Job Description
Drag Chain Feeder 306 has to be taken in service.
Soot Blower 2,3 & 4 lRSB has to be commissioned.
Electromatic safety valve has to be commissioned.
MS Flow,TG I/L Flow , Feed Water Flowcondensate flow transmitter has to be checked.
Frequent failure of Loop seal blower bellow has to be checked by engineering.
ID Fan Platform has to be provided.
ESP I/L Duct insulation and cladding sheet has to be provided.
ID Fans Casing has to be insulated.
Soot Blower Control Valve Feed Back Position Transmitter has to be replaced.
Bed Material top up system has to be erected & Commissioned.
Bed material RAV valve has to be hook up in DCS.
Loop Seal Blower Delivery valve and NRV is passing. It has to be arrested.
Lime Stone System has to be commissioned.
Seal Air Blower has to be hook up in DCS.
Bed damaged thermo well has to be replaced.
Bed Pressure transmitter has to be taken in Service.
SA Fan RPM has to be hook up in DCS.
Burner-4 sensor,ignitor has to be provided and it has to be commissioned.
Cyclone Down Leg, lift leg Pressure transmitter is showing (out of saturation )erratic value. It has to
Boiler auto combustion logic has to be taken in line.
Both Bed ash cooler ash shifting not proper
CCTV Camera fixed in boiler furnace side
CHP - Convayor belt hood to be provided
Stand by crusher , screen , conveyor & Ground hopper to be commission.
ACC Fin cleaning system to be completed.
Boiler , Feed and steam piping insulation to be completed.
Operation level drian pipe insulation to be done.
HP Heater water releief valve & safety valve leakage to be arreseted
Bed ash silo & seeving machine to be commission
All DE System to be commission
All Piping cooler coding to be provided
Bunker viberator
Remarks
Date : 30-08-2013
Note:
Line 1 bay SF6 Gas leakage to be arrested.
GT-1 Bay Y Phase CT Oil leakage to be arrested.
GT-1 Bay Y Phase PT Oil Level low its to be checked.
CHP PUNCH LIST
1.CHP incomer -1 & Bus coupler breakers tripped during crusher ON its to be
checked.
2.Buchholz relay cover is not open due to transformer neutral plate is
disturbed.
3. Transformer wheel permanent support to be provided.
4.In feeder NO: 8F1 & 8F2 power contacts fixed & moving contacts is not
available.
5.In Feeder NO: 8F1 OLR is not available.
6.Fire fighting system put in service.
SWITCH YARD PUNCH LIST
1.One number battery to be replaced in battery charger.
2.12&25MVA Tfr tap changer put in Auto mode.
3.In line 1 feeder vector surge relay put in service with generator
breaker interlock(blocking input).
4.In line feeder 110kv incoming volt meter auxiliary power supply
changed to UPS supply.
5.Switch yard lighting pole height to be reduced and 3 nos poles to be
re- erected.
6.Lease line (land line) to be provided in switch yard control panel.
7.Line -1 bay SF6 Gas pressure leakage to be checked by service engineer.
8.GT-1 bay B-phase CT OIL LEAK,PT oil level low its to be checked by
service engineer.
9.Line-1 Breaker Synchronizing trial to be taken.
10.Bus-coupler breaker put in service for line, GT & SPT breaker.
11.89T isolator states to be added for bus-coupler breaker for generator
parallel mode feedback.
Date:29.08.2013
provide.
TurbinemainsteamflowtransmitterFIT_2003tobecheckedasperdatashee
Turbinebleed-3steamflowtransmitterFIT_2022tobecheckedasperdatash
Turbinebleed-2steamflowtransmitterFIT_2018tobecheckedasperdatash
Turbinebleed-1steamflowtransmitterFIT_2014tobecheckedasperdatash
CEPrecirculationvalves(CV-6007A,6007B)tobetakentoautomode.
Minimumrecirculationflowtransmitter(FT_6021)tobecheckedasperdata
LPHeateroutletflowtransmitter(FT_6022)tobecheckedasfordatasheet.
LPHeateroutletflowtransmitter(FT_6022)impulselineisolationvalvesto
HPheaterleveltransmittersLIT_2060Atobechecked.
MainlubeoiltankleveltransmitterLIT_2033tobechecked.
Accductspraycontrolvalve(FV-6003)open/closesidesF/Bsettingispendi
CEP100%recirculationvalveCV-6007Bopen/closesideF/Bsettingispend
CEP50%recirculationvalveCV-6007Bopen/closesideF/Bsettingispendin
Ejectorinlettemperaturegauge&outlettemperaturegaugetobechecked.
TSPandvibrationpanelinsidecableglandentryplategotdamagedtocheck.
Turbineoverheadtanklevelsswitchtobechecked.
Dearatorpressurecontrolvalvenotworkingproperly.
DrumleveltransmitterLT-1044Cnotmatchingwithotherstwoleveltransmit
Feedwaterandmainsteamflowstransmitterstobecheckedasperdatasheet
Damperpositionfeedbackstransmitterstobefixedinallfans(ID,SA,PA).
Instrumentaircompressorautostart/stoptobetakentoDCS.
AllDCFZSStobetakeninline.
CoalbunkerLTstobecalibratingproperly.
CoalbunkerLT(4thone)notfixedtobechecked.
BAC1controlvalveopenfeedbacklimitswitchtobeinstalled.
BAC1&2coolingwaterlinecontrolvalvetobetakeninline.AnditsAFRp
CBDtankleveltransmittertobetakeninDCS.
Bedpressuretank&PDITtransmitterpurgingairlinepermanentsupportto
Sootblowerautologictobechecked.
SOX,NOXanalysersworktobecomplete.
SOX,NOXanalysersairpurgingkitcanopyworktobedone.
SWASsystemlineupworkpending.
EMRVsafetyvalvetobecommissioned.
CycloneDPtransmitterPDIT-1174,PDIT-1169&PDIT-1181tobechecked.
Cyclone2flowtransmitterFT-1177tobecorrected.
PAtofurnacecontroldamperFV1103positionfeedbacktobecorrected.
SAtofurnacecontroldamperFV1092(SAtofurnace)positionfeedbacktob
Coaltoairbustlecontroldamperpositionfeedbacktobecorrected.
Burner4tobecommissionedandscannerbox,signal&controlcabletagpla
AllLRSB&RSBmotorstrailtobedonethroughDCS.
Cycloneseparator1PDIT-1169purgingairlinetobechanged.
BoileralljunctionboxAJB,DJB,Non-JB&powerJBsearthlingtobeprovid
BoilersideallMOVspowercable,controlcable&MOVtagplatetobefixe
BEDTemperatureelementstobechecked(TE_1105,TE_1106,TE_1110).
Coldpaflowtobac_2compartment2flowtransmitters(FIT_1284).Tocheck
Ashconditioner&rotaryvenefeeder1&2ZSStobetakenline.
SiloairblowerdischargeairtemperatureRTDcabletobereplaced.
AHSallvesselslevelprobetobecalibrate.
Bedashsiloleveltransmittertobetakenline.
Flyashsilo#1leveltransmittercalibrationdatasheettobehandover.
Bedashsiloventfiltertobetakenline.
Allashhandlingsystems(bedash,APH#1and2,andESPsystems)levelprobes,do
switches,TAGSnotobeassigninDCSgraphicspage.
Bedashsiloswitchvalveandbedmaterialhoppertobetakentoline.
echeckedasperdatasheet.
obecheckedasperdatasheet.
obecheckedasperdatasheet.
obecheckedasperdatasheet.
takentoautomode.
tobecheckedasperdatasheet.
checkedasfordatasheet.
selineisolationvalvestobereplacedsuitablevalves.
checked.
sidesF/Bsettingispendingtobechecked.
sesideF/Bsettingispendingtobechecked.
sideF/Bsettingispendingtobechecked.
regaugetobechecked.
ategotdamagedtocheck.
hotherstwoleveltransmitter&ittobechecked.
checkedasperdatasheets.
inallfans(ID,SA,PA).
entoDCS.
beinstalled.
keninline.AnditsAFRpressuregaugetobefixed(HV1303,HV1304).
nepermanentsupporttobefixed(3nosofPT&PDIT)
obedone.
PDIT-1181tobechecked.
dbacktobecorrected.
ace)positionfeedbacktobecorrected.
tobecorrected.
al&controlcabletagplatestobefixed.
bechanged.
JBsearthlingtobeprovided.
&MOVtagplatetobefixed.
5,TE_1106,TE_1110).
tters(FIT_1284).Tochecked.
nline.
replaced.
ehandover.
Psystems)levelprobes,domevalveSOVS,ConveyingSOVvalves,andpressures
kentoline.