Sie sind auf Seite 1von 89

NTPC LTD.

TALCHER SUPER THERMAL POWER PROJECT


Recommissioning Report Of

UNIT - 6

Annual Overhauling
(From 23-05-08 to 18-06-08) 27 Days

TSTPP , STAGE II UNITS


(4X500 MW)
Compiled By
Recommissioning Group .
Operation Department

Date 22/11/2008

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

INDEX
SL.
NO.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.

18.

SUBJECT
Introduction
Overhauling Team
History of Unit - 3 & Stage II Units
Recommissioning Milestone Activities .
Different Protocols & check lists used on Boiler /TG /Elect
systems
Modifications & Improvements during Overhauling
Major Problems EXPERIENCED during Recommissioning.
Surprises & Learnings
New methods & Procedures adopted
SUGGESTIONS FOR IMPROVEMENT.
Important EVENTS.
Joint Inspections Carried Out (BLR /TG/ELECT)
Joint Testing carried (BLR /TG/ELECT)
P&I check DETAILS.
Elect Switchgear & Battery Chargers OVERHAULING DETAILS
Major Pending JOBS after overhauling.
Major activities details
a. TG Set barring gear stop activity
b. H2 purging out before start of overhauling
c. H2 Filling after overhauling
d. Generator Air tightness test
e. Condenser Flood Test
f. Boiler Hydrotest
g. MOT Draining & refilling
h. Boiler Safety Valve Floating Parameters
i. Furnace Pressurization test
Others
BOILER COOLING DOWN PARAMETERS .
TURBINE COOLING DOWN PARAMETERS FROM
BARRING GEAR TO ZERO SPEED ( SHEET 1& 2) .
Unit parameters before & after overhaul
Turbovisory parameters Before & after OH .
Boiler Safety valve Floating all parameters hourly basis
CW Pump BFV Opening / Closing Timings
Gen air leak test Parameters

Compiled By Recommissioning Group

PAGE NO
5 -7
9
11
13-14
16-17
19-21
23
25
27
29
31-35
37-39
41
43
44-48
50
52-53
54
55
56
57
58-59
60
61
62
64-66
67-69
71-79
81-82
83-87
88
89

Page 3

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

INTRODUCTION

Compiled By Recommissioning Group

Page 4

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

INTRODUCTION
The 1st major annual subsequent to the short shut down for exciter replacement during overhaul
of Unit # 6 was commenced on 23/05/2008 after the Unit was desynchronized at 14:00 Hrs after emptying 9
bunkers except H .Prior to stopping the unit the ATT for safety devices were carried out . Oil injection test was
carried out at 150 MW from Local . The unit was re-synchronized on 18-06-08 at 23:39 hrs (27 days) after
completing all electrical testing & one RHS MS safety valve (SV-8) actual floating . Major activities carried out
during the overhauling are as follows
Area Boiler & ash handling
Coal bunkers inspection and joints strengthening done as per requirement.
One pair coils each from extreme left & right sides of LTSH, Economiser upper, middle and lower banks
lifted for through inspection and tube thickness survey. Repairing of eroded tube, shields and clamps
done. Dislodged coils in RH front panel put back to its place.
Welding of 829 joints (WW-58%, LTSH 18% , Eco 12 %, others 12 % ) done with radiography of
95% joints.
RH tubes internal oxide layer thickness measurement done, no abnormality found.
Additional thermocouples installed in RH outlet tubes inside pent house as per list provided by COS.
Substitution of angles done at coal burner tips for deflector plates removed earlier
Servicing of 6 drum safety valves, 2 MS safety valves and 1 MS ERV done.
APH baskets cleaned with HP water jet and damaged seals replaced
Damaged NMEJ s in PAPH A&B replaced, eroded duct portions repaired
Inspection of Fan blades and servicing of servomotors done
ESP internals cleaning and repairing done
Complete replacement of coal & oil burners
Removal of deflector plate from the coal nozzles
HP water Jet cleaning for APH Baskets
Furnace cleaning
FA system modifications

Compiled By Recommissioning Group

Page 5

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Area TG & auxiliaries


TG bearings DPT & UT done , no abnormality found
LPBP SV, HP and IP SV & CV servicing done. HPCV-2 was not opening beyond 88%. Pilot valve
cleaning and valves characteristic checking done
Control fluid replaced
Servicing of Governing system components
Catenary correction done and reference point generated in TG spring deck for monitoring of any
expansion.
No rotor lifting observed at bearings 1,2 & 5. Corrected by cleaning JOP packet holes
Pocket cutting done in TG front bearings pedestal as suggested by BHEL in order to prevent oil
accumulation.
Parting plane leakage in HPH-6A rectified.
Condenser flood test done and identified air ingress points attended.
Passing High energy drain serviced / replaced.
Condenser HP Bullet Cleaning
TD BFP cartridge work .
AREA : Generator and auxiliaries
Generator Rotor Threaded out .
Generator terminal bushing inspection done
CC bolt leakages checking Generator rotor found OK , exciter rotor leakage attended
Generator wedge deflection, ELCID test, DP/UT of retaining ring done.
One locking shoe of turbine end overhang of generator had come off-repaired.
Air gap seal ring clamp welding failure detected re-welding done.
Dents found in 1st stage fixed blades of compressor of Generator. Damaged blades replaced/
AREA : Electrical / C&I Area
XFMR OH checks
GT OH works /inspections
Switchgear, HT/LT Motors and Motorized Actuators servicing done.
Battery capacity done
Testing & Calibration of field instruments carried out.
DCDB overhaul one section

Compiled By Recommissioning Group

Page 6

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

AREA :OFFSITE
Cold basin cleaning
CW duct draining & inspection of CW valves
AREA : ESP & Ash Handling
Bottom Ash & Fly handling systems inspected a& repaired.
Still air charging of ESP Fields
Being the 1st annual overhauling of the Unit, many deficiencies in the system were identified & they were
attended. Some modifications were carried out for improving the reliability & safety of the unit as described in the
following sections. Some modifications are still required for better operation & maintenance aspects

which are

recorded. Most important among them is the Comprehensive checking of protections, inter locks & alarms of the
equipment's were carried out . Testing for Actual Over speed Test of TDBFP A/B ( 24 th May 08) , ATT for safety
devices & Valves after synchronization carried out . All the electrical SWGR remote operation check was carried
out successfully . Recommissioning activities were carried out under the supervision of Shri R.N.Das Sr. Supdt
(Oprn) & under the guidance of Shri S. Bandhyppadhya DGM (O) and Shri D Sarkar AGM (O ) .

( R.N.Das )
Sr Supdt(O)
Recom Team Leader

Compiled By Recommissioning Group

Page 7

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

OVERHAULING TEAM

Compiled By Recommissioning Group

Page 8

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

UNIT # 6
OVERHAULING TEAM
Sl. No.

Name

Group

Designation

1.

Sh. R. N. Das

Gen

Sr. Supdt. ( Team leader )

2.

Sh V.Mohan

Sr. Supdt. ( Dy Leader )

3.

Sh K.Ch Satyanarayana

Supdt (O)

4.

Sh.SS Mahallick

Sr. Engr.,

5.

Sh.Abdus Salam

Sr. Engr.

6.

Sh P.K Chourasia

Sr Engr

7.

Sh P.Naga Suresh

Sr .Engr.

8.

Sh P. Ramesh

Engr .

9.

Sh KSR Krishna Kumar

Engr.

10.

Sh N C Murmu

Gen

Sr Asst Controller (O)

11.

Sh G pradhan

Operator,(Elect)

12.

Sh A. Prusty

Operator,(Elect)

13.

Sh NK.Sahoo

Operator,(Elect)

14.

Sh P.C Pani

Operator, (Elect)

15.

Sh A.K Sahoo

Operator,( TG)

16.

Sh Nekuri Pradhan

Operator, (TG)

17.

Sh Golekh Sahoo

Operator, (TG)

18.

Sh D. Roul

Operator,(Blr)

19.

Sh S.K Pani

Operator,(Blr)

Compiled By Recommissioning Group

Page 9

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

HISTORY OF THE UNIT

Compiled By Recommissioning Group

Page 10

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

TALCHER SUPER THERMAL POWER STATION


STAGE II (4 x 500 MW)

HISTORY OF STAGE- II UNITS

Description.

Unit # 4

Unit # 5

May03
05.07.03
2 Months
Sept03
25.10.03
47 months 23
days
19.11.03

Nov03
18.01.04
2 months
Mar04
13.05.04
54 months 10
days
14.06.04

39 months 17
days

48 months
16 days

55 months
11 days

64 months
27 days

Delay w.r.t MNW

3 months
17 days

2 months
16 days

3 months 11
days

6 months 27
days

BLU to synchronization in oil ( in no of


days )

115

112

115

132

Synch to coal firing( in no of days )

45

25

32

52

Synch with Coal

BLU

Unit # 3

MNW
ACTUAL
Delay(approx)
MNW
With oil

Jul02
11.09.02
2 Months
3rd Nov 02
04.01.03

No of months from 0 date


With coal

20.02.03

No of months from 0 date

Full load achieved

38 months 1 day

26.03.03

14.01.04

21.08.04

Unit # 6
May04
27.09.04
4 months
Sept04
06.02.05
63 months 3
days
30.03.05

08.07.05

BLU to full load


( in no of days )

196

193

215

284

Synch to full load

81

81

100

152
17-05-06 to30-05-06
12 days

Last short Overhauls


TRIAL OPEARTION OF THE UNITS
Description
As per MNW
Start
Trial
Complete
operation
Duration
Delay w.r.t MNW
BLU to T O Completion .
( in no of days )
Compiled By Recommissioning Group

Unit # 3

Unit # 4

Unit # 5

Unit # 6

FEB03
02. 07. 03
16. 07. 03
14 days
5 months

DEC03
29. 01. 04
19. 02 .04
21 days
2 months

JUN04
14.08.04
28.08.04
15 days
2months

DEC04
08.07.05
30.07.05
22 days
7 months

306

229

222

306

Page 11

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Various Protocols &


Recommissioning Check
Lists Used

Compiled By Recommissioning Group

Page 12

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

VARIOUS PROTOCOLS USED


Sl no

DESCRIPTION

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.

BOILER SIDE PROTOCOLS


BURNER VALVES PASSING CHECK
PROTOCOL ( CHECKED EARLIER )
BOILER EXPANSION INDICATOR
FIXING
BOILER EXPANSIONS READINGS AT
VARIOUS LOADS
BOILER DRUM INTERNAL INSPECTION
PROTOCOL
IGNITOR/SCANNER/OIL GUN CHECKS
FROM INSIDE .
BURNER TILT REMOTE CHECK
PROTOCOL
BURNER TILT INSIDE CHECK
PROTOCOL
SADC CHECKS LOCAL /REMOTE
PROTOCOL
APH WATER WASHING PROTOCOL
APH WATER WASH NOZZLE CHECK
APH OIL CARRYOVER PROBE
AVAILABILITY
APH AUXILIARIES AVAILABILITY
CHECK
AIR MOTOR AUTO START CHECK
APH CLEANILINESS CHECK
APH SOOT BLOWER CHECK
APH FIRE ALARM CHECK
FURNACE WALL CLEANLINESS
FURNACE AIR TIGHTNESS TEST
OIL GUN / IGNITER READINESS CHECK
WALL BLOWER NOZZLE CHECK
FROM INSIDE
WINDBOX AIR TIGHTNESS TEST
SECONDARY AIR DUCT FROM FD FAN
DISCAHRGE TO APH INLET
SECONDARY AIR DUCT FROM APH
OUTLET TO WINDBOX
PRIMARY AIR DUCT FROM PA FAN
DISCAHRGE TO APH INLET
PRIMARY AIR DUCT FROM APH
OUTLET TO MILL INLET
FG DUCT FROM ECONOMISER OULET
TO APH INLET
FG DUCT FROM APH OUTLET TO ESP
INLET
FG DUCT ESP OUTLET TO CHIMNEY
INLET

Compiled By Recommissioning Group

STATUS

Sl no
29.
30.

DESCRIPTION
PRIMARY AIR DUCT TO MILLS LHS
PRIMARY AIR DUCT TO MILLS RHS

31.

ACTUAL SAFETY VALVE FLOATING


STILL AIR CHARGING OF ESP PASS
A/B/C/D PROTOCOL

32.

STATUS

43.
44.
45.

TG SIDE PROTOCOLS
MAIN TURBINE ACTUAL OVER SPEED
TEST PROTOCOL
TDBFP A ACTUAL OVER SPEED
TEST PROTOCOL
TDBFP B ACTUAL OVER SPEED
TEST PROTOCOL
GENERATOR H2 PURGEOUT
HOTWELL INTERNAL INSPECTION
PROTOCOL
FST & D/A INTERNAL INSPECTION
PROTOCOL
SDFT/UFT/LPFT/HPFT INTERNAL
INSPECTION PROTOCOL
CONDNSER WATER BOX INSPECTION
WITH OLTC SCREEN
ATT F FOR SAFETY DEVICES
CHECKING PROTOCOL
ATT FOR VALVES CHECKING
PROTOCOL
TG GOV CHARECTERISTICS
LPBP EHC CHARECTERISTIC
TDBFP A/B EHC CHARECTERISTIC

46.
47.
48.
49.

MOT INSPECTION
TDBFP EXHAUST VALVES CHECKS
GENERATOR AIR TIGHTNESS TEST
PRIMARY WATER FLOW ADJUSTMENT

33.
34.
35.
36.
37.
38.
39.
40.
41.
42.

50.
51.
52.
53.
54.
55.
56.

ELECTRICAL SIDE PROTOCOLS


GENERATOR REALY TESTING
GT/UT PROTECTIONS & INTERLOCKS
DG SET & SWGR BREAKERS
PROTOCOLS FOR TRANSFORMERS
PROTOCOLS FOR GENERAL
CHECKINGS OF MCC / SWGRS
PROTOCOLS FOR MOTOR TB
INSPECTION
MULSIFIERS CHECKINGS

Page 13

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Details of Recommissioning check Lists Followed


During Annual Overhaul
Sl
no
AA
1.
BB
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
C
1.
2.
3.
DD
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

Check list details


GENERAL
Unit Integrated Startup check list after Annual
Overhaul ( Separate Book)
(Blr/TG/Elect/Off/ESP/Ash/ESP/OFF Site etc )
BOILER system.
Boiler Force Cooling check list
APH water washing check list
Boiler 1st pass internal water washing check
Boiler 2nd pass internal water washing check
Furnace pressurization test .
FG duct inspection details
Boiler Hyd Test Valves readiness check list
Boiler Hydraulic Test check list
ID Fan A/B
FD fan A/B
PA Fan A/B
SAPH A/B
PAPH A/B
BCW pumps A/B/C system
SA Duct checking details
PA Duct checking details
FG Duct checking details
Hopper Inspection details
Mill isolation details
Mills A-K recommissioning status / readiness.
Feeders A-K recommissioning status / readiness.
HFO/LDO oil system at 17 Mtr.
Burner front checks
SH/RH Spray system
Mill seal air system
AC/DC Scanner air fans
LDO/HFO Nozzle valve passing test.
ESP & ASH Handling system
BA system check list
FA system check list
ESP pass A / B / C /D Check List
TG system
TG actual Over speed test
TDBFP A/B Actual Over Speed Test
ATT for safety Devices
ATT for Valves
Condenser Vacuum Killing
Turbine Force Cooling
Condenser Flood Test
SG/TG ECW System with Chemical Dosing
System
DM Makeup /Emergency Make up water system
CEP A/B/C isolation / Normalization
Condensate System
MDBFP C isolation /Normalization

Compiled By Recommissioning Group

Status

Sl
no
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
EE
1.
2.
3.
4.
FF
1.
2.
3.
1.
2.
3.
4.
5.
6.
7.
8.
9.

Check list details

Status

TDBFP A/B isolation /normalization


TDBFP centrifuges.
Deaerator
LP/HP Feed Water Heaters
TG Lub /Jacking oil system shutdown checks
MOT filling
Main oil Centrifuge .
Main TG Lub oil system line up checks including
auxiliaries
Check List for TG Lub Oil system Flushing
Putting TG set on barring gear
Condenser vacuum pulling.
Stator water system
Gen air tightness test .
H2 Gas system filling (Air purge out with CO2 &
CO2 Purge out with H2 & H2 pressurization .)
Seal oil system
HP BP System
TG set Rolling Preparation
TG set Rolling
OFFSITE SYSTEM
CST line up checks
CW Pump isolation & normalization
CW duct draining & charging
CT Isolation & normalization

NA

Electrical system

HT SWGRS (11 KV/3.3 kv)


UA SWGR Unit - 3
UB SWGR Unit - 3
UAA SWGR Unit - 3

LT SWGRS TG SIDE
USS SEC A/B
SSS SEC A/B
TMCC SEC A/B
TACDB SEC A/B
UES
TVDC

LT SWGRS SG SIDE
BLR MCC SEC A/B
COAL MILL MCC SEC A/B
BACDB SEC A/B

Page 14

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

RECOMMISSIONING
HIGHLIGHTS

Compiled By Recommissioning Group

Page 15

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

UNIT- 6 RECOMMISSIONING HIGHLIGHTS


1st Annual Overhaul.
(23 -05 - 08 to 18 06 - 08) 27 days

Sl
no
1.

7.

Description of the
milestone activity
Unit Stopped
Barring Gear Stopping & Lub
Oil system
Internal Hydro test
External Hydro
Condenser Flood test
TG lub Oil Flushing
completion
TG put on barring gear

8.

Furnace air tightness test

9.

Boiler Light Up

26
1&
26
26

10.

Safety Valve Floating

27

18/06/08

27

18-06-2008

27

18-06-2008

At 16:02hrs

27
27

18-06-2008
18-06-2008

At 20 :30 Hrs
At 20 :40 hrs -20 :55 Hrs
At 21:15 Hrs ( OS trip test device
MCC problem)
At 21 : 41 Hrs To observe the
coasting Down Vibration & Brng
pedestal Vibration
Speed raised after 254 RPM , kept
at 360 for some time & then raised
to 3000 RPM reached 23:05
23:39 hrs after Excitation Testing
Could not be achieved as per
normal ramp up of the Unit due to
coal feeding problem.

2.
3.
4.
5.
6.

No of days
aft S/D
0

Actual date

Remarks

23-05-2008

At 14:00 Hrs

29-05-2008

At 11:20 hrs

19
20
15

11-06-08
12-06-08
08/06/08

At 15:30 Hrs , 220 ksc


At 1
At 20:00hrs

26

17/06/08

At 11:00hrs

17/06/08
23/06/08&
17/06/08
17/06/08

At 11:40hrs
At 16:52hrs
At 01:30hrs
At 14:47hrs
At 03:38hrs, MS SV-8 actual floating
was done at 186.26ksc.
After Steam Purity < 20 ppb
At 11:30hrs

13.
14.

TG set 1st Rolling to 360 RPM


for soaking
TG set 1st Rolling to 3000
RPM for Electrical testing
Electrical testing
ATT testing

15.

Local Oil Injection Test

27

18-06-2008

16.

Turbine Hand Trip

27

18-06-2008

17.

Final TG set Rolling for


synchronization

27

18-06-2008

18.

Unit Synchronization

27

18-06-2008

19.

Full Load Operation

11.
12.

Because of coal feeding problem the Unit full load operation could not be
achieved as per normal ramp up of the Unit .

Compiled By Recommissioning Group

Page 16

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

UNIT- 6 RECOMMISSIONING ACTIVITIES.


Sl
no
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.

Description of the activities

17/06/08
17/06/08
18/06/08

Start
Time in
Hrs
14:47
23:45
1:00

18/06/08

3: 20

18/06/08

03:38

18/06/08

03:38

18/06/08

6:05 Hrs

18/06/08

11:20hrs

11:30hrs

18/06/08
18/06/08

15:55hrs

16:02hrs
20:20

6 min
4 Hrs

18/06/08

20:40

20:55

15 Min

18/06/08

21:42

18/06/08

23:39

Date

BLU ( Boiler Light Up)


100 Ksc Pressure reached
Pressure rising to 160
Treavy test Completed for all 8
valves at 150 ksc + Popping of
MS & / HRH ERVs
Pressure raised to 186 ksc for
actual Safety valve floating one
number
Parameter reduction
Achieving Rolling parameters
including steam Purity
TG speed raised to 360 rpm &
soaking at 360 RPM for achieving
X6 Criteria
Raising TG speed to 3000 rpm
Elect. Testing
ATT for Safety Devices at 3000
RPM
Turbine Hand Trip
TG set rolling to 360 rpm &
Raising to 3000 RPM & Voltage
Checking in Ch 1 & 2 & Unit
synchronization

16:20

Complete
Time in
Hrs

Duration
in Hrs

Cumulative
Time in Hrs

Last overhauls total time from BLU to Synchronization

U-5 Overhaul (June 06)


U-4 Overhaul (Dec 06)
U-3 overhaul ( August07)
U-6 Overhaul ( June 08 )

Compiled By Recommissioning Group

=
=
=
=

28:34 Hrs
32: 24 Hrs
27:24 Hrs
32:52 Hrs , Only MS safety valves actually floated

Page 17

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

MODIFICATIONS /
IMPROVEMENTS CARRIED OUT

Compiled By Recommissioning Group

Page 18

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

MODIFICATIONS /IMPROVEMENTS CARRIED OUT


DURING ANNUAL OVERHAULING
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

19.
20.
21.
22.
23.
24.
25.
26.

Area : Boiler & Auxiliaries


PA.header pr. Low to mill tripping 2/3 modification (instead of 1/2)
P-13 24v supply fault alarm provided in LVS
Mill SA/bowl DP low alarm provided in facia
Top mill trip runback 1st mill instantaneous , followed by next mill after2 sec till 5 mill operation
Introducing SBC temp permissive at 270 dec with 20m time delay
DC scanner fan running alarm provided in LVS
MFT discrepancy alarm provided in LVS
Any BIG not open to mill tripping time delay (15 m ) introduced
Top mill trip from any PA fan tripping runback modification
All id fan to MFT tripping 2 sec time delay introduced
Mill protections bypassing for trial run from HMI introduced
Mills LOP changeover logic modification
Feeder control supply provided from UPS .
Mills first out logic provided .
All coal burners shield plate were cut as per recommendation of OS .
PA/FD fan suction Hood were extended & approach platforms are provided for cleaning .
Additional thermocouples are installed in RH Coil 70 in addition to the existing ones . Points are
available at local .
The following steps were taken for early silica stabilization in the Unit .
Complete cleaning & flushing of hot well.
CEP suction header draining & flushing keeping the suction strainer open
Deaerator hot draining after Hyd Test , cleaning , flushing
Complete Draining of boiler after hydro test .
Hot blow off from Bottom Ring header carried out at 10 ksc pressure
Complete Operation checking carried out for all 4 FG inlet dampers to APH & LS adjustment done
at full open/close position . Afterwards they are selected in Maint Mode to avoid inadvertent
operation .
All ESP Inlet /Outlet & other gates LS adjustment were carried out in Open & close position
All 4 eco bypass gates remote operation were checked & finally at full close position their power
supply is kept off .
Additional pockets ( 4 nos on each side LHS/RHS) for thermocouples mounting are provided in
the common FG duct to ESP inlet on LHS/RHS on the duct top portion .
Ladders are provided in wind box for inspection of SADC from inside .
Bunker level indication were provided in Fuel Overview Page for operational flexibility
All bracings in FG duct are provided with sacrificing angles to reduce erosion on main bracing
members .
All 10 bunkers external welding inspection through DP test & repair carried out .

Compiled By Recommissioning Group

Page 19

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Area : Turbine & Auxiliaries


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

RADAR type level transmitter installed for MOT level measurement.


One second delay introduced in Fire protection push button 1 &2
LPBP sliding set point characteristic changed as per the new curve. 45.85 KSC ( AS PER OS )
Gen Aux. logics modification done
Power supply scheme of CJJ-05/06 modified for redundancy
Trip related switches in CEP,TDBFP & Main TG replaced with reliable imported switches.
DC SOP logic modification for "Genrerator on purge" condition.(VPC implemented)
Remote indication of TDBFP lub oil tank level provided
Remote indication of vacuum pump suction & ejector valve limit switch.
HPT evacuation line MTM thermocouple fixed & measurement provided in UCB
LPBP trip to manual LVS alarm provided.
Pocket cutting done in TG front bearing pedestal as suggested by BHEL in order to prevent oil
accumulation
CFP 1 & 2 Fault indication on Module isolation was not appearing , attended by EMD / C&I .
Actual Over speed test of TDBFP- A was carried out on 24/05/08 , the acting speed was 5986
RPM . Oil injection test was carried out at 5000 RPM .
Actual Over speed test of TDBFP- B was carried out on 24/05/08 , the acting speed was 5876 RPM
. Oil injection test was carried out at 5000 RPM .
ATT for safety devices carried out successfully on load before Unit shutdown at 150 MW load
.However while carrying out after rolling to 3000 RPM problem experienced with OS Motor Module
. To be checked .
HPBP OSU modification was carried out by TMD for easy of maintenance .

19.

During boiler hydro-test the temp. of MDBFP Main Pump Thrust Bearing was maintained low by
maintaining FST temp < 85 0 C . This was possible by taking fresh makeup to D/A on continues
basis
TG ve Mtr below flash box area was cleaned thoroughly .

20.

Approaches in various areas of TG side were provided like near Gov Rack , etc

21.

Oil Canal permanent lighting provided .

22.

APRDS graphic page is modified as per the existing scheme .


Area : Electrical

23.

All description corrections were made in 11 kv UA/UB swgr .

24.

Staggering of power supply to coal feeders in alternate way i.e. coal feeders ACEGJ from Section-A and
BDFHK from Section-B of Boiler ACDB done

Compiled By Recommissioning Group

Page 20

NTPC /TSTPS

25.
26.

Annual Overhauling Report U 6


23rd May08 to 18rd June08

All SWGRs incoming breaker remote operation were made through , Changeover through TSS
was checked & made available for all SWGRs .
Equipment Power supplies are changed to different feeders for improving reliability
Equipment
Primary water
pump-A
TDBFP-A
Centrifuge
TDBFP-B AOP-1
CST pump
Feeder-B
Feeder-G
Feeder-D
Feeder-J
Battery charger-1

From

28.

Equipment

3 phase supply
rearranged as follows

11.18F/TMCC
Sec-B

2.18R/TMCC Sec-A

Feeder-A

BACDB Sec-A 1R-B

2.18R/TMCC

2.8R/USS Sec-A

Feeder-C

BACDB Sec-A 1F-C

3.18R/USS Sec-A

Feeder-E

BACDB Sec-A 1F-D

10.18F/TMCC Sec-B

Feeder-G

BACDB Sec-A 1F-B

BACDB Sec-B 8F-H

Feeder-J

BACDB Sec-A 1R-C

BACDB Sec-A 1F-B

Feeder-B

BACDB Sec-B 8F-H

BACDB Sec-B 9R-C

Feeder-D

BACDB Sec-B 9R-C

BACDB Sec-A 1R-C

Feeder-F

BACDB Sec-B 8R-C

USS Sec-A

Feeder-H

BACDB Sec-B 9R-B

Feeder-K

BACDB Sec-B 9R-D

10.18F/TMCC
Sec-B
3.18R USS
Sec-A
BACDB Sec-A
1F-B
BACDB Sec-B
8F-H
BACDB Sec-A
1R-C
BACDB Sec-B
9R-C
USS Sec-B

Alternate
supply from
24V DC to ESP
24V C&I
A/C PLC
charger DCDB
1&3
Area : ESP & Ash handling
27.

To

FA system Vacuum Line Modification carried out to make independent VP & CT . In this process the
VP suction valve & AW IV were removed from the system . Double VT provided for each pass .
Eco Bypass duct total ash was evacuated through the system , thus avoiding ash dumping outside .

Compiled By Recommissioning Group

Page 21

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

MAJOR PROBLEMS DURING


RECOMMISSIONING

Compiled By Recommissioning Group

Page 22

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

MAJOR PROBLEMS EXPERIENCED


DURING RECOMMISSIONING.
AREA : BOILER & AUXILIARIES
1.
2.
3.
4.
5.
6.
7.
8.
9.

SAF A actuator was placed in reverse manner so that with fan starting it was closing & with fan
running this was closing , rectified .
Inadequacy of Fire water was experienced during simultaneous boiler washing & APH water
washing causing delay in the system .
Simultaneous work in Eco bypass duct cleaning & LTSH Zone of 2nd pass pressure parts have been
affected with dust
During APH water washing the Zero meter area got flooded as the Hopper Drains are not provided
for the above purpose .
Also the duct & other equipment are getting damaged due to falling of acidic water from the APH .
The Drain Back side of PA/FD fan is getting clogged with CHP coal as the reject chute of CHP is
just above the drain .
Hot air Common duct Ash removal was having problem as no separate system made available like
that of Eco Bypass System .
Operation of dampers at ESP inlet & outlet, ID fan inlet are unsafe as vertical ladders are not provided
with cage.
ESP field earth keys were found not available for Pass-A (E1) 2,16,17, Pass-B (E2) 7,Pass-C (E3)
1,5,6,7,9,11,12 and Pass-D (E4) 1,5,15,17
AREA : TG & AUXILIARIES

10. Generator Exciter Coolers are not having drains . TMD informed
Duct draining inlet side was not possible as ICV s were passing . Even after 4 days of draining it
was not possible .
CW outlet duct needs to be drained by loosening the dummy flanges as there is no provision of
12.
permanent drains outlet
11.

OTHERS
13. Approach to certain valves , dampers area are still to be provided . The list is enclosed .
14. Condenser - ve mtr final finishing is not done causing water & sludge accumulation .

Compiled By Recommissioning Group

Page 23

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Surprises & Learnings on


Boiler & TG systems

Compiled By Recommissioning Group

Page 24

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Surprises & Learnings on


Boiler & TG systems
SL.NO.

AREA

01

Turbine

02

Generator

03

Generator

04

Generator

05

Generator

OBSERVATION
Not rotor lifting observed at bearings 1,2 & 5. Blockage in JOP
packet holes cleared and the lift made OK.
Exciter rotor balancing weights suspected to be missing their slot.
Matched with balancing weight of the machine, found OK.
One locking shoe of turbine end overhang of generator had come
off-repaired.
Rotor 1st stage fixed blades of compressor have dents, damaged
blades replaced.
Air gap seal ring clamp welding failure detected-re welding done.
Suspected escaping of exciter rotor balancing weight after

06

Generator

investigation it was construed that the balancing weight was not


placed at the place without paint, creating false impression.

Compiled By Recommissioning Group

Page 25

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

NEW METHODS / PROCEDURES


ADOPTED DURING THIS
OVERHAUL.

Compiled By Recommissioning Group

Page 26

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

NEW METHODS / PROCEDURES ADOPTED


DURING THIS OVERHAUL.
BOILER & AUXILIARIES

Trial run of ID/FD/PA fans by opening manholes , closing APH Inlet gates /dampers , ESP Outlet gates
for ID fan .

Furnace pressurization test after 2 hrs of Boiler shutdown to identify the leakages before overhaul .
Again it was carried out after all overhaul activities were completed .

Running of one ID fan after APH water washing to facilitate smooth boiler internal water washing .

Mill clean air flow tests were carried out subsequent to Furnace pressurization test before BLU

Furnace pressurization test was carried out by running only FD fan & ESP inlet gate passing checks
were carried out by opening the manholes down stream .
TG & AUXILIARIES

During Flood test Water Filled simultaneously through all possible sources which has reduced time .

Compiled By Recommissioning Group

Page 27

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Suggestions For Further


Improvement

Compiled By Recommissioning Group

Page 28

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

SUGGESTION FOR IMPROVEMENT.


Boiler inside lighting AC/DC to be taken from the source provided by EMD . Preferably
the source can be from the other running Unit like AESWGR where the direct impact
will not be there on main plant equipments . .
Proper Approach to CT area main isolating valve & lighting to be provided to do the
necessary isolation & normalization in the Night
Proper Approach / illumination for

SW Blow-down / Chlorination Plant water line valves

near CW ICV are to be provided to carry out the operation in the Night .
Gravity draining facility for CW duct ( ref the sketch). This will reduce the drain timings of
duct to a larger extent .
Permanent power supply source for temporary dewatering pump in the Condenser pit area .
Separate Drain system for APH hopper during water washing & Eco Ash Hopper during
2nd pass water washing .
Permanent Dewatering Pump power supply source for the CT Basins from the Adjacent
Units so that Cold Basin dewatering & subsequent cleaning will not be affected when
CTMCC goes under PTW.

Compiled By Recommissioning Group

Page 29

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

IMPORTANT EVENTS

Compiled By Recommissioning Group

Page 30

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

IMPORTANT EVENTS
During Unit Annual Overhaul
AREA : BOILER

Sl.
No

Description

Day
aft
S/D

Start Of Activity
Date

Time

Completion Of
Activity

Duration in
Hrs

DATE

TIME

23/5/08

19:38

05:40

1.

Unit Shut Down for OH

23/5/08

14:00

2.

Pent House Pressurize fan kept in


service

23/5/08

20:00

3.

APH Water Washing all - 4

23/5/08

20:00

24/5/08

03:30

7:30

4.

APH Drying

24/5/08

04:00

24/5/08

10:00

06:00

5.

All BCW Pumps Stopped

24/5/08

05:44

6.

Boiler Draining

24/5/08

11:30

7.

Boiler Water washing 1st pass

24/5/08

25/06/08

8.

Goose Neck area cleaning

24/5/08

24/5/08

9.

Boiler Water washing 2nd pass

25/06/08

20:00

10.

All APH stopped after drying

24/5/08

10:00

11.

Eco Bypass Duct Hopper Ash


Removal

25/5/08

10:00

12.

Final Boiler Filling after flushing

26

17/06/08

13.

Fur Pr test By Running FD fan

1&
26

23/06/08
16:52&
&
01:30
17/06/08

14.

ID fan started

26

17/06/08

09:30

15.

PA fan started

27

18/06/08

01:08

16.

FA system started

17.

BLU

26

17/06/08

14:47

26

17/06/08

21:42

26

17/06/08

26

17/06/08

18.
19.
20.
21.

Boiler Pressure raising start to


reach 150 ksc ( 40 ksc/Hr )
Treavy test for 8 valves
( 6 drum + 2 MS Line)
MS safety valve actual floating (
SV - 8)

15:44

26/5/08

02:00

10/6/08

17:00

16 days

03:38

Pressure Reduction

Compiled By Recommissioning Group

Page 31

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

IMPORTANT EVENTS
During Unit Annual Overhaul
AREA : Turbine & auxiliaries
Sl.
No

Description

Day aft
S/D

Start Of Activity
Date

Time

Completion Of
Activity
DATE

TIME

Duratio
n in Hrs

1.

Unit Shut Down for OH

23/5/08

14:00

2.

CT FAN STOPPING ALL

23/5/08

18:00

3.

Natural Cooling Of TG SET

23/05/08

14:45

4.

MDBFP - C Stopped

24/05/08

07:00

5.

GT Taken out of service

24/05/08

12:00

6.

1st CW pump stopping

24/05/08

13:15

7.

CT 6A isolation (water side )

24/05/08

13:30

8.

H2 depressurization & H2 purge out


with CO2

24/05/08

05:30

25/05/08

08:15

15hrs

9.

CO2 purge out with Air & maintain


0.5 ksc pressure air pressure , 24
hrs venting

25/05/08

08:45

26/05/08

06:00

22hrs

10.

Vacuum Killing .

25/05/08

18:45

25/05/08

19:15

00:30

11.

Force Cooling of TG set

26/05/08

01:10

28/05/08

11:20

34

12.

APRDS isolation

26/05/08

26/05/08

10:00

13.

All CEP stopping

26/05/08

26/05/08

11:00

14.

D/A draining

26/05/08

26/05/08

12:31

15.

SG ECW system stopping

26/05/08

26/05/08

11:30

16.

Water Box Cleaning # 5 side

26/05/08

20:40

27/05/08

10:00

17.

Vacuum Pump Stopping

28/05/08

10:45

18.

CF system stopping

28/05/08

10:45

19.

Barring Gear Stopping After HPS


/HPC temp 115 0 C

28/05/08

11:20

20.

TG ECW system isolation

28/05/08

20:00

29/05/08

21.

ACW System Stopping

28/05/08

11:35

28/05/08 17:18

Compiled By Recommissioning Group

10:51

01:40

10:24

Page 32

NTPC /TSTPS

Sl.
No
22.
23.
24.

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Description
TG Lub Oil system stopping
2nd CW pump stopping ( after
alignment job was completed)
Gen conical Filter cleaning after
draining the system up to the level

Day aft
S/D

Start Of Activity
Date

Time

28/05/08

12:10

30/05/08

12:18

31/05/08

09:30

Completion Of
Activity
DATE

TIME

Duratio
n in Hrs

Jop kept in service as per


TMD requirement

25.

Water Box Cleaning # 7 side

31/05/08

13:30

26.

TG ECW system starting

12

03/06/08

19:25

For CF Flushing

27.

SG ECW system starting

13

04/06/08

20:00

P&I Check

28.

Final Hotwell draining after Flood


test

16

08/06/08

20:30

29.

SW Unit Resin Replacement

16

07/06/08

11:00

07/06/08

30.

Condenser flood test

17

08/06/08

16:30

08/06/08

20:30

4:00

31.

Final Hotwell filling after flushing

17

09/06/08

32.

Final D/A Filling after flushing

17

09/06/08

12:00

33.

1st CW Pump started

18

10/06/08

10:30

34.

MDBFP starting for Hyd test

19

11/06/08

13:45

35.

ACW System Starting

19

11/06/08

10:00

36.

CF system starting

20

12/06/08

10:00

37.

TG Lub Oil flushing

25

16/06/08

23:50

17/06/08

10:50

11:00

38.

Condensate system charging

26

17/06/08

11:25

39.

APRDS Charging

26

17/06/08

40.

Machine put On Barring Gear

26

17/06/08

11:40

17/06/08

12:20

00:30

26

17/06/08

03:00

17/06/08

15:30

12:30

26

17/06/08

16:00

18/06/08

02:00

10:00

27

18/06/08

02:00

18/06/08

05:00

03:00

41.
42.
43.

Air purging with Co2 filling till CO2


purity 98%
Co2 Purging with H2 filling till H2
purity 97-98%
H2 pressurizations after achieving
purity to 3.3 ksc

After Hotwell Flushing


After TMD clearance for APH
SB testing with steam

44.

Ready For Rolling

27

18/06/08

H2 pressure drop testing was


carried out

45.

Turbine Roll To 360 Rpm & soaking


at 360 RPM

6:00
hrs

27

18/06/08

11:30

18/06/08

Compiled By Recommissioning Group

15:55

4:25

Page 33

NTPC /TSTPS

Sl.
No

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Description

Day aft
S/D

Start Of Activity

Completion Of
Activity

Date

Time

DATE

TIME

Duratio
n in Hrs

46.

Speed raising to 3000 RPM

27

18/06/08

15:55

18/06/08

16:02

00:07

47.

Electrical testing

27

18/06/08

16:15

18/06/08

20:30

04:15

27

18/06/08

20:40

18/06/08

20:55

00:15

27

18/06/08

20:41

48.
49.

ATT for safety device after


Electrical Test
Turbine Trip after electrical testing
& ATT

(Through actuation of
electrical trip)

50.

GT Back Charge

27

18/06/08

21:00

51.

UT A/B Charged

27

18/06/08

23:30

52.

Turbine Rolling after parameter


attained to 3000 RPM

27

18/06/08

22:55

18/06/08

53.

Unit Synchronisation

27

18/06/08

23:39

After excitation system check.

54.

Load 500 MW

32

23/06/08

17:00

After Coal position improved

Compiled By Recommissioning Group

Breaker problem attended


23:02

00:07

Page 34

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

CW & COOLING TOWER OVERHAULING ACTIVITIES


Sl NO.

EQUIPMENT

JOB
DESCRIPTION

No of day after
Shutdown

DURATION
FROM

1.

CT- A

Fans stopped

23/5/08

2.

CT- B

Fans stopped

23/05/08

3.

CT- A

Water Isolation

24/05/08

4.

CT- B

Water Isolation

31/05/08

5.

CW pump -A

Stopping

23/05/08

6.

CW pump -B

Stopping

31/05/08

7.

CW pump -A

Starting

19

10/06/08

8.

CW pump -B

Starting

26

17/06/08

9.

CT- A

Water side
charging

31/05/08

10.

CT- B

Water side
charging

15

06/06/08

11.

CT- A

Fans starting

26

17/06/08

12.

CT- B

Fans starting

26

17/06/08

13.

ICV 1 / 2

Closing

24/05/08

14.

ICV 1 / 2

Opening

27

19/06/08

Compiled By Recommissioning Group

TO

Page 35

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

DETAILS OF JOINT INSPECTIONS


CARRIED OUT

Compiled By Recommissioning Group

Page 36

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

LIST OF INSPECTIONS IN BOILER SIDE


Sl no
1.
2.
3.
4.
5.
6.

Details of Check /Inspection


Drum Internal Inspection
Bottom Ring Hdr Inspection
Wall blower check from inside
Oil Nozzle v/v passing Check
FG Ducts
Flue gas duct inspection from Economiser
outlet to APH inlet. LHS
Flue gas duct inspection from Economiser
outlet to APH inlet. RHS

Final Date
05/06/08
10/06/08
09/06/08
N/A

Cleaning was done

14/06/08

Cleaning was done

APH outlet to ESP inlet LHS

14/06/08

8.

APH outlet to ESP inlet RHS

14/06/08

9.
10.
11.
12.

Done
14/06/08
14/06/08
14/06/08

13.
14.
15.

Eco bypass duct inspection LHS/RHS


FG duct ESP outlet to ID fan inlet LHS
FG duct ESP outlet to ID fan inlet RHS
FG duct ID fan outlet to chimney
PA Ducts
Air duct from PA fan A to APH inlet .
Air duct from PA fan B to APH inlet .
Common Cold Air Duct

16.

Common Hot Air Duct

09/06/08

17.
18.
19.

PA duct from APH to mills. LHS


PA duct from APH to mills. RHS
Duct to Mills
SA Ducts
Air duct from FD fan A to SAPH inlet
Air duct from FD fan Bto SAPH inlet
Air duct SAPH A inlet to inlet to wind box.
Air duct SAPH B inlet to inlet to wind box.
Cold air interconnection duct
Hot air interconnection duct
SCAPH inspection PSCAPH - A
SCAPH inspection PSCAPH - B
SCAPH inspection SCAPH - A
SCAPH inspection SCAPH - B
Burner Front Checks
Final SADC Checking 0/50/100 %

14/06/08
14/06/08
13/06/08

30.

Compiled By Recommissioning Group

All are kept at 38mm

14/06/08

7.

20.
21.
22.
23.
24.
25.
26.
27.
28.
29.

Remarks

09/06/08
09/06/08
09/06/08

09/06/08
09/06/08
09/06/08
09/06/08
09/06/08
09/06/08
25/05/08
25/05/08
25/05/08
25/05/08

Gate protection plates / expansion


joints were repaired and duct
cleaning done.
Gate protection plates / expansion
joints were repaired and duct
cleaning done.

Duct cleaning done


Duct cleaning done
Duct cleaning done
LHS/RHS common hot PA duct
expansion joint replaced and duct
cleaning done
Duct cleaning done
Duct cleaning done
Duct cleaning done
Duct cleaning done
Duct cleaning done
Duct cleaning done
Duct cleaning done

15/06/08
Page 37

NTPC /TSTPS

Sl no
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.

Details of Check /Inspection


Final Burner tilt Checking 0/50/100 %
Igniter Position Checking from inside
Scanner Position Checking from inside
APH Checks
SAPH- A Fire Fighting system Nozzle
inspection
SAPH- B Fire Fighting system Nozzle
inspection
PAPH- A Fire Fighting system Nozzle
inspection
PAPH- B Fire Fighting system Nozzle
inspection
SAPH- A Soot Blower Operation Check
from inside
SAPH- B Soot Blower Operation Check
from inside
PAPH- A Soot Blower Operation Check
from inside
PAPH- B Soot Blower Operation Check
from inside
SAPH A/B SB Nozzle checking with steam
change
PAPH A/B SB Nozzle checking with steam
change
ESP & Ash Handling Checks
BA hopper Nozzle checking
BA hopper inspection. & box up
Setting Bin inspection & box up
Eco hopper inspection
Eco Bypass hopper inspection
APH Hopper inspection ( all 10 nos)
ESP hopper inspection Pass - A
ESP hopper inspection Pass - B
ESP hopper inspection Pass - C
ESP hopper inspection Pass - D

Compiled By Recommissioning Group

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Final Date
10/06/08
12/06/08
12/06/08

Remarks

17/06/08
17/06/08
17/06/08
17/06/08
15/06/08
15/06/08
15/06/08
16/06/08
15/06/08
16/06/08
14/06/08
16/06/08
14/06/08
15/06/08
15/06/08
16/06/08
10/06/08
10/06/08
13/06/08
13/06/08

Page 38

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

LIST OF INSPECTIONS TG SIDE


Sl no

Details of Check /Inspection

Start date

1.

Deaerator /FST Internal Inspection

03/06/08

2.

Hotwell inspection after cleaning

04/06/08

3.

TDBFP-A exhaust v/v internal inspection

04/06/08

4.

TDBFP-B exhaust v/v internal inspection

5.

LPT last stage blade & Below inspection inside


steam space

04/06/08

Rupture diaphragm of TDBFPB exhaust was found to be


damaged and the same was
replaced.
CFT oil drained to empty
barrels.
After flushing oil was removed.

6.

CFT tank inspection after draining & cleaning

09/06/08

7.

MOT inspection after cleaning

03/06/08

8.

Condenser Water Box Cleaning & Inspections


# 7 side Top/Bottom

08/06/08

9.

Condenser Water Box Cleaning & Inspections


# 5 side Top/Bottom

08/06/08

11.

Condenser In let / outlet Valves seal ring


inspection
LP Flash tank inspection

12.

Remarks

After this flood test inspection


was again carried out.

N/A

After seal ring replacement in


corner 3&4
Not done

HP flash tank inspection

N/A

Not done

13.

SDFT flash tank inspection

N/A

Not done

14.

UFT inspection

16/06/08

15.

OLTC-A screen inspection & opn check # 7 side

09/06/08

16.

OLTC-A screen inspection & opn check# #5 side

09/06/08

10.

Compiled By Recommissioning Group

09/06/08

Page 39

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

DETAILS OF TESTINGS
CARRIED OUT

Compiled By Recommissioning Group

Page 40

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

List Of Testing Carried Out


Sl no

Details of Equipment

No of Day
aft S/D

Boiler & Auxiliaries

Testing
Date
13/06/08&
14/06/08
13/06/08&
14/06/08

1.

ID Fan A VFD testing

22&23

2.

ID Fan B VFD testing

22&23

3.

Boiler Hydro test Internal at 200 ksc

20

11/06/08

4.

Boiler Hydro test External at 259ksc

21

5.

Furnace pressurization test

12/06/08
23/05/08 &
16/06/08

6.

Still air charging of ESP pass - A

21

12/06/08

7.
8.
9.

Still air charging of ESP pass B


Still air charging of ESP pass C
Still air charging of ESP pass - D
Safety valve testing ( only one MS SV
actual floated )

22
24
24

13/06/08
15/06/08
15/06/08

26

17/05/08

10.

1&25

TG & Auxiliaries

11.

Oil injection test for main Turbine

27

18/06/08

12.
13.
14.

Main TG actual over speed test


Oil injection test for TDBFP- A
TDBFP A actual over speed test

1
1

23/05/08
23/05/08

15.

Oil injection test for TDBFP- B

23/05/08

16.
17.
18.
19.
20.

TDBFP B actual over speed test.


TDBFP A EHC characteristic check
TDBFP B EHC characteristic check
Condenser flood test
Air leak test of Generator
Final Main TG EHC characteristic check (
Gov system overhauling was done )
Electrical test of Generator

24/05/08
16/06/08
16/06/08
08/06/08
15/06/08

21.
22.

17
24
27

18/06/08

23.

ATT for safety devices

1&27

24.

ATT for HP/IP valves

28

19/06/08

27

18/06/08

27

18/06/08

26.

GT R/Y/B , UT A/B Sprinkler system


checked
UAT A/B Sprinkler system checked

Compiled By Recommissioning Group

Pressurized up to 221ksc for


10minutes.
Pressurized up to 124mmwc
Pressurized up to 70mmwc
2B & 9A DC low voltage problem
attended.
6A DC low problem attended
C-2B tripping on check oil
9A sparking intermittently
03:38hrs SV-8 MS safety valve actual
floating done. Operated at 186.26ksc
Oil injection test carried out and
found OK (OIL pr 1.4/2.4ksc
respectively)
Test done at 5443 rpm
Turbine tripped at 5982 rpm
Could not be successful (Test oil pr
is not developing)
Turbine tripped at 6056 rpm
Filled up to bottom of LP turbine desk

15/06/08

23/05/08
18/06/08

25.

Remarks

Before unit shutdown and before


synchronization ATT for safety valves
carried out at 3000rpm (RTD-1/2,
Low vac device,O/S trip device)
This was tried at 180MW load but
could not operate. Problem expected
in shutdown programme which was
attended.

Page 41

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

DETAILS OF P&I CHECKS


CARRIED OUT

Compiled By Recommissioning Group

Page 42

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

P&I CHECK STATUS


BOILER & TG SIDE
Sl no

Equipment

Actual Date Of
Check

Area Boiler

Equipment

Actual Date Of
Check

Area TG

Boiler MFT & purge


permissive

14/06/08

Unit Inter trip Check

17-06-08
18-06-08

2.

ID Fan A

15/06/08

Main Turbine Protection

17/06/08

3.

ID Fan - B

15/06/08

CW pump-A

06/06/08

4.

FD fan A

09/06/08

CW pump-B

06/06/08

5.

FD fan B

10/06/08

ACW pump-A

06/06/08

6.

PA fan A

09/06/08

ACW pump-B

12/06/08

7.

PA fan B

10/06/08

ACW pump-C

12/06/08

8.

SAPH A

16/06/08

SGECW pump-A

06/06/08

9.

SAPH - B

16/06/08

SGECW pump-B

06/06/08

10. PAPH A

16/06/08

TGECW pump-A

05/06/08

11. PAPH - B

16/06/08

TGECW pump-B

06/06/08

12. BCW pump - A

09/06/08

TGECW pump-C

05/06/08

13. BCW pump B

10/06/08

CEP-A

11/06/08

14. BCW pump - C

10/06/08

CEP-B

11/06/08

15. Mill - A

13/06/08

CEP-C

11/06/08

16. Mill - B

13/06/08

MDBFP-C

07/06/08

17. Mill - C

13/06/08

TDBFP-A

13/06/08&
16/06/08

18. Mill - D

13/06/08

TDBFP-B

16/06/08

19. Mill - E

13/06/08

Seal Oil System

17/06/08

20. Mill - F

13/06/08

Primary Water System

16/06/08

21. Mill- G

13/06/08

Control Fluid System

16/06/08

22. Mill- H

13/06/08

TG LO / Jacking System

17/06/08

23. Mill - J

13/06/08

24. Mill - K

13/06/08

1.

Compiled By Recommissioning Group

Page 43

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

ELECT SWGR / XFMR Battery &


Battery Chargers
OVERHAULING DETAILS

Compiled By Recommissioning Group

Page 44

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Operation Department
SWITCHGEARS OVERHAULING
Unit shut down Dt:23/05/08
SL.
DESCRIPTION
NO

No of day Aft
S/D

Isolation

Normalization
date

TG side SWGRS at 12.5 Mtr


1.

SS Swgr A

25/5/08

25/5/08

2.

SSS B

26/5/08

26/5/08

3.

3.3KV 6 UAA A

26/5/08

26/5/08

4.

3.3KV 6UAA - B

28/5/08

28/5/08

5.

Air Washer MCC

28/5/08

28/5/08

6.

USS A

29/5/08

29/5/08

7.

UES

30/05/08

30/05/08

8.

11 KV 6 UB

30/5/08

30/5/08

9.

SACDB Sec- A

31/05/08

31/5/08

10.

SACDB Sec- B

31/05/08

31/5/08

11.

USS B

31/5/08

31/5/08

12.

DCSVDB -12.5

31/5/08

31/5/08

13.

TVDC

10

01/06/08

01/06/08

14.

TMCC B

11

02/6/08

02/6/08

15.

TMCC A

11

02/6/08

02/6/08

16.

TURBINE ACDB

12

03/6/08

03/06/08

17.

11 KV 6UB

12

03/06/08

03/06/08

SG side SWGRS at 26 Mtr


18.

SB MCC A & B

24/5/08

16/06/08

19.

BOILER ACDB A & B

24/5/08

24/5/08

20.

COAL MILL MCC A & B

26/5/08

26/5/08

21.

BMCC A

27/5/08

27/5/08

22.

BDDC

27/5/08

27/5/08

Compiled By Recommissioning Group

Page 45

NTPC /TSTPS

SL.
NO

Annual Overhauling Report U 6


23rd May08 to 18rd June08

DESCRIPTION

No of day Aft
S/D

Isolation

Normalization
date

23.

BVDC

28/5/08

28/5/08

24.

BMCC B

30/5/08

30/5/08

ESP/ASH handling SWGRS at


26 Mtr
25.

ESP BOARD A

24/5/08

03/06/08

26.

ESP BOARD B

24/5/08

03/06/08

27.

ESP VFD ESP A/C MCC

31/5/08

02/06/08

28.

ESP BOARD C

14

05/06/08

07/06/08

29.

ESP BOARD D

14

05/06/08

07/06/08

30.

BOTTOM ASH MCC A & B

14

05/06/08

05/06/08

31.

ASH EXTRACTION SWGR B

13

04/06/08

09/06/08

32.

ASH EXTRACTION SWGR A

13

04/06/08

09/06/08

Offsite SWGRS
33.

CT MCC 6B

24/05/08

28/05/08

34.

CT MCC 6A

31/05/08

05/06/08

35.

CW( U# 5 & 6) MCC SEC # B

15

06/06/08

06/06/08

36.

Boiler DCDB 27 M

15

06/06/08

06/06/08

Compiled By Recommissioning Group

Page 46

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

TRANSFORMERS PM
SL.
NO

DESCRIPTION

No of day aft
s/d

Isolation date

Normalization Date

1.

GTR/Y/B, UT-6A, UT-6B

24/05/08

18/06/08

2.

UAT 6A

26/05/08

26/05/08

3.

UAT 6 B

28/05/08

28/5/08

4.

ESP XFMR A

26/05/08

05/06/08

5.

ESP XFMR B

26/05/08

05/06/08

6.

ESP XFMR C

14

05/06/08

07/06/08

7.

ESP XFMR D

14

05/06/08

07/06/08

8.

UST A

29/05/08

29/05/08

9.

UST - B

31/05/08

31/05/08

10.

SST - A

25/05/08

25/05/08

11.

SST B

26/05/08

26/05/08

12.

AET A

13

05/06/08

05/06/08

13.

AET - B

13

05/06/08

05/06/08

OFF SITE XFMRS


14.

CT XFMR - A

31/05/08

05/06/08

15.

CT XFMR - B

24/05/08

28/05/08

16.

CT XFMR - C

31/05/08

05/06/08

Compiled By Recommissioning Group

Page 47

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Details Battery/ Battery Charger Overhauling


Sl.N
o

Description

Battery Set

Isolation

Normalization

1.

220V DC Charger - 1

23/05/08

26/5/08

2.

220 V DC Charger - 2

26/5/08

29/5/08

3.

UPS 1 Charger - 1

4.

UPS 2 Charger - 2

04/06/08
04/06/08

06/06/08
06/06/08

5.

TG Charger - 1

6.

TG Charger - 2

7.

TG Charger - 3

8.

TG Charger - 4

9.

SG Charger - 1

10.

SG Charger - 2

11.

SG Charger - 3

12.

SG Charger - 4

13.

1
2

24/05/08
28/05/08

26/05/08
30/05/08

23/05/08
28/05/08

27/05/08
30/05/08

24 V C&I Ch 1

23/05/08

26/05/08

14.

24 V C&I Ch 2

26/05/08

27/05/08

15.

UPS by C&I

4/06/08

06/06/08

Compiled By Recommissioning Group

Page 48

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

MAJOR PENDING JOBS AFTER


OVERHAULING

Compiled By Recommissioning Group

Page 49

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

MAJOR PENDING JOBS AFTER OVERHAULING


Sl
no
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

Responsibility

SG Area
ESP FB-1( towards ID fan) not available .( spare problem )
Hot PA damper not responding properly in many mills .
BOF damper LHS (1) Gear box /Actuator not available
ID Fan A out let gate 1 is not operating . In open position
kept in track mode
SAPH- A abnormal sound from FC/Motor , yet to be
ascertained
ESP fields tripping frequently .

TG Area
ACW/SGECW/TGECW/MDBFP-C all pump suction valve LS
kept bypassed
Problem experienced with OS Test Motor Module . To be
checked .
LPBP fast opening(45% for 3 Sec) given during TG trip
condition
LPBP opening logic modification done with installation of
three additional transmitteer.

HPCV 1 &2 operation mismatch 100 / 50 %


LPBP CV 1 erratic behavior
Condensate system valve passing still 230 T/Hour
H2 leakage is more 2 - 3 cyl /day against acceptable limit of
cyl. / day
ACW self cleaning strainer B ( towards # 7 ) is mech jam ,
Attended during O/H still problem persist .
M.S. Header drain MS 417/419 drain valve are manual valve
, No actuator available
HRH109 valve is having problem
TDBFP B vibration at 400 RPM going high > 75 mm
CW Pump inlet duct ARV manual valve at GT Yard is under
ground
DC Local control panel P/S indication not available
TDBFP CRH / Aux. St . ACV A problem
Following approach problems are still persisting
D/A stand pipe
ACW self cleaning strainer v/v
Bunker O/L gate

Compiled By Recommissioning Group

Present
Status

DGM ( AHD)
DGM (C&I / BMD)
DGM (EMD)

Attended
Attended

DGM (EMD)

Attended

DGM ( BMD)

Attended

DGM ( AHD)

Attended

DGM (C&I )
DGM (EMDI )

attended

DGM (C&I )
DGM (TMD/C&I )
DGM (TMD)
DGM (TMD)
DGM (TMD)

attended
attended

DGM (EMD)
DGM (TMD)
DGM (TMD /EMD)
DGM (TMD)
DGM (TMD)

attended
Attended

DGM ( OFFsite )
DGM (EMD)
DGM (TMD)

Attended

DGM (TMD)
DGM (TMD)
DGM (BMD)

Page 50

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

DETAILS OF MAJOR
ACTIVITIES

Compiled By Recommissioning Group

Page 51

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Details of TG Set Barring Gear Stopping Activities.


Sl no

Activity

Date

Time

1.

Unit Trip Out Time

23/05/08

14:00 hrs

2.

HP casing Temp Reached 300 0 C

25/05/08

18:00 hrs

3.

Vacuum Killed

25/05/08

18:45 hrs

4.

Force Cooling of TG Set Started

26/05/08

01:10 hrs

5.

HP casing/shaft Temp Reached 120 0


C.

28/05/08

11:20 hrs

TG barring gear stopped at


Total Duration For Stopping the TG
Barring Gear after Unit Shut Down

28/05/08

11:20 hrs

8.

TG Lub Oil system stopped at

28/05/08

9.

Total Duration For Stopping the TG


Lub Oil system after Unit Shut
Down

6.
7.

Remarks
HP Casing Temp 440/448C
HP Shaft Temp - 448C
IP Shaft temp 442C
HP Casing Temp - 294/294C
HP Shaft Temp - 306/308C
IP Shaft temp- 245/246C
After all readiness & TMD clearance.
HPC -130/131C,
HPS -118/119C
IPS - 118/119C
IPC - F - 151/114
IPC - R 145/117
For dismantling the excitation system.

117 hrs
12:10 hrs

Only JOP kept in service for turbine


work.

118 hrs

Turbine Brng metal temp Rise after Lub oil system stopped at
Maximum Casing Temp of 150 C & Shaft temp of 130 C
( Only JOP Kept in service)

Time

HPF

HPR

TB

IPR

LPR

BEARING
10:30
11:40
12:10
12:50
13:20
13:35
14:15
14:30
15:30
16:50
20:45
22:30
03:00
06:00
07:00
10:00

1
46
45
45
46
47
48
48
49
49
50
52
52
50
48
49
37

2
46
45
44
45
46
47
47
49
50
52
57
59
61
61
61
61

2
46
44
44
49
50
51
52
52
54
57
62
64
49
49
49
49

3
47
46
45
45
47
47
44
49
50
51
44
43
42
42
41
41

4
47
46
45
44
45
45
44
44
44
46
43
43
40
39
39
39

Compiled By Recommissioning Group

TE
5
46
45
44
44
43
43
42
42
41
40
40
39
34
33
34
46

EE
6
47
47
47
48
48
48
48
48
46
48
48
48
44
44
44
48

EXCITER
7
45
45
45
43
43
42
42
42
42
43
58
58
58
57
57
57
Page 52

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Turbine Max metal temp after Lub oil system stopped


(Only JOP in service)
Time
28/05/08
14:00
15:40
16:50
20:45
22:30
29/05/08
03:00
06:00
07:00
10:40

HPC
100 % /50 %

HPS
100 % /50 %

IPS
100 % /50 %

HPC
Top/Bot

IPC
Top/Bot

IPC
Top/Bot

122/122
121121
119/119
113/113
111/111

115/115
114/114
112/113
109/109
107/107

128/129
127/128
125/126
122/122
120/120

122/111
121/110
118/118
113/104
111/103

151/114
151/114
149/111
146/107
145/104

145/117
144/116
143/114
139/108
139/107

106/106
104/104
103/103
101/101

103/104
101/101
101/101
98/99

116/116
114/114
113/113
110/110

106/100
104/98
104/97
101/96

141/100
139/97
139/96
137/93

135/101
134/99
133/98
131/95

Compiled By Recommissioning Group

IP DT
F/R

43/35

Page 53

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Details of H2 purge out with CO2


Sl no

DESCRIPTION

DATE

TIME

24/05/08

17:00

REMARKS

CLEARANCE FOR H2

DEPRESSURISATION

1.

Clearance Given by EMD

YES

H2 DEPRESSURISATION
2.

Start of depressurisation

24/05/08

17:40

3.

Depressurised to 0.5 ksc

24/05/08

18:10

PURGING WITH CO2


4.

Start of CO2 filling & purging

24/05/08

18:10

5.

Completion of CO2 filling & purging

25/05/08

08:00

Total 58 cylinders
consumed

6.

CO2 purity in H2

25/05/08

08:00

98%

7.

Clearance by Chemist for air filling

25/05/08

08:00

YES

8.

Total Cylinders Consumed

25/05/08

08:00

58 nos

PURGING WITH AIR


9.

Start of air Purging

25/05/08

08:30

10.

Air Purging completed

26/05/08

00:30

11.

Clearance by Chemist

26/05/08

00:30

12.

Air pressure 1,0 ksc

26/05/08

01:00

13.

Air pressure 3.0ksc

26/05/08

CO2 in air 0.3%


Air purging started at
0.5 ksc
After 24 hrs of air
purging the pr raised to
3.0 ksc

NB : Some of the CO2 cylinders were having less pressure , so the no of cylinders
consumed were more . (Normally 45 cylinders)

Compiled By Recommissioning Group

Page 54

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

DETAILS OF H2 FILLING IN GENERATOR


AFTER Unit Annual Overhaul
Sl no

Description

Date

Time

REMARKS

17/06/08

03:00

After leakage checking

CLEARANCE FOR PURGING


OF AIR WITH CO2
1.

Clearance BY EMD/TMD /C&I

PURGING OF AIR WITH CO2


2.

Start of CO2 filling & air purging

17/06/08

03:00

3.

Completion of CO2 filling & air purging

17/06/08

15:30

12:30hrs

4.

CO2 purity in air By Chemist / Remote

17/06/08

15:30

98%

5.

Clearance By Chemist

17/06/08

15:30

6.

Total Cylinders Consumed

17/06/08

15:30

55

CLEARANCE FOR FILLING OF


H2
7.

Start of filing of H2 & purging of CO2

17/06/08

16:00

8.

H2 purity 98 % reached at

18/06/08

02:30

9.

Clearance by Chemist

18/06/08

02:30

10.

No of H2 cylinders consumed up to 98 %

18/06/08

02:30

11.

H2 pressurisation started

18/06/08

02:30

12.

H2 pressure 3.3 ksc reached at

18/06/08

05:00

Pr up to 3.32ksc

18/06/08

05:00

57 cylinders

13.
14.

No of H2 cylinders consumed for


pressurisation
Total H2 cylinders Consumed in the
process

18/06/08

82 cylinders

139 cylinders

NB : The air purging with CO2 & CO2 purge out with H2 , H2 presurisation carried out
with the TG set at stand still . Barring gear Finally put into service at 2 :45

Compiled By Recommissioning Group

Page 55

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

GENERATOR AIR TIGHTNESS TEST ( 1st time)


AFTER Unit Annual Overhaul
Sl
no
1.
2.

Description

Date

Time

14/06/2008

00:10 hrs

14/06/2008

00:40 hrs
00:40 hrs

CLEARANCE FOR AIR FILLING


Clearance BY EMD/TMD /C&I
Commencement of air Filling /
pressurisation

3.

Air Pressure Reached 4.00 ksc

14/06/2008

4.

H2 Coolers Kept isolated

14/06/2008

5.
6.

Air Leak test Started


Depressurized
Commencement of air Filling /
pressurisation
Air Pressure Reached 4.00 ksc
Air Leak test Started

14/06/2008
14/06/2008

2:30 hrs
5:45 hrs

14/06/2008

11:05

14/06/2008
14/06/2008
15/06/2008
15/06/2008

12:57
13:00 hrs
10:00 hrs
10:24 hrs

15/06/2008

15:59 hrs

15/06/2008
15/06/2008
16/06/2008

17:58 hrs
18:00 hrs
9:00 hrs
0.20 ksc

7.
8.
9.
10.
11.
12.
13.
14.
15.
16.

REMARKS

Depressurized
Commencement of air Filling /
pressurisation
Air Pressure Reached 4.00 ksc
Air Leak test Started
Pressure Drop in 15 Hrs

17.

Pr Drop is 1st 24 Hrs

18.

Pr Drop is 2nd 24 Hrs

19.

Pr Drop is 3rd 24 Hrs

Compiled By Recommissioning Group

After Seal oil system was started


at 19:58 hrs
Generator opened , hence air
pressure raised to 4.0 ksc .
Yes , kept isolated
After all parameters stabilized
To arrest leakages
Pressure reached 3.94 ksc
Pressure 3.72 ksc

Air Pressure 3.93


Air Pressure 3.73
Loss = 13.792 M3 in 24 hrs
= 0.06 ksc ( 3.46-3.40)
Air Leakage Quantity for 24 hrs =
4.9569 m3
= 0.05 ksc ( 3.40-3.35)
Air Leakage Quantity for 48 hrs =
3.879 m3
= 0.07 ksc ( 3.35-3.28)
Air Leakage Quantity for 72 hrs =
3.527 m3

Page 56

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

CONDENSER FLOOD TEST DETAILS


Sl
no

Date

Time

Clearance BY TMD after


readiness

08/06/08

16:04 hrs

2.

Condenser Filling

08/06/08

16:30 hrs

3.

Water Level Up to Bottom


of LPT Deck

08/06/08

19:30 hrs

4.

Checking BY Joint Group


Oprn /TMD/EEMG

08/06/08

19:30 hrs

5.

Hot well draining

08/06/08

20:30 hrs

6.

Condenser Water Box


charging Clearance

9/06/08

18:00 hrs

Water Box Charged

7.

CW Pump Started

10/06/08

10:30 hrs

CW pump B started for TMD


Requirement

1.

Activity

Compiled By Recommissioning Group

Remarks
All Line up took time 26 minutes
-Through normal make up by running
DM makeup Pump.
-By running CST Pump
-By running boiler fill pump to D/A to
LPDFT through D/A over flow line.
Total filling Time 3:00 Minutes
PVC Tube was connected to LPH
Vent up to 17 Mtr
Checking of water box for any tube
leakage was carried out jointly.
Leakage points were recorded.
10:00 Normal level as TG side work
was under progress .

Page 57

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

BOILER HYDRO TEST 1ST TIME (INTERNAL)


Sl
no

Activity

Date

1.

Clearance For Boiler Filling


by BMD

11/06/08

2.

Boiler Filling started

11/06/08

11:00

3.

Boiler Filling Completed

11/06/08

13:10

4.

MD BFP Started

11/06/08

13:40

5.

Boiler Pressure reached


150 Ksc

11/06/08

14:52

6.

Pressure Reduction started

11/06/08

7.

Internal Inspection carried


Out at 80-100 ksc

11/06/08

8.

MDBFP stopped

11/06/08

17:16

9.

Total Duration For MD


BFP Running

11/06/08

3hrs 31min

Time

Remarks

BOILER HYDRO TEST 2ND TIME (EXTERNAL)


Sl
no

Activity

Date

Time

1.

Clearance For Boiler Filling


by BMD

12/06/08

07:30

2.

Boiler Filled

12/06/08

08:00

3.

MD BFP Started

12/06/08

09:26

4.
5.
6.
7.
8.
9.

Boiler Pressure reached


200 Ksc
Boiler Pressure reached
259 Ksc
Pressure Reduction started
Internal Inspection carried
Out at 80-100 ksc
MDBFP stopped
Total Duration For MD
BFP Running

Compiled By Recommissioning Group

Remarks

12/06/08
12/06/08
12/06/08
12/06/08
12/06/08

13:40

12/06/08

4hrs 14min

Page 58

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

TOTAL MDBFP RUNNING FOR HYDROTEST


1.

1st Internal Hydro

3hrs 31min

2.

External Hydro

4hrs 14min

Total 7 hrs 45min

MDBFP C PARAMETERS ( FINAL HYDRO )


Time
Suc Flow
Suction Temp
Drum pressure
Discharge pressure
Pump Current
Max Bearing temp
Max thrust Bearing temp
Scoop Position
LLCV position

Compiled By Recommissioning Group

Unit
T/Hr
0C
Ksc
Ksc
Amp
0C
0C
%
%

10:20 Hrs
365
63
145
140
242
73/T13
75/T25
43.75
60%

11:39 Hrs
371
71
154
149.4
252
73.5
76.2
48.0
60%

12:00 Hrs
523
74.6
264.4
259.87
374
78.2
89.33
69.50
100%

Page 59

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Details of MOT Draining & Refilling


Sl
no

Activity

Date

Time

Remarks
Before Unit Shutdown , Joint
inspection carried out
After Unit Shutdown Joint inspection
carried out.
Before Unit Shut down (Check
protection system is working, Lights in
COT/DOT room adequate)
HPC 122/122 0 C
HPS - 115/115 0 C
IPS - 128/129 0 C
Air locking was experienced , it was
released , then the Flow started .

1.

COT Readiness Checked

Yes

2.

DOT readiness Checked

Yes

3.

COPU availability Checked

Yes

4.

TG Lub Oil system stopped

28/05/08

11:30

5.

MOT Draining started to DOT

02/06/08

19:00

03/06/08

09:15

03/06/08

13:45

Dirty Oil Tank Overflow took place

03/06/08

19:00

Joint Inspection with chemistry.

04/06/08

10:00

Through clean Oil Pump , Completed


at
Hrs , Further Oil Topped
up through the Leakage Oil Pump
from Barrels .

04/06/08

17:40

+ 406 mm in Local

6.
7.
8.
9.

Oil transferred from DOT to


COT through COPU
MOT Room Deluge valve
Operation carried Out
MOT Final Inspection after
cleaning
Oil Transfer From COT to MOT
through CO Pump started

10. Final MOT Oil Level

Compiled By Recommissioning Group

Completed

Page 60

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

DETAILS OF BOILER SAFETY VALVE FLOATING


Sl
no

Activity

Date

Time

1.

Boiler Pressure Raising started


after Electrical testing completed

17/06/08

21:42

2.

Boiler Pressure reached 160 ksc

18/06/08

00:45

3.

Trevy setting completion

18/06/08

4.
5.

Clearance for Further pressure


raising & Valve Floating
Pressure raised & 1st time SV8 Floating Tried

Remarks

Rate of Pressure Rise 40 ksc /Hr


All 8 valves trevy setting was done
6 drum + 2 MS

18/06/08

03:30

18/06/08

03:38

SV-8 (RHS) actually floated. Operated


at 186.02 ksc and reset at 183 ksc

03:33

After 1hr of BMD clearance, pressure


reached to 65 ksc at 04:33 hrs

6.

2nd time Floating Tried

18/06/08

7.

Pressure Reduction clearance


Given by Boiler Maintenance

18/06/08

1.

Oil Guns in service & Oil


Pressure

11

2.

Mills in service & Coal Flow

3.

HP BP Opening

Oil pressure 8.5 ksc


35

35/35

4.

LPBP Opening

45/45

5.

MS / HRH temp

409/421

After Safety valve Floating


Immediately the HP BP to be
opened to reduce the pressure .
LPBP to be kept on auto at Less
Fixed Pressure .
HRH Pr 6.5 ksc

NB : During SV Floating Boiler FW Flow to be maintained even though the level goes HI (
which is not actual ) .
For Drum safety valve FW Flow around 900-1000 tons/Hr , MS Safety Valve 700-800 T/ Hr .

Compiled By Recommissioning Group

Page 61

NTPC /TSTPS

Sl
no
1.
2.
3.

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Furnace Pressurization Test Details 1st Time


Before Overhaul Commencement
Date: 23/06/2008
Activity
Unit Tripped & MFT took
place at
Both Set ID/FD fan kept in
service
Air Flow maintained

Date

Time

23/06/08

14:00 hrs

23/06/08

I/S

23/06/08

16:52 hrs

4.

Fur Pressurized to 120


MMWC

23/06/08

16:52 hrs

5.

Pressure Reduced

23/06/08

18:00

Remarks

Yes
834 T/Hr
Pressurised up to 124mmwc By
throttling the FG dampers at APH
Outlet
ID /FD Fan stopped at 19:38 Hrs as
temp has dropped to 150 0 C

Major Leakages Identified are as follows


Wind box bottom Corner 1,2,3 &4
Wind box Top Corner 2&4
Pent house corner-1 insulation damaged

Furnace Pressurization Test Details 2nd Time


After Overhaul
Date: 17/06/2008
Sl
no

Activity

Date

Time

1.

All Clearances obtained at

16/06/08

23:30hrs

2.

Only FD Fan Kept in service

17/06/08

00:10hrs

ESP inlet all gates are closed to


check the passing .

3.

Fur Pressurized to70 MWC

17/06/08

4.

Pressure Reduced

17/06/08

06:54 hrs

PA Duct Pressurization to 800 mm


carried out after PA Fan running

Compiled By Recommissioning Group

Remarks

Page 62

Compiled By Recommissioning Group

NTPC /TSTPS

OTHER PARAMETERS DURING


OVERHAULING

Page 63

Annual Overhauling Report U 6


23rd May08 to 18rd June08

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Operation Department

Boiler Cooling Down Parameters


Time of Boiler Tripped :- At 14:00 Hrs on 23/05/08
DRUM
PRESS
.

TOTAL
AIR

FURN
ACE
DRAFT

FG I/L
TEMP.
SAPH
A

FG I/L
TEMP.
SAPH
B

AIR
O/L
TEMP.
SAPH
A

AIR
O/L
TEMP.
SAPH
B

BCW A
MTR
CURR
ENT

BCW B
MTR
CURR
ENT

BCW C
MTR
CURR
ENT

BCW
SUC.M
AN.B

BCW
SUC.M
AN.C

BCW
SUC.M
AN.A

MAX.DRUM
METAL
TEMP(L)

MAX.DR
UM
METAL
TEMP(M)

MAX.DRU
M METAL
TEMP(R)

Date

Time

5/24/2008

13:00:00

65.55

-1.07

45.85

42.35

54.65

51.6

84.2

79.52

80.12

100.24

99.9

100.7

5/24/2008

12:00:00

65.55

-11.78

46.15

44.65

55.9

52.75

0.02

0.02

85.8

79.76

86.44

99.68

99.05

99.95

5/24/2008

11:00:00

66

-13.17

46.95

48.1

59.35

58.75

0.01

0.03

0.03

87.32

84.76

86.84

97.96

97.1

98

5/24/2008

10:00:00

0.03

66

-12.95

50.45

54.25

62.7

63.5

0.01

0.03

0.03

86.24

86.6

87.32

96.8

96.4

97.05

5/24/2008

9:00:00

0.05

65.85

-14.93

56

58.9

65.6

66.15

0.01

0.03

0.03

87.16

87.76

88.36

95.72

95.9

96.45

5/24/2008

8:00:00

0.08

65.4

-14.21

61.6

62.65

69.4

69.8

0.01

0.03

0.03

88.52

88

90.16

94.68

94.85

95.35

5/24/2008

7:00:00

0.1

64.95

-13.31

68.9

70.4

73.95

74.2

0.01

0.03

0.03

90.36

88.96

90.72

93.08

92.8

93.05

5/24/2008

6:00:00

0.1

64.35

-10.34

78

79.45

79.4

79.15

0.01

0.03

0.03

90.84

89.52

93.28

91.76

91

91.65

5/24/2008

5:00:00

0.1

63.6

5.46

86.9

90.8

84.65

83.7

30.18

0.03

52.1

93.8

92.2

97.32

94.24

93.95

94.65

5/24/2008

4:00:00

0.15

62.85

6.14

91.35

100.35

89.25

87.25

73.94

0.03

74.35

97.84

97.12

100.72

97.84

97.15

97.85

5/24/2008

3:00:00

0.3

62.1

7.26

94.45

104.15

92.9

89.2

74.66

0.03

75.07

101.12

100.56

104.8

101.64

100.65

101.5

5/24/2008

2:00:00

0.53

61.5

8.07

97.4

108.05

96.15

87.6

74.32

0.03

74.8

105.08

104.84

110

106.08

105.1

105.5

5/24/2008

1:00:00

0.83

60.75

9.11

100

111.7

97.05

77.85

75.53

51.08

76.26

110.36

110.32

116.08

111.8

110.6

111.3

5/24/2008

0:00:00

1.28

60.15

9.56

100.75

115.95

103.3

85.9

75.85

75.57

76.73

116.44

116.76

123.6

119.12

118.25

118.45

Compiled By Recommissioning Group

Page 65

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08
DRUM
PRESS
.

TOTAL
AIR

FURN
ACE
DRAFT

FG I/L
TEMP.
SAPH
A

FG I/L
TEMP.
SAPH
B

AIR
O/L
TEMP.
SAPH
A

AIR
O/L
TEMP.
SAPH
B

BCW A
MTR
CURR
ENT

BCW B
MTR
CURR
ENT

BCW C
MTR
CURR
ENT

BCW
SUC.M
AN.B

BCW
SUC.M
AN.C

BCW
SUC.M
AN.A

MAX.DRUM
METAL
TEMP(L)

MAX.DR
UM
METAL
TEMP(M)

MAX.DRU
M METAL
TEMP(R)

Date

Time

5/23/2008

23:00:00

1.95

59.7

9.92

104.8

123.15

111.9

101.05

74.79

74.5

75.49

123.92

124.44

132.92

128.12

127.15

127.7

5/23/2008

22:00:00

2.98

59.4

10.64

80.65

131.5

123.4

123.25

73.39

72.96

74.12

133.2

133.8

143.36

138.4

137.2

137.6

5/23/2008

21:00:00

4.13

59.1

12.89

105.9

141.25

131.3

129.9

72.88

72.46

73.54

143.84

144.36

153

148.68

147.1

148.05

5/23/2008

20:00:00

5.93

58.8

-5.25

152.8

149.95

139.35

139.05

71.9

71.5

72.61

153.28

153.92

165.48

158.4

157.15

157.6

5/23/2008

19:00:00

9.88

355.2

-28.7

150.9

150.55

140.55

139.95

70.73

70.18

71.29

165.72

166.36

184.88

173.56

173.15

173.2

5/23/2008

18:00:00

16.53

861

117.02

168.15

168.95

133.55

150

70.38

70.1

71.16

185.04

185.52

207.32

194.76

194.3

194.75

5/23/2008

17:00:00

27.13

866.1

3.53

191.9

189.75

90.3

167.7

69.09

68.62

69.7

207.32

207.56

232.32

219.76

218.8

219.3

5/23/2008

16:00:00

44.65

953.4

-16.23

205.3

206.15

181.7

179.85

67.3

66.74

67.81

232.24

232.48

261.16

247.28

246.95

247.35

5/23/2008

15:00:00

83.25

964.05

-10.25

240.35

242

214.85

212.65

65.13

64.68

65.66

260.64

260.84

302.04

282.72

282.6

282.8

Unit Stopped 14:00 hrs


5/23/2008

14:00:00

132

1095.91

-9.8

285.1

287.8

257.35

255.8

61.01

57.33

61.61

301.84

301.68

331.84

322.6

321.95

322.25

5/23/2008

13:00:00

138.85

1274.3

-10.11

338.8

337.2

296.15

295.25

56.24

55.29

56.71

332.52

332

333.64

337.24

335.9

336.55

5/23/2008

12:00:00

138.2

1330.23

-10.02

343.3

340.6

301.3

300.65

55.94

54.99

56.28

335.24

333.88

335.2

338.32

336.9

337.25

5/23/2008

11:00:00

173.33

1541.17

-9.66

351.7

349.15

312.2

312.95

55.81

55.01

56.14

336.48

335.08

349.92

347.32

346

346.65

5/23/2008

10:00:00

193.48

1840.16

-9.84

375.9

372.2

329.25

330.9

52.81

52.48

52.88

352.88

350.56

355.16

357.08

355.9

356.7

5/23/2008

9:00:00

185.45

1752.28

-9.53

378.75

373.6

333.3

334.2

51.6

50.53

51.52

358.8

356.12

353.72

357

355.45

356.65

5/23/2008

8:00:00

186.7

1827.45

-9.93

375.4

369.65

325.75

326

52.04

51.39

52.06

356.64

353.96

354.2

355.48

353.95

354.65

Boiler drained at : - 24/05/08 11:30 Hrs


Compiled By Recommissioning Group

Page 66

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Operation Department
Turbine Cooling Down Parameters
Unit Stopped at 14:00 Hrs on 23-05-08 for Annual Overhaul
Without carrying the actual OS test as LPT OH was planned

Force Cooling started at 1:10 hrs on 26-05-08


TG barring gear stopped at Hrs on 28-05-08 at 11:20 Hrs
Total time to stop barring gear = 117 Hrs

Date

TIME

SPEED

VACUUM

OVEALL
EXP
HP(MM)

OVEALL
EXP
IP(MM)

RELATIVE
EXP
HP(MM

RELATIVE
EXP
IP(MM

RELATIVE
EXP

AXIAL
SHIFT

HPCASIN
G
IN/OUT
TEMP

HPSHAFT
IN/OUT
TEMP

IP SHAFT
IN/OUT
TEMP

HPSV
IN/OUT
TEMP

HPCV
IN/OUT
TEMP

2605/08

23:07

73.8

-0.00

9.93

8.41

-0.31

1.34

11.81-

-0.23

286/286

297/299

237/239

239/237

244/244

00:04

73.8

-0.00

9.85

8.30

-0.31

1.33

11.56

-0.23

284/284

295/297

235/236

236/234

244/244

01:14

73.79

-0.00

9.75

8.02

-0.41

1.28

10.86

-0.22

293/283

293/294

233/234

233/231

237/238

2:20

80.91

-0.31

9.63

7.75

-0.69

1.22

10.21

-0.20

281/281

287/289

231/232

229/227

207/212

3:20

80.91

-0.30

9.50

7.55

-0.97

1.15

16.05

-0.18

279/278

281/284

230/229

225/226

185/189

4:30

74.82

-0.29

9.32

7.32

-1.28

1.10

15.38

-0.17

275/274

278/274

228/227

220/222

169/165

5:30

73.79

-0.29

9.24

7.23

-1.40

1.10

14.84

-0.17

273/272

275/277

227/226

218/220

161/158

6:30

73.79

-0.28

9.08

7.09

-1.57

1.08

14.58

-0.17

270/267

270/269

225/224

215/217

150/147

9:40

73

-0.29

8.8

6.8

-2.0

0.98

13.4

-0.16

256/257

251/255

217/219

205/203

122/123

11:00

76

-0.28

8.28

6.65

-2.12

0.95

13.10

-0.16

250/252

245/248

215/216

200/199

114/116

13:00

73.8

7.93

6.48

-2.24

0.88

12.64

-0.16

243/244

235/238

210/212

193/191

105/107

14:00

71.08

-0.05

7.70

6.38

-2.24

0.82

12.24

-0.16

238/237

231/229

209/208

186/188

104/103

15:00

67.35

-0.10

7.59

6.31

-2.10

0.86

12.30

-0.16

234/235

230/231

207/208

185/184

106/106

16:00

74.15

-0.29

7.43

6.27

-2.01

0.82

12.05

-0.17

230/231

225/227

204/205

182/181

105/106

17:00

73.79

-0.28

7.27

6.19

-1.88

0.81

11.75

-0.16

226/226

226/227

202/203

199/177

109/109

2705/08

-0.29

Compiled By Recommissioning Group

Page 67

NTPC /TSTPS

Date

28/5/08

Annual Overhauling Report U 6


23rd May08 to 18rd June08
OVEALL
EXP
IP(MM)

RELATIVE
EXP
HP(MM

RELATIVE
EXP
IP(MM

RELATIVE
EXP

AXIAL
SHIFT

HPCASIN
G
IN/OUT
TEMP

HPSHAFT
IN/OUT
TEMP

IP SHAFT
IN/OUT
TEMP

HPSV
IN/OUT
TEMP

HPCV
IN/OUT
TEMP

TIME

SPEED

VACUUM

OVEALL
EXP
HP(MM)

18:30

73.79

0.7

7.09

6.06

-1.70

0.71

11.38

-0.17

224/225

223/225

199/200

174/173

113/113

21:00

73.79

-0.27

6.81

5.88

-1.39

0.59

10.89

-0.15

216/217

216/218

194/195

167/166

114/114

22:00

73.79

-0.27

6.72

5.80

-1.29

0.57

10.67

-0.16

212/212

212/215

192/194

165/164

114/114

00:00

73.23

-0.27

6.40

5.61

-1.02

0.47

10.09

-0.15

205/205

207/207

188/188

161/160

113/113

02:30

73.23

-0.27

6.30

5.49

-0.88

0.43

9.78

-0.15

201/202

202/202

185/185

158/185

112/112

04:30

73.13

-0.27

6.06

5.36

-0.74

0.39

9.47

-0.14

196/196

197/195

181/180

153/154

111/111

09:50

74.13

-0.27

5.66

5.06

-0.48

0.28

8.86

-0.15

185/185

184/185

170/171

144/147

108/108

11:50

76

-0.42

5.55

4.89

-0.43

0.20

8.37

-0.14

181/181

180/181

166/168

140/139

107/107

12:50

77

-0.42

5.45

4.83

-0.40

0.17

8.12

-0.15

179/179

178/180

166/166

138/137

107/107

13:30

80

-0.50

5.42

4.77

-0.37

0.13

8.06

-0.14

177/179

178/179

165/165

137/136

106/106

15:30

78.88

-0.47

5.28

4.67

-0.35

0.05

7.75

-0.14

175/175

174/`175

162/163

134/133

105/105

16:30

73.79

-0.47

5.22

4.67

-0.33

0.04

7.63

-0.13

173/174

172/174

160/161

132/131

105/105

17:30

78

-0.49

5.10

4.57

-0.44

7.54

-0.14

172/172

168/170

159/159

130/129

95/96

17:90

76.5

-0.49

5.09

4.56

-0.48

7.41

-0.14

171/172

166/169

158/159

129/128

93/94

18:20

80.95

-0.41

5.03

4.54

-0.55

-0.03

7.38

-0.14

170/171

165/167

157/158

119/118

88/90

23:40

73.79

-0.25

4.49

4.34

-1.43

-0.07

6.86

-0.14

159/160

147/149

149/150

116/115

61/63

00:40

73.79

-0.27

4.31

4.29

-1.54

-0.07

6.71

-0.15

155/156

142/144

147/149

116/115

59/60

1:40

73.79

-0.26

4.27

4.27

-1.56

-0.09

6.64

-0.14

154/155

141/143

146/147

115/114

58/59

2:40

73.79

-0.25

4.42

4.23

-1.59

-0.11

6.52

-0.14

150/151

137/139

144/145

112/112

56/57

Compiled By Recommissioning Group

Page 68

NTPC /TSTPS

Date

Annual Overhauling Report U 6


23rd May08 to 18rd June08
OVEALL
EXP
IP(MM)

RELATIVE
EXP
HP(MM

RELATIVE
EXP
IP(MM

RELATIVE
EXP

AXIAL
SHIFT

HPCASIN
G
IN/OUT
TEMP

HPSHAFT
IN/OUT
TEMP

IP SHAFT
IN/OUT
TEMP

HPSV
IN/OUT
TEMP

HPCV
IN/OUT
TEMP

TIME

SPEED

VACUUM

OVEALL
EXP
HP(MM)

5:40

73.79

-0.25

3.87

4.14

-1.60

-0.11

6.31

-0.14

144/145

130/132

140/142

108/107

52/54

6:40

73.79

-0.25

3.76

4.11

-1.60

-0.12

6.27

-0.14

141/142

126/129

139/140

106/105

52/52

9:40

69

-0.33

3.45

3.99

-1.47

0.17

5.97

0.12

133/134

120/121

135/136

100/99

50/50

129/130

119/120

133/133

97/97

53/53

11:15
12:50

3.22

3.89

-1.15

-0.18

5.69

-0.15

125/126

125/126

131/132

95/94

55/55

13:20

3.2

3.88

-1.07

-0.15

5.69

-0.16

124/125

124/125

130/131

94/93

56/56

Compiled By Recommissioning Group

Page 69

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Turbine Cooling Down Other Parameters


Date

24/5/08
25/5/08

Time
12:01
14:00
15:00
22:40
18:03
20:30

84
92
95
94
104
93

HPBP Down
Temp.
68/68
65/66
64/65
59/59
45/46
45/46

HPT Top/Bot
Temp.
364/339
360/335
357/332
339/314
296/272
291/267

IPT Top/Bot
Temp.
318/276
312/272
308/271
289/256
258/231
254/223

0%
0%
0%
0%
0%
0%
0%
0%
0%

82
80
76
73
71
69
68
66
56

47/48
46/47
45/46
45/47
43/45
44/45
43/45
43/45
42/43

286/262
285/261
283/260
281/257
278/255
274/252
272/280
269/248
216/200

0%
0%
0%
0%

47
55.88
54.40
52.7

38/39
41.00
40.00
40.00

174/160
208/193
209/187
198/183

251/217
250/215
248213
247/211
245/280
243/201
243/201
243/206
204/204
205/178
179/144
210/172
206/168
202/164

Seal Steam
Pr/Temp
250/271
252/262
254/208
251/266
254/255
0/174

Leak off
V/V %
4.5%
4.44
4.39
4.29
4.29
10.44

Seal steam
V/V %
99%
92
88%
81%
79%
0%

10.25
10.35
10.15
10.35
10.30
10.4
10.18
10.54
10.49
5.71%
10.59
10.59
10.59

25/5/08

23:06

26/5/08

01:12
2:20
3:20
3:30
5:30
6:30
21:00

0/112
0/98
0/92
0/86
0/80
0/73
0/70
0/67
0/45

27/05/08

18:30
00:00
02:30
04:30

0/40
0/40
0/40
0/40

28/5/08

9:40

Compiled By Recommissioning Group

LP Exh.Temp.

42 C

134/121

157/122
151/125

Page 70

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Unit Parameters Before &


After Annual Overhaul.

Compiled By Recommissioning Group

Page 71

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

COMPARATIVE PARAMETERS BEFORE & AFTER ANNUAL OH

Area SG

Sl no
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.

Description of the parameters


GEN # 6 MW
GEN # 6 FREQ
FD FAN A DIS PR
FD FAN B DIS PR
ID FAN A DIS PR
ID FAN B DIS PR
PA FAN A DIS PR
PA FAN B DIS PR
PA HDR PRESSURE
FURNANCE DRAFT
WIND BOX PR.(LHS)
WIND BOX PR.(RHS)
O2 VALUE OF FG
O2 VALUE OF FG
CO VALUE
CHIMNEY I/L (NOx) ANAL
CHIMNEY I/L (SOx) ANAL
CHIMNEY I/L (OPA.) ANAL
CHIMNEY I/L (CO) ANAL
BOILER LOAD INDEX
COAL CONSUMPTION-DAY PREV.
TOTAL COAL FLOW
TOTAL AIR FLOW
TOTAL PRIMARY AIR FLOW
SECONDARY AIR FLOW-L
SECONDARY AIR FLOW-R
LTSH (EL-01/AY-23)TEMP
SH DIV. PNL TUBES TMP-GS
SH DIV. PNL TUBES TMP-GS
SH DIV. PNL TUBES TMP-GS
SH DIV. PNL TUBES TMP-GS
PLTN-SH(EL-02/AY-15)TEMP
PLTN-SH(EL-02/AY-15)TEMP
RH HDR(EL-01/AY-66)TEMP
RH HDR(EL-01/AY-70)TEMP
RH HDR(EL-05/AY-38)TEMP
RH HDR(EL-01/AY-74)TEMP

Compiled By Recommissioning Group

Unit
MW
Hz
mmwcl
mmwcl
mmwcl
mmwcl
mmwcl
mmwcl
mmwcl
mmwcl
mmwcl
mmwcl
%
%
%
mg/m3
mg/m3
mg/nm3
%
%
Tons
TPH
TPH
TPH
TPH
TPH
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C

Before O/H
20-05-08
500.77
49.69
179.45
176.90
134.64
138.09
857.02
861.18
821.30
-9.21
66.61
67.18
2.90
2.69
43.74
290.32
630.55
35.34
43.74
85.49
9252.18
380.88
1764.17
702.61
549.49
511.64
426.48
0
516.41
0
0
527.35
538.49
540.07
538.79
554.73
540.61

After OH
25-06-08
505.88
49.16
196.62
194.55
122.16
127.98
859.47
858.22
819.18
-11.27
80.18
79.07
3.50
2.53
37.61
297.59
746.10
59.13
37.61
93.60
0
386.22
1843.88
646.44
610.55
586.76
408.53
0
481.52
0
0
525.20
519.01
577.37
573.14
536.79
586.03
Page 72

NTPC /TSTPS

Sl no
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Description of the parameters


SRAPH-A I/L TEMP
SRAPH-B I/L TEMP
PRAPH-A I/L TEMP
PRAPH-B I/L TEMP
SAHA AIR O/L TEMP
SAHB AIR O/L TEMP
PAHA AIR O/L TEMP
PAHB AIR O/L TEMP
FURNACE TEMP, accoustic
FG TMP AT I/L PLTN SH-L
FG TMP AT O/L PLTN SH-L
FG TMP AT O/L RH-L
FG TMP AT O/L HOR SH-L
FG TMP AT O/L ECO 1&2-L
FG TMP AT O/L ECO 3-L
FG TMP AT I/L PLTN SH -R
FG TMP AT O/L PLTN SH-R
FG TMP AT O/L RH-R
FG TMP AT O/L HOR SH-R
FG TMP AT O/L ECO1&2 -R
FG TMP AT O/L ECO 3-R
ECO O/L TEMP, ACCOUSTIC
FG TEMP AT SRAPH-A I/L
FG TEMP AT SRAPH-B I/L
FG TMP AT I/L OF PAH-A
FG TMP AT I/L OF PAH-B
FG PRAPH A O/L TEMP
FG PRAPH B O/L TEMP
FG SRAPH A O/L TEMP
FG SRAPH B O/L TEMP
COMMON DUCT TEMP A
COMMON DUCT TEMP B
FG TMP AT ID A O/L
FG TMP AT ID B O/L
FG DP ACROSS SAHA
FG DP ACROSS SAHB
FG DP ACROSS PAHA
FG DP ACROSS PAHB
AIR DP ACROSS PAH-A
AIR DP ACROSS PAH-B
AIR DP ACROSS SAH-A

Compiled By Recommissioning Group

Unit
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
mmWC
mmWC
mmWC
mmWC
mmWC
mmWC
mmWC

Before O/H
20-05-08
36.02
38.43
44.19
44.12
337.42
341.64
337.06
323.57
8.57
856.72
861.85
689.59
484.65
371.85
344.56
722.56
802.88
714.40
511.47
388.92
350.96
-1.45
379.13
378.83
352.05
358.88
143.21
133.07
157.70
152.05
151.40
151.40
134.64
138.09
117.14
119.55
103.41
91.84
50.40
50.57
64.69

After OH
25-06-08
29.90
32.65
38.17
38.70
310.78
313.64
315.39
311.84
1040.99
805.14
811.15
652.56
468.59
364.56
347.75
739.50
859.89
716.95
495.11
369.47
0
2.49
348.67
349.21
329.09
341.06
134.98
137.72
132.07
130.11
132.42
132.42
122.16
127.98
112.56
115.50
97.94
96.17
44.34
46.33
49.59
Page 73

NTPC /TSTPS

Sl no
79.
80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.
92.
93.
94.
95.
96.
97.
98.
99.
100.
101.
102.
103.
104.
105.
106.
107.
108.

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Description of the parameters


AIR DP ACROSS SAH-B
PRAPH-A FG O/L DAMPER
PRAPH-B FG O/L DAMPER
SRAPH-A FG O/L DAMPER-1
SRAPH-A FG O/L DAMPER-2
SRAPH-B FG O/L DAMPER-1
SRAPH-B FG O/L DAMPER-2
BUR.TILT CORNER 1 CYLIN_POS
BUR.TILT CORNER 2 CYLIN_POS
BUR.TILT CORNER 3 CYLIN_POS
BUR.TILT CORNER 4 CYLIN_POS
IDF-A MTR CURRENT CH-1
IDF-A MTR CURRENT CH-2
IDF-B MTR CURRENT CH-1
IDF-B MTR CURRENT CH-2
FDF-A MTR CURRENT
FDF-B MTR CURRENT
PAF-A MTR CURRENT
PAF-B MTR CURRENT
MILL-A CURRENT
MILL-B CURRENT
MILL-C CURRENT
MILL-D CURRENT
MILL-E CURRENT
MILL-F CURRENT
MILL-G CURRENT
MILL-H CURRENT
MILL-J CURRENT
MILL-K CURRENT
MDBFP-C CURRENT

Compiled By Recommissioning Group

Unit
mmWC
%
%
%
%
%
%
Deg
Deg
Deg
Deg
Amp
Amp
Amp
Amp
Amp
Amp
Amp
Amp
Amp
Amp
Amp
Amp
Amp
Amp
Amp
Amp
Amp
Amp
Amp

Before O/H
20-05-08
53.32
92.27
69.98
79.44
76.24
92.79
97.58
63.88
64.19
56.09
63.16
276.12
314.86
307.03
183.91
120.11
122.77
78.86
78.57
0
119.29
92.33
106.03
106.36
106.03
118.71
0
115.44
95.67
0.21

After OH
25-06-08
49.77
100.23
94.74
75.12
81.26
81.69
77.20
64.40
65.40
65.85
64.66
299.74
284.84
313.50
218.91
129.70
136.45
74.71
73.17
121.00
116.72
109.66
113.28
118.79
113.28
124.13
0
118.57
0
0.19

Page 74

f
o
r
e
O
/
HA
f
t
e
r
O
H
De
s
c
r
i
pt
i
o
no
ft
h
ep
a
r
a
me
t
e
r
sU
n
i
t Be
0
0
5
0
8
2
5
0
6
0
8
1
.
W
M
W
5
0
1
.
3
9
5
0
3
.
3
0
2
.G
GE
EN
N#
#6
6M
M
V
A
R
M
V
AR 2
7
8
.
2
0
5
8
.
3
7
3
.
G
E
N
#
6
F
R
E
Q
H
z
4
9
.
9
1
4
8
.
9
8
4
.
M
A
I
N
S
T
E
A
M
F
L
O
W
T
P
H
1
5
3
.
8
7
1
6
3
.
3
4
5
.C
F
E
E
D
W
A
T
E
R
F
L
O
W
T
PH
H1
1
5
2
.
9
81
1
5
0
.
3
2
6
.
O
N
D
E
N
S
A
T
E
F
L
O
W
T
O
D
E
A
.
T
P
2
9
6
.
1
6
3
0
1
.
7
0
7
.
P
R
A
F
L
O
W
L
E
F
TT T
P
0
.
1
3
5
.
6
8
.S
SH
HS
S
P
R
AY
Y
F
L
O
W
R
I
G
H
T
PH
H2
3
.
6
0 4
4
5
.
6
9 /TSTPS
NTPC
9
.
R
H
(
L
I
N
E
B
)
S
P
R
A
Y
L
O
P
H
4
.
3
9
1
.
7
5
1
0
.
(
L
I
N
E
A
)
S
P
R
A
YF
F
L
OW
W T
T
P
6
.
9
5 1
2
7
.
2
7
1
.R
AH
UX
S
T
E
A
M
F
L
O
W
T
PH
H1
0
6
.
3
6
1
2
.
H
P
B
Y
P
A
S
A
S
T
E
A
M
F
L
O
W
T
P
H
0
0
1
3
.
H
P
B
Y
P
A
S
S
B
S
T
E
A
M
F
L
O
W
T
P
H
0
0
1
4
.C
CE
OP
N
D
F
L
O
W
T
O
G
S
C
T
PH
H1
3
6
5
.
0
31
3
7
2
.
4
1
5
.
A
D
I
S
C
H
.
F
L
O
W
T
P
6
8
9
.
9
5
6
8
5
.
7
1
1
6
.
C
E
P
B
D
I
S
C
H
.
F
L
O
W
T
P
H
4
0
.
6
2
2
9
.
8
4
1
7
.D
CM
EP
C
DI
SC
HF
.
F
L
O
W
T
PH
H6
7
8
.
8
.
6
7
1
8
.
N
O
R
M
/
U
L
O
W
T
O
C
O
NN
D
T
P
2
5
.
3
2 69
0
1
9
.D
M
E
M
E
R
M
/
U
F
L
O
W
T
O
C
O
D
T
P
H
0
0
2
0
.
CR
OH
ND
NT
RMH
M
KUPI
NT
R
E
A
D
I
NG T
O
NS 2
3
5
.
7
63
0
6
.
3
4
2
1
.
F
L
T
S
T
H
D
R
T
P
0
0
2
.C
T
DB
BF
F
P
AO
F
L
O
WUTAUX
T
PH
H9
8
6
7
.
4
68
8
1
5
.
5
7
2
3
.
T
D
P
B
F
L
O
W
T
P
H
1
3
.
0
5
2
0
.
0
9
2
4
.
D
BF
P
C
SU
CF
L
O
W
P
5
.
7
82
3
.
4
2
2
5
.M
ST
T
M
F
L
O
W
T
O
B
F
PT
A T
T
PH
H3
9
.
1
7
3
7
.
3
4
2
6
.
S
M
F
L
O
W
T
O
B
F
P
T
A
T
P
H
3
8
.
6
4
3
7
.
6
4
2
7
.
S
T
M
F
L
O
W
T
O
B
F
P
T
B
T
P
H
4
1
.
3
8
3
7
.
7
4
2
8
.C
SW
T
MC
F
L
O
W1
T
O
F
P
T
B
T
P
H
0
3
2
.
0
5
2
9
.
O
N
D
S
TB
H
A
L
F
I
/
L
T
M
P
e
g
C3
1
.
4
3
2
.
6
7
3
0
.
S
A
L
F
O
/
L
T
M
P D
D
g
5
.
2
1
3
.
1
3
1
.C
CW
WC
CO
ON
ND
D1
2
NT
DH
H
A
L
F
I
/
L
M
P
De
e
gC
C4
3
1
.
0
7 4
3
2
.
5
3
3
2
.
C
W
C
O
N
D
2
N
D
H
A
L
F
O
/
LT
T
M
P m
D
e
g
C
4
5
.
3
5
4
2
.
9
5
3
.
C
O
N
D
F
I
R
S
T
H
A
L
F
D
P
m
W
C
0
.
3
2
0
.
3
9
3
4
.C
CS
OT
NL
D
S
E
C
ONDHAL
FDP mm
mm
WC 3
0
.
2
8
0
.
2
6
3
5
.
E
V
E
L
8
2
5
.
8
73
4
5
.
2
9

Compiled By Recommissioning Group

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Area TG

Page 75

NTPC /TSTPS

Sl no
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Description of the parameters


COND HOTWELL TEMP
CONDENSER PR
COND ABS. PR
CEP DISCH PR
CEP DISCH TEMP
LPH 1 Cond I/L TEMP
LPH 1 DRN O/L TEMP
LPH 2 I/L COND TEMP
LPH 2 I/L EXT 2 STM TEMP
LPH 2 I/L EXT 2 STM PRESS
LPH 2 DRN O/L TEMP
LPH 3 I/L COND TEMP
LPH 3 O/L COND TEMP
LPH 3 I/L EXT 3 STM TEMP
LPH 3 I/L EXT 3 STM PRESS
LPH 3 DRN O/L TEMP
DEARATOR I/L COND TEMP
DEARATOR O/L COND TEMP
EXT STM PR TO D/A
EXT STM TEMP TO D/A
DEAERATER PRESSURE
BFP DISCH HDR PR
BFP DISCH HDR TEMP
FW TEMP AT HPH 5A I/L
FW TEMP AT HPH 5A O/L
HPH 5A DRN O/L TEMP
HPH 5A EXT 5 STM I/L TEMP
EXT STM PRES AT HPH 5A I/L
FW TEMP AT HPH 5B I/L
FW TEMP AT HPH 5B O/L
HPH 5B DRN O/L TEMP
EXT STM PRES AT HPH 5B I/L
HPH 5B EXT 5 STM I/L TEMP
FW TEMP AT HPH 5A O/L
FW TEMP AT HPH 6A O/L
HPH 6A DRN O/L TEMP
HPH 6A DRN O/L to HPH 5A TEMP
CRH STM PRES AT HPH 6A I/L

Compiled By Recommissioning Group

Unit
Deg C
Kg/cm2
KG/CM2
Kg/cm2
Deg C
Deg C
Deg C
Deg C
Deg C
Kg/cm2
Deg C
Deg C
Deg C
Deg C
Kg/cm2
Deg C
Deg C
Deg C
Kg/cm2
Deg C
Kg/cm2
Kg/cm2
Deg C
Deg C
Deg C
Deg C
Deg C
Kg/cm2
Deg C
Deg C
Deg C
Kg/cm2
Deg C
Deg C
Deg C
Deg C
Deg C
Kg/cm2

Before O/H
20-05-08
47.94
-0.89
0.11
27.28
48.71
50.81
65.76
64.60
146.67
0.96
73.24
107.33
129.79
215.25
2.46
129.57
129.64
168.97
10.01
308.80
7.78
208.61
173.46
173.02
203.81
181.45
420.73
18.77
172.88
205.36
183.63
18.79
419.01
203.81
248.54
210.44
204.31
45.29

After OH
25-06-08
46.54
-0.90
0.10
26.53
47.05
49.01
62.98
63.64
134.08
0.91
71.62
105.49
128.51
206.26
2.34
127.44
0
165.95
9.41
301.87
7.31
204.45
170.56
170.21
207.43
178.12
419.33
17.86
0
207.25
0
17.88
0
207.43
256.87
0
202.27
44.75
Page 76

NTPC /TSTPS

Sl no
74.
75.
76.
77.
78.
79.
80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.
92.
93.
94.
95.
96.
97.
98.
99.
100.
101.
102.
103.
104.
105.
106.
107.
108.
109.
110.
111.

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Description of the parameters


CRH STM TEMP AT HPH 6A I/L
HPH 6A O/L FEED WTR PRESS
FW TEMP AT HPH 5B O/L
FW TEMP AT HPH 6B O/L
HPH 6B DRN O/L TEMP
HPH 6B DRN O/L to HPH 5B TEMP
CRH STM PRES AT HPH 6B I/L
CRH STM TEMP AT HPH 6B I/L
HPH 6B O/L FEED WTR PRESS
FW PR AT ECO I/L
FW TEMP AT ECO I/L
FW TEMP AT ECON O/L-LHS
FW TEMP AT ECON O/L-RHS
DRUM LEVEL
DRUM STM PRESSURE
STM TMP-DESH I/L(LINE-A)
STM TMP-DESH I/L(LINE-A)
STM TMP-DESH I/L(LINE-B)
STM TMP-DESH I/L(LINE-B)
ST TMP P-SH HDR I/L LN-A
ST TMP P-SH HDR I/L LN-B
DESH OUTLET STEAM TEMP-L
DESH OUTLET STEAM TEMP-R
DESH O/L PR (LN-A)
DESH O/L PR (LN-B)
MS PR.AT BLR O/L(LINE-A)
MS PR.AT BLR O/L(LINE-B)
MS TMP SH O/L (LN-A)
MS TMP SH O/L (LN-B)
MS HDR TEMP
MS HDR TEMP
MS HDR PRESSURE
THROTTLE PRESSURE
MAIN STM PRESS.BEF ESV-1
MS TEMP BEF ESV-1
MS TEMP BEF ESV-2
HPT FIRST STAGE PR
HPT EXHAUST PRESSURE

Compiled By Recommissioning Group

Unit
Deg C
Kg/cm2
Deg C
Deg C
Deg C
Deg C
Kg/cm2
Deg C
Kg/cm2
Kg/cm2
Deg C
Deg C
Deg C
mm
Kg/cm2
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Deg C
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Deg C
Deg C
Deg C
Deg C
Kg/cm2
Kg/cm2
Kg/cm2
Deg C
Deg C
Kg/cm2
Kg/cm2

Before O/H
20-05-08
332.24
202.84
205.36
253.19
214.48
206.44
45.23
332.82
202.53
198.57
250.30
319.05
322.34
-9.58
191.84
406.45
404.95
410.48
410.79
485.15
472.36
399.13
402.96
191.61
193.01
173.76
173.85
543.58
529.73
537.47
533.34
170.34
170.34
165.57
528.45
529.63
162.93
46.61

After OH
25-06-08
342.97
200.84
207.25
257.22
215.43
202.91
44.77
343.64
201.03
197.31
256.52
325.44
329.43
0.19
190.15
408.51
406.50
413.46
413.33
481.11
475.43
395.96
405.74
189.93
191.27
173.33
172.53
541.11
531.54
534.29
535.67
168.93
168.93
165.40
526.41
528.03
162.16
45.33
Page 77

NTPC /TSTPS

Sl no
112.
113.
114.
115.
116.
117.
118.
119.
120.
121.
122.
123.
124.
125.
126.
127.
128.
129.
130.
131.
132.
133.
134.
135.
136.
137.
138.
139.
140.
141.
142.
143.
144.
145.
146.
147.
148.
149.

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Description of the parameters


HPT EXHAUST TEMPERATURE
COLD REHEAT LINE TEMP
RH INLET TEMP BEFORE SPRAY-L
RH INLET TEMP BEFORE SPRAY-R
CRH PR RH I/L (L)
CRH PR RH I/L (R)
RH ST TMP-DESH O/L(LN-A)
RH ST TMP-DESH O/L-LN-B
RH ST TMP AT RH O/L-LN-A
RH ST TMP RH O/L (LN-B)
HRH PR.AT RE-HTR O/L(L)
HRH PR.AT RE-HTR O/L(R)
RH STM HDR TMP AT BLR O/L
RH ST HDR TMP BOILER O/L
HRH STM PRESS AT EXH CAS
HRH STM PRES BEF LPBP
STM PRESS BEF IPT BLDNG
HRH STM TEMP BEF IV-1
HRH STM TEMP BEF IV-2
IPT EXHAUST TEMPERATURE
IPT EXHAUST PRESSURE
LPT EXHAUST TEMP.
LPT EXHAUST PRESSURE
SH SP FW TMP AF FCV LN-A
SH SP FW TMP AF FCV LN-B
RH (LINE B) SPRAY TEMP
RH (LINE A) SPRAY TEMP
CEP A CURRENT
CEP B CURRENT
CEP C CURRENT
TG ECWP A
TG ECWP B
TG ECWP C
SG ECWP A
SG ECWP B
ACWP A
ACWP B
ACWP C

Compiled By Recommissioning Group

Unit
Deg C
Deg C
Deg C
Deg C
Kg/cm2
Kg/cm2
Deg C
Deg C
Deg C
Deg C
Kg/cm2
Kg/cm2
Deg C
Deg C
kg/cm2
kg/cm2
Kg/cm2
Deg C
Deg C
Deg C
kg/cm2
Deg C
Kg/cm2
Deg C
Deg C
Deg C
Deg C
Amp
Amp
Amp
Amp
Amp
Amp
Amp
Amp
Amp
Amp
Amp

Before O/H
20-05-08
350.02
340.74
333.23
333.01
46.20
46.26
297.88
277.20
525.90
544.67
44.73
44.44
544.06
545.33
46.61
43.74
42.44
528.76
529.83
413.61
19.26
47.42
-0.89
172.54
162.70
170.21
170.29
160.69
0.35
158.43
53.61
0.01
52.55
0.38
155.43
187.09
182.52
0.19

After OH
25-06-08
344.72
338.66
344.92
344.43
45.78
45.84
284.10
262.59
538.83
540.43
44.31
44.04
541.60
541.87
45.33
42.44
42.03
532.57
533.15
412.07
18.43
46.40
-0.90
170.28
41.09
167.43
167.80
152.78
0
150.82
50.74
51.43
0.12
149.83
0.38
0.19
179.86
177.19
Page 78

NTPC /TSTPS

Sl no
150.
151.
152.
153.
154.
155.
156.
157.
158.
159.
160.
161.
162.
163.
164.
165.
166.
167.
168.
169.
170.
171.
172.
173.
174.
175.
176.
177.
178.

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Description of the parameters


CWP A
CWP B
AXIAL SHIFT POSITION
AXIAL SHIFT POSITION
AXIAL SHIFT POSITION
HPT DIFF. EXPANSION
IPT DIFF. EXPANSION
LPT DIFF. EXPANSION
GEN.EXCITATION FIELD VOLTAGE
GEN.EXCITATION FIELD CURRENT
GEN STATOR R-PHASE
GEN STATOR Y-PHASE
GEN STATOR B-PHASE
GEN.STATOR CW IN TEMP.
GEN. COLD GAS TEMP.LEFT
GEN. COLD GAS TEMP.RIGHT
GEN. GAS PURITY
DIFF.PR.ACROSS SEAL OIL/H2(TE)
DIFF.PR.ACROSS SEAL OIL/H2(EE)
GEN.EXCITATION H2 PRESSURE
GEN. STATOR CW DP
GEN.STATOR CW FLOW
GEN.STATOR CW IN FLOW
GEN STATOR SLOT TEMP. MAX
GEN STATOR SLOT TEMP. MIN
LUB. OIL TEMPERATURE
GEN.STATOR CW CONDUCTIVITY
CEP DIS HDR PR
COND NRM MK UP INT READING

Compiled By Recommissioning Group

Unit
Amp
Amp
%
%
%
MICRON
MICRON
MICRON
VOLTS
AMPS
AMPS
AMPS
AMPS
Deg C
Deg C
Deg C
%
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Deg C
Deg C
Deg C
MS/sec
KG/CM2
T

Before O/H
20-05-08
147.26
139.90
-0.13
-0.11
-0.11
-2.61
10.61
16.77
47.08
32.15
14209.53
14416.83
14319.80
44.99
40.33
39.43
99.90
1.55
1.59
3.48
1.02
61.14
0.00
80.02
40.38
46.12
1.99
27.28
235.76

After OH
25-06-08
142.69
137.31
-0.12
-0.14
-0.16
-3.51
4.88
21.86
46.23
31.15
13845.91
14075.50
14020.60
44.98
40.10
39.34
99.92
1.80
1.88
3.38
0.92
59.39
0.00
78.51
36.50
44.99
2.28
26.53
306.34

Page 79

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

TURBOVISSORY PARAMETERS
BEFORE & AFTER OVERHAUL.

Compiled By Recommissioning Group

Page 80

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

TURBOVISORY PARAMETERS MONITORING SHEET


BEFORE & AFTER ANNUAL OVERHAUL, AT FULL LOAD OPEARTION.

1.

HPT (F) -5.0 &+3.5

mm

-2.53

At Rotor
Zero
Position
17/06/08
11:21hrs
0.14

2.
3.

IPT -1.0 &+5.5


LPT -3.0 &+35

mm
mm

10.62
17.00

0.06
-0.09

1.62
7.90

1.25
4.18

4.79
22.2

mm
mm
mm

-0.20
-0.18
-0.18

-0.11
-0.12
-0.12

-0.11
-0.11
-0.11

-0.08
-0.09
-0.09

-0.18
-0.20
-0.23

0.15
0.04

5.72
2.59

8.16
2.88

12.95

Sl.
No

Description of
parameters.

UNIT

Before OH
at Full Load

DIFF EXPANSION

4.
5.
6.

AXIAL SHIFT

Point (1) +/- 0.5 & +/- 1.0


Point(2)
Point(3)

At 500 MW

At 360 RPM

At 3000 RPM

18/06/08
13:30hrs
3.22

18/06/08
16:16hrs
1.90

24/06/08
13:55hrs
-3.54

7.
8.

OVERALL
EXPANSION
HPT (F) ( 0-30 MM)
IPT( R ) (0-20 MM)

9.
10.
11.
12.
13.
14.

BBRNG VIBRATION
HPT (F) 1X/1Y
HPT 2X/2Y
IPT
3X/3Y
LPT
4X/4Y
GEN(F) 5X/5Y
GEN 6X/6Y

15.
16.
17.
18.
19.
20.
21.
22.

23.

24.

mm
mm
>42
micron
micron
micron
micron
micron
micron

15.03/17.76
21.4/15.6
16.7/15.8
20.6/26.7
20.8/22.0
27.9/36.8

3.7/3.3
2.9/2.9
2.3/2.1
2.9/1.9
3.3/2.5
2.7/2.9

11.3/16.7
18.7/10.1
20.3/12.8
26.9/12.3
20.8/8.5
8.9/8.5

19.1/14.6
18.7/18.1
24.9/14.4
43.7/23.0
23.0/54.6
19.7/43.7

24.9/24.9
20.1/16.2
24.6/28.3
37.4/37.0
20.5/39.2
31.2/49.1

EXC 7X/7Y
Shaft VIBRATION
HPT (F) 1X/1Y
HPT 2X/2Y
IPT
3X/3Y
LPT
4X/4Y

micron
>100
micron
micron
micron
micron

34.7/24.7

2.5/2.5

7.6/8.5

25.1/19.5

30.2/24.9

100.9/139.3
97.8/88.4
50.1/38.6
64.8/65.0

20.5/4.8
3.3/3.9
0.78/078
2.7/2.3

39.0/30.4
87.2/70.8
44.9/39.4
44.3/36.8

75.9/58.6
111.0/56.2
22.8/34.3
76.9/60.9

83.7/51.3
129.0/97.6
49.9/41.7
95.8/88.8

GEN(F) 5X/5Y
GEN 6X/6Y
EXC 7X/7Y
Turbine Brng
Temp.
HPT (F)T
Point 1,2
L/R
B
Point 3,4
L/R

micron
micron
micron

45.0/44.3
98.1/97.9
199.6/134.8

2.9/3.3
3.7/3.7
3.1/3.5

77.3/41.5
69.1/43.1
38.8/27.3

39.8/65.2
72.0/100.1
170.6/90.5

55.6/47.8
88.8/94.6
169.6/109.3

HPT (R) T
L/R
B
L/R

110 / 130
81/87
73.2/68.2

64/58

75.1/71.2

52/76

Point 5,6

62.4/75.1

60/73

58.5/76.1

64/65

Point 7,8

63.4/65.3

61/58

62.4/65.3

52/68

Compiled By Recommissioning Group

Page 81

NTPC /TSTPS

Sl.
No

Description of
parameters.

26.

T Bearing
FL/FR
RL/RR
IPT (R)

27.

LPT (R)

28.

GEN (TE)

29.

GEN (EE)

30.

Exciter
Brng.

25.

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Annual Overhauling Report U 6


23rd May08 to 18rd June08
UNIT

Before OH
at Full Load

At Rotor
Zero
Position

At 360 RPM

At 3000 RPM

At 500 MW

Point 9,10

57.7/78.0

55/73

54.6/72.2

62/64

Point 11,12

67.3/69.3

63/62

69.3/65.3

64/56

Point 13,14

63.4/62.4

60/59

61.4/59.5

88/84

Point 15,16
Point 17,18
Point 19,20
Point 21,22
Point 23,24
Point 25,26

86.8/90.7
85.8/89.7
81.0/81.0
74.1/74.1
80.0/80.0
80.0/80.0

84/85
89/89
73/72
67/67
77/77
77/77

82.9/86.8
90.7/89.7
72.2/72.2
67.3/67.3
78.0/79.0
77.1/77.1

85/88
78/77
72/72
81/81
78/78
64/64

Point 27,28
BRNG Drain Oil TEMP
Return Oil Temp HPF
Return Oil Temp HPR
Return Oil Temp IPR
Return Oil Temp LPR

65.3/65.3

61/62
48.8/48.8

63.4/71.2
62/62

62/62
62.4/63.4

60.51
56.36
71.00

49.7
51.9
65.1

57.8
53.1
66.8

C
0 C
0 C
MM
Ksc

71.00
64.90
65.15
56.36

68.5
61.2
61.9
52.2
923

70.5
61.7
62.9
53.1
915

64.42

45.63

Return Oil Temp Gen F


Return Oil Temp Gen R
Return Oil Temp Exciter
MOT Level
Lub Oil Hdr Pres
Lub Oil Hdr Temp Bef
Cooler
Lub Oil Hdr Temp Aft
Cooler

65.3/65.3
0
0
0
0

C
C
C
C

Compiled By Recommissioning Group

Page 82

5:18:00 AM

5:12:00 AM

5:06:00 AM

5:00:00 AM

4:54:00 AM

4:48:00 AM

4:42:00 AM

4:36:00 AM

4:30:00 AM

4:24:00 AM

4:18:00 AM

4:12:00 AM

4:06:00 AM

4:00:00 AM

3:54:00 AM

3:48:00 AM

3:42:00 AM

3:36:00 AM

3:30:00 AM

3:24:00 AM

3:18:00 AM

3:12:00 AM

3:06:00 AM

3:00:00 AM

2:54:00 AM

2:48:00 AM

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

175.08

175.04

174.42

175

175.02

175.04

175.9

175.04

174.9

174.88

174.34

174.98

174.94

174.94

175.46

174.5

176.88

179.34

180.28

177.24

148

140.24

128.96

120.58

106.4

93.04

82.88

74.48

65.18

65.14

65

65.04

65.1

65.08

65.08

65.08

MS
Throttl
e Pr

149.02

140.72

129.54

121.36

107.4

94.42

84.1

76.2

66.82

66.02

65.92

66

66.06

66.08

66.14

66.2

Drum
Pr

MS
Pree

173.95

173.93

173.43

174.02

173.97

173.99

174.35

173.77

175.14

180

150.35

139.93

129.55

121

107.48

94.01

83.25

74.9

65.05

64.66

64.49

64.49

64.57

64.53

64.53

64.53

Compiled By Recommissioning Group

Time

Date

NTPC /TSTPS

408.87

407.9

407.5

408.62

411.72

414.2

416.47

420.43

421.54

425.07

410.53

410.42

420.28

425.76

425.58

418.81

413.08

409.3

404.98

401.96

399.69

397.57

395.62

394

392.56

391.77

MS Hdr
Temp

31.59

30.78

25.9

13.6

15.98

16.53

27.21

37.53

34.41

31.97

46.95

39.86

41.54

43.39

47.5

51.01

50.6

55.75

58.95

47.82

48.49

48.95

48.5

49.35

49.76

50.23

BP 1

31.45

30.67

25.96

13.37

16.05

16.51

27.05

37.77

28.88

34.86

47.37

40.13

41.53

43.35

47.68

50.93

50.47

56.14

59.1

47.7

48.51

48.84

48.45

49.46

49.99

50.47

BP 2

5.19

5.19

5.17

5.18

5.22

5.21

5.27

5.19

5.19

7.12

7.36

6.01

7.87

8.97

10.04

10.11

10.04

10.12

10.05

10.02

10.08

10.08

10.08

10.06

10.04

10.03

HRH
Press

421.4

421.08

420.82

419.96

420.28

420.93

422.37

426.51

428.78

431.19

434.9

431.88

431.62

432.2

431.62

427.41

417.69

393.36

357.79

348.82

340

326.25

322.26

326.65

334.57

343.35

HRH Hdr
Temp

422.9

421.04

419.62

418.93

420.67

424.27

426.31

439.27

441.69

442.68

447.39

435.55

434.06

432.2

428.54

419.24

403.19

384.9

359.72

351.35

347.94

338.83

337.59

346.08

356.44

366.11

RH Metal
temp Max

35.98

34.56

30.16

19.21

27.58

28.59

48.19

55.98

41.76

42.54

81.93

48.33

37.2

34.27

34.07

43.41

38.51

40.77

37.74

22.19

23.43

22.1

15.49

16.41

17.03

17.06

4,878.00

4,866.00

4,871.40

4,756.20

4,717.20

4,754.40

4,809.00

4,963.20

4,977.00

5,074.80

5,044.80

4,687.80

4,441.80

4,172.40

4,060.20

3,930.60

3,835.80

3,503.40

3,833.40

3,587.40

3,515.40

3,528.60

3,532.80

3,537.00

3,534.00

3,530.40

MDBFP
speed

Page 83

42.69

41.49

37.46

26.43

35.35

36.23

55.2

61.77

48.49

49.93

87.99

54.38

43.84

41.12

40.65

49.21

44.61

47.03

44.12

29.09

30.77

29.02

21.97

23.03

23.76

23.77

LPBP 1 LPBP 2

Boiler Safety Valve Floating Parameters

Annual Overhauling Report U 6


23rd May08 to 18rd June08

312.46

306.68

311.78

234.94

227.12

259.08

292.23

396.27

358.87

355.13

614.38

330.48

424.66

310.08

342.38

349.69

359.21

264.69

404.94

238.51

216.92

238.51

230.52

227.8

227.63

226.95

Feed at
ECO

-53.94

-23.19

23.19

99.88

-50.38

-99.63

-103.63

-140.63

-59.75

-16.69

-151.38

87.75

-77.25

80.13

41.94

-59.94

78

62.06

-115.81

138.69

143.81

46.69

104.5

80.5

33.94

-30.13

Drum
lvl

789.91

782.32

789.58

706.86

699.6

732.16

768.02

875.38

839.63

311.79

306.28

311.41

233.89

226.48

259.16

292.6

396.72

357.77

357.01

615.03
845.57

329.65
1,056.5
5

425.22

310.27

342.76

350.74

359.48

265.43

404.32

238.64

216.6

239.02

229.9

227.81

227.81

226.48

Total
Feed

780.78

841.61

720.39

753.06

796.62

791.67

683.98

827.09

670.01

639.32

605.22

593.23

586.63

586.19

591.36

MDBF
P Suc
flow

276.45

270.56

250.23

225.91

246.24

249.85

320.15

359.67

290.89

442.32

491.34

335.16

362.9

375.25

389.88

413.63

361.38

410.59

373.73

295.07

296.02

304

300.96

308.18

311.41

316.54

BLI

15.37

15.03

13.89

12.55

13.67

13.88

17.77

20

16.14

24.64

27.25

18.69

20.12

20.82

21.69

22.98

20.09

22.8

20.77

16.37

16.44

16.89

16.72

17.12

17.3

17.59

BLI as
%

2:36:00 AM

2:30:00 AM

2:24:00 AM

2:18:00 AM

2:12:00 AM

2:06:00 AM

2:00:00 AM

1:54:00 AM

1:48:00 AM

1:42:00 AM

1:36:00 AM

1:30:00 AM

1:24:00 AM

1:18:00 AM

1:12:00 AM

1:06:00 AM

1:00:00 AM

12:54:00 AM 160.6

12:48:00 AM 159.5

12:42:00 AM 154.74

12:36:00 AM 149

12:30:00 AM 143.14

12:24:00 AM 136.32

12:18:00 AM 128.84

12:12:00 AM 121.88

12:06:00 AM 116.84

12:00:00 AM 115.58

11:54:00 PM 113.5

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/18/2008

6/17/2008

113.04

115.06

116.42

121.48

128.44

135.92

142.8

148.66

154.46

159.24

160.28

160.14

159.86

159.82

160.72

160.16

160.4

160.3

160.32

160.32

161.28

165.18

168.58

171.08

171.82

174.18

174.78

174.94

174.92

MS
Throttl
e Pr
MS
Pree

112.09

114.28

115.16

119.99

126.99

134.46

141.34

147.28

152.91

157.91

159.48

159.25

159.01

158.76

159.75

159.37

159.52

159.39

159.44

159.43

160.16

163.84

167.44

170.05

170.73

172.98

173.95

173.99

173.97

Compiled By Recommissioning Group

160.4

160.08

159.96

160.9

160.36

160.58

160.5

160.52

160.54

161.48

165.38

168.74

171.16

171.94

174.32

174.98

175.16

175.12

2:42:00 AM

6/18/2008

Drum
Pr

Time

Date

NTPC /TSTPS

395.59

396.6

397.14

398.04

400.05

402.97

405.7

407.86

409.05

409.59

408.84

406.32

403.76

402.32

403.9

405.52

406.24

406.78

407.04

407.36

407.68

408.62

410.17

411

411.61

412.87

413.84

412.65

410.71

MS Hdr
Temp

32.46

35.22

32.08

20.11

19.07

23.28

19.27

23.12

18.66

23.2

31.81

32.97

31.44

17.67

22.02

30.32

27.86

30.22

30.43

30.84

26.41

16.49

18.92

16.58

20.7

21.74

31.54

32.26

32.14

BP 1

32.51

35.16

32.13

20.1

19.25

23.47

19.14

23.15

19.02

23.62

32.13

33

31.7

17.55

21.85

30.2

27.78

30.1

30.5

30.69

26.49

16.61

18.71

16.63

20.87

21.86

31.46

32.41

32.13

BP 2

2.55

2.62

2.52

2.56

2.6

2.56

2.62

3.51

3.72

3.74

4.21

4.21

4.88

5.16

5.19

5.2

5.2

5.2

5.19

5.2

5.19

5.22

5.21

5.21

5.2

5.2

5.2

5.19

5.2

HRH
Press

379.75

382.59

385.69

386.55

388.42

391.27

393.82

396.96

399.33

401.96

405.34

407.65

408.84

408.62

409.09

410.1

410.85

411.5

412.04

412.62

412.94

413.08

413.7

414.52

415.64

417.08

419.02

420.46

421.18

HRH Hdr
Temp

385.27

385.52

388.12

387.13

389.42

392.65

394.82

399.59

401.45

403.56

406.6

407.77

407.71

406.53

405.23

408.08

408.39

410.13

410.32

410.94

411.37

410.81

413.79

415.09

418

420.79

422.72

425.13

422.1

RH Metal
temp Max

44.71

49.05

39.8

32.31

35.15

38.99

39.64

31.35

32.63

31.79

41.78

41.73

34.64

20.18

26.14

30.16

27.35

29.34

29.68

30.33

28.07

26.06

27.59

25.82

28.52

29.47

36.68

37.24

37.09

4,099.80

4,133.40

4,095.00

4,132.80

4,148.40

4,244.40

4,401.00

4,475.40

4,553.40

4,606.20

4,656.00

4,702.80

4,772.40

4,577.40

4,579.20

4,696.20

4,716.60

4,723.20

4,731.60

4,725.60

4,720.20

4,686.60

4,681.80

4,749.00

4,752.00

4,768.80

4,816.80

4,876.20

4,879.80

MDBFP
speed

Page 84

50.88

55.06

46.29

39.46

41.97

45.29

45.9

38.7

39.89

38.99

48.12

47.86

41.66

27.56

34.14

37.65

35.17

37.05

37.42

37.98

35.76

33.91

35.52

33.64

36.33

37.17

43.22

43.83

43.69

LPBP 1 LPBP 2

Annual Overhauling Report U 6


23rd May08 to 18rd June08

265.2

237.32

262.99

212.67

195.84

215.39

214.2

227.97

243.27

239.7

273.02

293.42

336.09

232.05

226.44

288.83

268.6

261.46

265.03

262.14

268.09

238.68

239.36

291.04

257.89

253.47

284.75

314.84

314.5

Feed at
ECO

13.56

23.31

45.75

127.06

81.06

55.69

82.06

12.06

41.75

27.69

-46.75

-74.69

-78.88

38.38

-12.13

-67.75

66.94

68.88

61.19

47

32.44

75.19

-39.19

-6.81

60.19

14.69

-82.31

-91.31

-77.5

Drum
lvl

671.44

652.63

674.96

631.18

620.07

646.03

656.26

674.52

698.06

700.59

734.8

759.55

799.92

686.73

687.17

752.95

731.83

732.71

735.57

734.91

736.56

709.83

711.92

759.99

731.61

729.3

764.17

793.54

792.11

MDBF
P Suc
flow

264.67

238.26

262.96

212.04

194.94

215.27

213.37

227.05

242.44

239.59

272.84

294.12

335.92

231.42

225.91

288.61

268.28

261.44

265.43

262.2

267.71

238.64

239.97

291.27

258.02

252.89

285

314.64

314.83

Total
Feed

261.82

285.57

254.6

239.59

220.02

228.57

230.85

236.74

233.7

244.15

280.82

276.64

263.53

233.89

247

258.02

250.8

255.55

257.64

260.11

248.9

239.78

249.66

242.82

250.99

254.79

285.19

284.24

281.77

BLI

14.56

15.85

14.17

13.31

12.22

12.7

12.83

13.15

12.98

13.56

15.62

15.37

14.65

12.99

13.73

14.33

13.93

14.21

14.32

14.46

13.83

13.32

13.85

13.49

13.95

14.16

15.84

15.8

15.65

BLI as
%

9:48:00 PM

9:42:00 PM

9:36:00 PM

9:30:00 PM

9:24:00 PM

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

85.42

86.36

86.24

87.22

77.16

71.2

77.76

71.92

32.6

34.26

35.56

36.96

41.5

47.68

54.28

60.76

32.18

33.82

35.12

36.5

40.9

47.08

53.62

60.08

65.74

79.82

80.7

66.44

80.28

84.04

81.14

84.82

86.52

86.5

87.08

87.36

89.44

94.72

100.28

102.16

104.44

89.9

95.2

100.78

102.78

104.92

108.56

111.9

MS
Throttl
e Pr
MS
Pree

31.37

33.16

34.49

35.73

39.83

46.06

52.18

58.81

64.33

69.97

76

79.24

79.47

83.21

85.79

85.77

84.98

85.66

88.27

93.6

99.09

101.41

103.43

107.23

110.93

Compiled By Recommissioning Group

9:54:00 PM

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

11:36:00
PM
11:30:00
PM
11:24:00
PM
11:18:00
PM
11:12:00
PM
11:06:00
PM
11:00:00
PM
10:54:00
PM
10:48:00
PM
10:42:00
PM
10:36:00
PM
10:30:00
PM
10:24:00
PM
10:18:00
PM
10:12:00
PM
10:06:00
PM
10:00:00
PM

11:42:00 PM 109.06

6/17/2008

Drum
Pr

11:48:00 PM 112.5

Time

6/17/2008

Date

NTPC /TSTPS

278.55

283.92

290.36

296.48

303.1

311.85

322.08

332.98

343.03

351.42

358.08

364.05

368.66

371.4

374.96

378.27

380.11

380.72

381.87

383.35

385.83

388.46

389.86

391.34

393.86

MS Hdr
Temp

32.48

36.15

36.16

36.16

36.15

36.16

36.16

36.16

36.18

36.16

32.92

39.56

39.67

37.58

39.46

41.21

42.09

38.74

32.91

31.92

26.05

36.64

32.39

29.22

32.67

BP 1

31.86

36.51

36.5

36.5

36.45

36.4

36.36

36.32

36.3

36.27

33.32

39.79

39.85

37.83

39.68

41.35

42.4

38.98

36.22

32.31

26.31

36.67

32.43

29.54

32.82

BP 2

0.16

0.61

0.7

0.72

0.91

1.19

1.51

2.11

2.71

3.13

2.73

2.6

2.57

2.61

2.61

2.58

2.56

2.59

2.55

2.53

2.58

2.6

2.61

2.52

2.66

HRH
Press

200

200

200

200

205.54

215.66

227

239.42

252.02

264.8

274.63

289.86

306.2

314.59

325.42

336.69

345.3

350.23

353.54

355.27

357.97

363.94

367.62

370.78

374.96

HRH Hdr
Temp

239.01

249.49

259.28

266.04

273.61

283.03

294.38

307.4

318.25

328.6

334.12

341.5

352.41

351.48

356.44

361.71

366.23

364.13

362.33

362.2

363.82

369.64

374.23

375.97

379.13

RH Metal
temp Max

23.32

23.2

22.85

23.47

23.65

24.55

24.74

20.42

19.03

18.03

19.71

38.83

43.96

37.51

44.53

51.47

56.77

42.75

32.23

28.11

25.78

44.94

35.94

35.16

49.24

3,271.80

3,344.40

3,423.00

3,430.80

3,436.20

3,412.20

3,480.60

3,505.80

3,621.60

3,640.80

3,798.00

3,810.00

3,729.00

3,642.60

3,847.20

3,870.60

3,897.60

3,888.00

3,796.20

3,830.40

3,827.40

3,780.60

3,891.60

3,742.20

3,870.60

MDBFP
speed

Page 85

31.07

30.99

30.85

31.5

31.7

32.49

32.77

28.12

26.65

25.6

27.37

45.37

50.11

44.23

50.96

57.31

62.57

48.85

39.17

35.57

33.55

51.1

42.72

42.25

55.57

LPBP 1 LPBP 2

Annual Overhauling Report U 6


23rd May08 to 18rd June08

43.35

106.76

83.3

81.09

75.48

114.41

151.3

96.56

148.07

162.35

196.18

162.01

255.34

194.31

258.74

252.11

254.15

249.9

207.74

156.91

194.14

209.27

251.26

187.85

228.48

Feed at
ECO

10.25

-53.25

33.13

-5.75

19.63

-2.88

-0.94

85.56

-47.69

-61.13

-50.81

8.88

-127

-54.63

-6.94

-0.75

-19.44

55.56

58.44

81.25

-10.06

14.38

43.56

59.06

1.38

Drum
lvl

393.58

465.85

450.01

442.2

444.84

481.58

515.9

469.37

525.03

533.83

588.61

564.74

634.15

563.75

641.3

642.4

645.26

634.37

591.47

547.36

584.65

591.47

642.84

576.29

620.84

MDBF
P Suc
flow

43.7

106.02

83.79

81.89

75.43

114.38

149.91

96.33

148.01

162.83

197.98

162.26

255.93

193.42

258.78

252.32

254.22

247.38

207.48

156.75

194.56

209.38

251.37

188.67

228.76

Total
Feed

168.34

177.46

179.74

180.69

186.58

195.13

204.63

213.18

220.97

227.81

218.12

276.64

267.52

269.8

284.81

295.83

303.62

267.14

235.98

232.37

227.05

277.97

245.86

248.14

287.66

BLI

9.33

9.84

9.96

10.02

10.37

10.85

11.35

11.84

12.29

12.64

12.12

15.37

14.9

14.97

15.82

16.45

16.87

14.85

13.1

12.9

12.63

15.43

13.65

13.78

15.98

BLI as
%

9:18:00 PM

9:12:00 PM

9:06:00 PM

9:00:00 PM

8:54:00 PM

8:48:00 PM

8:42:00 PM

8:36:00 PM

8:30:00 PM

8:24:00 PM

8:18:00 PM

8:12:00 PM

8:06:00 PM

8:00:00 PM

7:54:00 PM

7:48:00 PM

7:42:00 PM

7:36:00 PM

7:30:00 PM

7:24:00 PM

7:18:00 PM

7:12:00 PM

7:06:00 PM

7:00:00 PM

6:54:00 PM

6:48:00 PM

6:42:00 PM

6:36:00 PM

6:30:00 PM

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

9.74

10.96

12.24

13.44

14.6

15.76

16.96

18.2

19.48

20.36

21.02

21.62

22.24

22.92

23.54

24.32

25

25.64

25.94

26.06

26.3

26.52

26.72

26.98

27.34

27.7

28.32

28.84

29.66

Drum
Pr

0.2

0.18

0.18

0.2

0.2

0.2

0.18

0.2

0.24

0.78

8.26

14.28

17.14

23.08

23.92

24.6

25.22

25.4

25.52

25.8

26.02

26.24

26.58

26.94

27.36

28.02

28.54

29.34

MS
Throttl
e Pr
MS
Pree

0.23

2.21

7.13

13.46

16.51

22.23

23.38

24.07

24.68

24.93

25.02

25.34

25.49

25.85

26.06

26.46

26.8

27.54

28.03

28.73

Compiled By Recommissioning Group

Time

Date

NTPC /TSTPS

200

200

200

200

200

200

200

200

200

200

200

200

200

207.34

220.41

226.03

227.61

229.38

238.48

247.92

252.6

256.81

260.55

263.86

266.6

269.16

271.53

273.73

275.67

MS Hdr
Temp

1.77

1.8

1.76

1.78

1.77

1.34

0.92

0.96

0.95

0.88

0.43

0.16

0.12

0.2

0.87

6.18

7.9

9.77

20.55

21.68

21.67

21.67

23.17

30.65

30.65

30.65

30.65

30.65

30.65

BP 1

0.44

0.44

0.44

0.44

0.44

0.17

1.36

5.91

8.36

9.31

24.15

25.32

25.23

25.17

25.95

30.12

30.12

30.07

30.04

29.98

29.91

BP 2

0.06

0.63

1.49

2.03

0.32

HRH
Press

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

HRH Hdr
Temp

120.96

115.69

111.54

108.31

107.82

107.57

108.25

110.61

115.01

116.5

119.35

121.09

123.19

124.87

126.73

129.83

133.24

142.29

164.61

185.38

197.66

205.72

214.95

219.73

224.07

226.49

230.27

231.88

234.36

RH Metal
temp Max

0.01

0.01

0.01

0.01

0.01

0.58

0.01

0.01

0.01

0.01

0.01

0.02

0.01

0.01

0.01

0.01

0.01

1.12

16.09

22.47

22.04

22.31

22.11

22.69

22.39

3,339.00

3,340.80

3,334.20

3,105.00

2,989.80

2,984.40

3,015.00

3,028.20

3,021.60

3,006.60

3,127.80

3,261.00

3,252.60

3,257.40

3,246.00

3,213.00

3,203.40

3,213.60

3,199.80

3,211.80

3,207.00

3,183.00

3,189.00

3,232.80

3,243.00

3,220.20

3,226.80

3,253.20

3,256.80

MDBFP
speed

Page 86

1.35

1.34

1.33

1.27

1.2

1.24

1.25

2.5

1.54

1.52

1.49

1.44

1.4

1.36

1.36

1.36

1.34

1.34

1.33

1.34

1.39

3.64

22.5

29.97

29.57

29.94

29.68

30.21

30.06

LPBP 1 LPBP 2

Annual Overhauling Report U 6


23rd May08 to 18rd June08

32.3

32.64

35.19

28.05

41.99

39.61

33.32

29.92

31.79

33.15

45.05

48.28

47.26

48.28

93.84

39.27

63.24

73.95

57.29

59.16

58.99

58.14

58.82

138.72

43.86

80.24

75.48

42.67

40.97

Feed at
ECO

24.38

-11.06

36.44

59

71.06

79.38

68.5

61

60.38

63.63

25.19

21.56

6.38

-17.69

-26.81

24.31

-0.31

18.81

43.94

-9.19

28.13

34.19

-18.94

-23.06

121.69

38.25

131.19

115.63

70.75

Drum
lvl

393.25

404.69

401.39

365.42

375.32

372.79

358.49

378.07

382.47

365.64

395.12

411.95

405.13

415.47

453.42

395.89

407.88

425.59

403.04

413.27

412.61

407

407.55

477.4

396.11

431.42

427.13

395.34

399.52

MDBF
P Suc
flow

32.87

33.25

34.39

29.64

43.51

38

33.44

34.01

31.73

33.44

45.03

49.02

48.45

47.88

94.43

39.71

63.27

74.86

56.43

56.81

59.09

57.95

59.47

137.94

43.51

79.42

74.29

42.18

41.23

Total
Feed

35.15

25.08

14.82

25.84

24.7

23.56

19

26.98

36.1

123.31

159.98

137.75

127.3

125.59

125.97

132.81

133.95

135.66

150.48

151.81

153.9

153.9

154.66

157.13

156.75

157.32

157.89

158.84

159.41

BLI

1.96

1.39

0.84

1.44

1.38

1.3

1.06

1.5

6.86

8.89

7.65

7.07

6.98

7.11

7.4

7.39

7.57

8.39

8.49

8.5

8.52

8.6

8.71

8.72

8.8

8.78

8.82

8.83

BLI as
%

6:24:00 PM

6:18:00 PM

6:12:00 PM

6:06:00 PM

6:00:00 PM

5:54:00 PM

5:48:00 PM

5:42:00 PM

5:36:00 PM

5:30:00 PM

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

6/17/2008

1.24

1.44

1.66

1.9

2.42

3.08

3.86

4.8

6.4

8.24

Drum
Pr

0.22

0.22

0.22

0.22

0.22

0.22

0.22

0.22

0.22

0.22

MS
Throttl
e Pr

Compiled By Recommissioning Group

Time

Date

NTPC /TSTPS

MS
Pree

200

200

200

200

200

200

200

200

200

200

MS Hdr
Temp

1.78

1.77

1.77

1.76

1.78

1.77

1.77

1.76

1.76

1.78

BP 1

0.44

0.44

0.44

0.44

0.44

0.44

0.44

0.44

0.44

0.44

BP 2

HRH
Press

200

200

200

200

200

200

200

200

200

200

HRH Hdr
Temp

96.6

96.91

98.77

105.03

113.21

116.13

120.03

121.64

123.38

125.74

RH Metal
temp Max

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

3,142.80

3,141.00

3,398.40

3,510.60

3,490.20

3,582.00

3,616.80

3,590.40

3,579.60

3,337.80

MDBFP
speed

Page 87

1.31

1.32

1.32

1.33

1.34

1.35

1.35

1.34

1.34

1.35

LPBP 1 LPBP 2

Annual Overhauling Report U 6


23rd May08 to 18rd June08

1.36

9.86

4.93

20.91

27.88

31.79

32.64

32.64

45.56

70.21

Feed at
ECO

250

188.5

158.06

145.88

103.63

89.13

108.81

106.81

81.75

162.69

Drum
lvl

342.76

354.31

384.56

411.95

411.84

425.92

418.33

434.5

427.9

419.1

MDBF
P Suc
flow

0.57

10.45

7.03

19.38

29.26

26.41

30.4

32.49

40.28

70.68

Total
Feed

40.28

40.47

40.47

40.28

39.71

39.33

39.14

39.14

39.14

38.57

BLI

2.24

2.24

2.25

2.23

2.21

2.18

2.18

2.17

2.17

2.14

BLI as
%

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

CW Pump Discharge Valve Operation Check


Description
Full close to
Crack open in
Sec
Crack Open to full
open in Sec
Full open to full
close (Normal) in
Sec
Emergency close
in Sec

Local

6A

Remote

04:07

03:00

31:00
41:16

Local

6B

Remote

04:30

04:00

30:20

33:43

33:60

40:07

48:30

49:00

35:46

Main Turbine gland steam Pr. Controller manual checking parameter


-94.12
-73.53
-55.64
-25.17
-0.57
25.61
54.71
70.66
99.8

Compiled By Recommissioning Group

Leak off v/v


97.21
73.79
54.22
20.11
0.59

Supply v/v

21
52.62
69.78
1000

Page 88

NTPC /TSTPS

Annual Overhauling Report U 6


23rd May08 to 18rd June08

Generator air Leak test Parameters

KSC
4.00
3.98
3.96
3.94
3.94
3.91
3.90
3.89
3.88
3.87
3.87
3.86

Cold gas
Temp.(Left)
0C
35 .0
35.14
35.14
34.89
34.6
34.4
34.4
34.4
34.4
34
34.40
34.40

Cold gas
Temp.(Right)
0C
35.0
34.65
34.40
34.16
34.1
33.6
33.6
33.90
33
33.67
33.67
33.67

3.72
3.93
3.92
3.91
3.90
3.88

32
33.92
33.43
33.43
33.43
33.43

32
33.13
32.70
32.70
32.70
32.70

3.72
3.71
3.70
3.69
3,68
3.65
3.59

32.45
32.45
32.45
32.45
32.45
32.45
31.48

31.96
31.96
31.96
31.96
31.96
31.96
31.72

Time

Air pressure

14/06/08
02:30
03:30
04:30
05:30
13:00
15:30
16:00
17:00
18:00
18:50
19:25
20:00
15/6/08
10:00
18:00
19:00
19:30
20:00
21:00
16/6/08
09:00
10:45
11:40
12:37
13:40
16:30
21:00

Compiled By Recommissioning Group

Hot gas Temp A


&B

C&D

Page 89