Drag Chain Feeder 306 has to be taken in service.
Soot Blower 2,3 & 4 lRSB has to be commissioned.
Electromatic safety valve has to be commissioned.
MS Flow,TG I/L Flow , Feed Water Flowcondensate flow transmitter has to be checked.
Frequent failure of Loop seal blower bellow has to be checked by engineering.
ID Fan Platform has to be provided.
ESP I/L Duct insulation and cladding sheet has to be provided.
ID Fans Casing has to be insulated.
Soot Blower Control Valve Feed Back Position Transmitter has to be replaced.
Bed Material top up system has to be erected & Commissioned.
Bed material RAV valve has to be hook up in DCS.
Loop Seal Blower Delivery valve and NRV is passing. It has to be arrested.
Lime Stone System has to be commissioned.
Seal Air Blower has to be hook up in DCS.
Bed damaged thermo well has to be replaced.
Bed Pressure transmitter has to be taken in Service.
SA Fan RPM has to be hook up in DCS.
Burner-4 sensor,ignitor has to be provided and it has to be commissioned.
Cyclone Down Leg, lift leg Pressure transmitter is showing (out of saturation )erratic value. It has to
Boiler auto combustion logic has to be taken in line.
Both Bed ash cooler ash shifting not proper
CCTV Camera fixed in boiler furnace side
CHP - Convayor belt hood to be provided
Stand by crusher , screen , conveyor & Ground hopper to be commission.
ACC Fin cleaning system to be completed.
Boiler , Feed and steam piping insulation to be completed.
Operation level drian pipe insulation to be done.
HP Heater water releief valve & safety valve leakage to be arreseted
Bed ash silo & seeving machine to be commission
All DE System to be commission
All Piping cooler coding to be provided
Bunker viberator

Remarks

Date : 30-08-2013

PMCC PUNCH LIST


1.All Incomer Feeder Under voltage relay put in service.
2.DT 1- ,DT-2&DT-3 transformers permanent wheel stopper to be
Provided.
3.All damaged door to be corrected in PMCC panel.
4.Suitable size washer to be provided in outgoing and incoming for PMCC,
BTG, EMCC, VFD and DG Panel.
5.All breaker panel TNC switch put in service.
6.In BTG MCC loop seal blower motor feeders ammeters reading showing
erratic value.
7.In BTG MCC 6F3,8F2 feeder IMCC relay faulty, its to be replaced.
8.In VFD panel TOP duct and Exhaust fan provision to be provided.
9.All lighting DB failure RCCB&MCB ,lighting to be replaced.
10.Abnormal sound coming from ACC incoming cable in PMCC.
11.In ID FAN 1& 2 local control panel RPM Meter shows wrong its to be
corrected.
12.DT-2 bus duct is very hot during above 2000A load, its to be checked.
ESP PUNCH LIST
1. All Manual door, ESP control panel castle interlock to be provided.
2. All Transformer Temp indicators reading shows wrong, its to be
corrected..

6.6KV PANEL PUNCH LIST


COMMON PANEL.
1.12MVA TR IN COMING BREAKER ON &OFF to be provided from Relay or
DCS.
2.In boiler feed pump-2 neutral side CT to be provided and differential
protection put in service.
UNIT-1 panel;
1.All HT motors local operation to be provided through DCS.
PUNCH LIST FOR TURBINE AREA
1. Thermostat control to be provided Main oil tank heaters.
2. Adequate cable size to be provided for oil centrifuge control panel.
625KVA DG SET PUNCH LIST
1. Emergency DG Diesel tank to engine diesel line to be replaced.
DCS DISPLAY
1. In synchronizing panel Flasher display put in service.
2.Double bus voltage display to be corrected in auto synchronizer.
3.Spring charge & gas pressure healthy indication to be provided for GT-1,GT2 bay in synchronizing panel.
4. Generator Rotating diode failure indication to be provided in synchronizing pane
5.Generator trip due to turbine trip indication to be provided in
synchronizing panel.

Note:
Line 1 bay SF6 Gas leakage to be arrested.
GT-1 Bay Y Phase CT Oil leakage to be arrested.
GT-1 Bay Y Phase PT Oil Level low its to be checked.
CHP PUNCH LIST
1.CHP incomer -1 & Bus coupler breakers tripped during crusher ON its to be
checked.
2.Buchholz relay cover is not open due to transformer neutral plate is
disturbed.
3. Transformer wheel permanent support to be provided.
4.In feeder NO: 8F1 & 8F2 power contacts fixed & moving contacts is not
available.
5.In Feeder NO: 8F1 OLR is not available.
6.Fire fighting system put in service.
SWITCH YARD PUNCH LIST
1.One number battery to be replaced in battery charger.
2.12&25MVA Tfr tap changer put in Auto mode.
3.In line 1 feeder vector surge relay put in service with generator
breaker interlock(blocking input).
4.In line feeder 110kv incoming volt meter auxiliary power supply
changed to UPS supply.
5.Switch yard lighting pole height to be reduced and 3 nos poles to be
re- erected.
6.Lease line (land line) to be provided in switch yard control panel.
7.Line -1 bay SF6 Gas pressure leakage to be checked by service engineer.
8.GT-1 bay B-phase CT OIL LEAK,PT oil level low its to be checked by
service engineer.
9.Line-1 Breaker Synchronizing trial to be taken.
10.Bus-coupler breaker put in service for line, GT & SPT breaker.
11.89T isolator states to be added for bus-coupler breaker for generator
parallel mode feedback.

12.UAT Put in Service


13.Ash Compressor Poor Condition.
14.Instrument Air Compressor 3 put in service.

Tulsyan Site WATER TREATMENT PLANT punch list


Date:29.08.2013
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Acid unloading pump to be commissioned with acid


N- pit both pumbs suction & discharge line support to be provide.
N- pit both pumps suction line foot valve modification to be done.
Agitator or air blower should be provied in N-pit to be confirm.
CT Make up pump A&B NRV passing to be arrested.
RO Cleaning jumbo catridge filter top side air releasing nob to be provide.
MGF feed pump A,B&C pumps NRV passing to be corrected.
UF back wash pump A&B NRV passsing to be arrested.
Lime pre agitator installed to be done.
Sludge transfer pump A&B not yet commissioned
FRB grating for WTP trenches to be done.
Space provision in RO skid to additional 4nos.of membranes.
All dosing tanks level switch to be checked.
Effulent tank level switch to be checked.
Effulent tank PH sensor to be checked.
DG tank level switch to be checked.
Fast flush tank level switch to be checked.
Raw water tank level transmeter to be checked.

Date:29.08.2013

provide.

oTURBINE PUNCH POINTS

TurbinemainsteamflowtransmitterFIT_2003tobecheckedasperdatashee

Turbinebleed-3steamflowtransmitterFIT_2022tobecheckedasperdatash

Turbinebleed-2steamflowtransmitterFIT_2018tobecheckedasperdatash

Turbinebleed-1steamflowtransmitterFIT_2014tobecheckedasperdatash
CEPrecirculationvalves(CV-6007A,6007B)tobetakentoautomode.

Minimumrecirculationflowtransmitter(FT_6021)tobecheckedasperdata
LPHeateroutletflowtransmitter(FT_6022)tobecheckedasfordatasheet.

LPHeateroutletflowtransmitter(FT_6022)impulselineisolationvalvesto
HPheaterleveltransmittersLIT_2060Atobechecked.
MainlubeoiltankleveltransmitterLIT_2033tobechecked.

Accductspraycontrolvalve(FV-6003)open/closesidesF/Bsettingispendi

CEP100%recirculationvalveCV-6007Bopen/closesideF/Bsettingispend

CEP50%recirculationvalveCV-6007Bopen/closesideF/Bsettingispendin
Ejectorinlettemperaturegauge&outlettemperaturegaugetobechecked.

TSPandvibrationpanelinsidecableglandentryplategotdamagedtocheck.
Turbineoverheadtanklevelsswitchtobechecked.
Dearatorpressurecontrolvalvenotworkingproperly.

oBOILER PUNCH POINTS

DrumleveltransmitterLT-1044Cnotmatchingwithotherstwoleveltransmit

Feedwaterandmainsteamflowstransmitterstobecheckedasperdatasheet
Damperpositionfeedbackstransmitterstobefixedinallfans(ID,SA,PA).
Instrumentaircompressorautostart/stoptobetakentoDCS.
AllDCFZSStobetakeninline.
CoalbunkerLTstobecalibratingproperly.
CoalbunkerLT(4thone)notfixedtobechecked.
BAC1controlvalveopenfeedbacklimitswitchtobeinstalled.

BAC1&2coolingwaterlinecontrolvalvetobetakeninline.AnditsAFRp
CBDtankleveltransmittertobetakeninDCS.

Bedpressuretank&PDITtransmitterpurgingairlinepermanentsupportto
Sootblowerautologictobechecked.
SOX,NOXanalysersworktobecomplete.
SOX,NOXanalysersairpurgingkitcanopyworktobedone.
SWASsystemlineupworkpending.
EMRVsafetyvalvetobecommissioned.
CycloneDPtransmitterPDIT-1174,PDIT-1169&PDIT-1181tobechecked.
Cyclone2flowtransmitterFT-1177tobecorrected.
PAtofurnacecontroldamperFV1103positionfeedbacktobecorrected.

SAtofurnacecontroldamperFV1092(SAtofurnace)positionfeedbacktob
Coaltoairbustlecontroldamperpositionfeedbacktobecorrected.

Burner4tobecommissionedandscannerbox,signal&controlcabletagpla
AllLRSB&RSBmotorstrailtobedonethroughDCS.
Cycloneseparator1PDIT-1169purgingairlinetobechanged.

BoileralljunctionboxAJB,DJB,Non-JB&powerJBsearthlingtobeprovid

BoilersideallMOVspowercable,controlcable&MOVtagplatetobefixe
BEDTemperatureelementstobechecked(TE_1105,TE_1106,TE_1110).

Coldpaflowtobac_2compartment2flowtransmitters(FIT_1284).Tocheck

oASH HANDLING SYSTEM PUNCH POINTES

Ashconditioner&rotaryvenefeeder1&2ZSStobetakenline.
SiloairblowerdischargeairtemperatureRTDcabletobereplaced.
AHSallvesselslevelprobetobecalibrate.
Bedashsiloleveltransmittertobetakenline.
Flyashsilo#1leveltransmittercalibrationdatasheettobehandover.

Bedashsiloventfiltertobetakenline.
Allashhandlingsystems(bedash,APH#1and2,andESPsystems)levelprobes,do
switches,TAGSnotobeassigninDCSgraphicspage.
Bedashsiloswitchvalveandbedmaterialhoppertobetakentoline.

echeckedasperdatasheet.

obecheckedasperdatasheet.

obecheckedasperdatasheet.

obecheckedasperdatasheet.

takentoautomode.

tobecheckedasperdatasheet.

checkedasfordatasheet.

selineisolationvalvestobereplacedsuitablevalves.

checked.

sidesF/Bsettingispendingtobechecked.

sesideF/Bsettingispendingtobechecked.

sideF/Bsettingispendingtobechecked.

regaugetobechecked.

ategotdamagedtocheck.

hotherstwoleveltransmitter&ittobechecked.

checkedasperdatasheets.

inallfans(ID,SA,PA).

entoDCS.

beinstalled.

keninline.AnditsAFRpressuregaugetobefixed(HV1303,HV1304).

nepermanentsupporttobefixed(3nosofPT&PDIT)

obedone.

PDIT-1181tobechecked.

dbacktobecorrected.

ace)positionfeedbacktobecorrected.

tobecorrected.

al&controlcabletagplatestobefixed.

bechanged.

JBsearthlingtobeprovided.

&MOVtagplatetobefixed.

5,TE_1106,TE_1110).

tters(FIT_1284).Tochecked.

nline.

replaced.

ehandover.

Psystems)levelprobes,domevalveSOVS,ConveyingSOVvalves,andpressures

kentoline.