EMPRESA: CONSTRUCTORA DE LANOY

NOMBRE TRABAJADOR:
SALARIO
DIAS TRABAJADOS
VALOR H.O.
VALOR DIA

CANTIDAD DE HORAS

RA DE LANOY

PROYECTO: EDIFICIO SOFIA

CUADRILLA
$2,100,000

VALOR

60

REND. M2 X HORAS

M2

$7,529

1.88

$8,750
$70,000

CANT

450

MES
MES 1
MES 2

TOTAL DE HORAS
VALOR A PAGAR

M2 X MES H.O

ICIO SOFIA

AUX. TRANSP.
REND

PRIMAS

M2 X DIA

15
VALOR DIA PROM.

$ 90,781

$453,725
H.E. (25%)

H.E.N.(75%)

$10,938

$15,313

24
27

24
21

51

45

$ 557,813

$689,063

CESANTIAS

INTERESES DE
CESANTIAS(12%)

VACACIONES(4.17
%)

SALUD(4%)

$453,725

$54,447

$227,135

$462,984

H.E.D.F.
H.E.N.F.
(75%+25%)

(2 X50% HO.)

H.O.N.
(35%)

H.O.F.
(75%)

$17,500

$21,875

$3,063

$6,563

$0

$0

$0

$0

PENSION(4%)

$653,625
H.N.F.
(75%HO.+35%RN.)

ARL (TIPO V)

TOTAL PRESTACIONES

$ 379,103

$2,684,743

TOTAL H

TOTAL H.E

EXTAS

VALOR REC.

$8,859

48
48
0

$630,000
$616,875
$0

$0

$ 1,246,875
TOTAL

$ 1,246,875

TOTAL M2
H.E

90
90
0

TOTAL M2
MES

X
VALOR MES + RECARGO

540
540

$2,730,000
$2,716,875

180

1080

TOTAL SALARIO MAS PRESTACIONES

$ 8,131,618

$ 5,446,875