GRADE

WHITE

MILD STEEL
(GRADE A,B,D,E)

RED

SPECIAL GRADE
(GRADE AH,EH)

For 3 , 4, 5 will be as follows:

One Strip Green

: Material thickness 5 mm

Two Strip Green

: Material thickness 6 mm

Three Strip Green

: Material thickness 6.5 mm

One Strip Yellow

: Material thickness 8 mm

Two Strip Yellow

: Material thickness 9 mm

Three Strip Yellow

: Material thickness 9.5 mm

One Strip Blue

: Material thickness 10 mm

Two Strip Blue

: Material thickness 12 mm

Three Strip Blue

: Material thickness 12.5 mm

Two Strip Green One Strip Blue

: Material thickness 15 mm

Two Strip Yellow One Strip Blue

: Material thickness 19 mm

Two Strip Blue One Strip Green

: Material thickness 20 mm

Two Strip Blue One Strip Yellow

: Material thickness 22 mm

Two Strip Blue One Strip White

: Material thickness 25 mm

Two Strip Blue One Strip Red

: Material thickness 30 mm

KINOA 4307 ACCOMMODATION SERVICE


PLATFORM
PT UNITED SINDO PERKASA

Document Number

Document Title

USP-NC-MRP-005

MATERIAL RECEIVING PROCEDURE

5.2

Page

6 of 7

Rev

Date

13 MAR 2010

Receiving Inspection
The inspection method and stage shall be as follow,
Store Supervisor shall check the material requirement, quantity to POR, vendor invoice
Material arrives, and input the arrival result to the material receiving status sheet.

5.3

Review of Certification Document


All material certificate, inspection reports and other essential certification, certificate
dossier and manufacturing dossier shall reviewed by the QA/QC Inspector against the
requirements of the Purchase Order Specification and Client Specification, and obtain the
approval of class or drawings as required.

6. Non-Conformance Items Control


Any non-conforming materials found during receiving inspection shall be segregated in the
appropriate area and identified with hold label as appropriate.
7. Release of Accepted Material
When the receiving inspection is completed and accepted by all parties, Store Dept shall register
the accepted material.
7.1

Attachment Material Receiving Report ( see next page )

KINOA 4307 ACCOMMODATION SERVICE


PLATFORM
PT UNITED SINDO PERKASA

Document Number

Document Title

USP-NC-MRP-005

MATERIAL RECEIVING PROCEDURE

Page

7 of 7

Rev

Date

13 MAR 2010

Das könnte Ihnen auch gefallen