Material to be stored
: Ash
Density of material
= 7,85
kN/m3
: r
= 41,0
= 0,62
:K
= 0,46
: ak
= 1,20
: a
= 1,07
: aq
= 1,16
: dc
= 12,000
:d
= 2,240
Height of the vertical silo shaft, measured from the hopper junction
up to the equivalent bulk material surface
: hc
= 11,000
: hh
= 1,683
:h
= 1,369
: hb
= 12,683
Distance between the equivalent bulk material surface and the lowest : ho
point at the base of the bulk material cone
= 1,739
: htp
= 0,000
= 74,3
= 15,7
:A
D
4
= 113,10
m2
:U
= d
= 37,70
: Vc
= Ah
= 1244,07
m3
3. PROPERTIES OF SILO
: Vh
Vh
h(
= 63,04
= V +V
:V
: Wm = V
Page 1 / 15
d
d
d d
+ +
)
2
2
2 2
3
m3
= 1307,11
m3
= 10260,84 kN
l2
l3
h
< 10
d
1,06 OK
= h < 100
12,68 OK
= d < 60
12,00 OK
Based upon the design of the silo structure and its susceptibility to different types of malfunctions, various accuracy
standards are used in the process of determining the influences on silo structures. The silo influences should be determined
in accordance with standardized categories specified in DIN 1055 Part 6. The standardized category of the silo is "2" as the
capacity of it is
100 t<Wm<1000 t (Actual capacity of the silo is 740 t, full height is used for thickness calculations)
h
d
= 0,92
: Phf
=P
: Pwf
=P
: Pho = K z
= 37,98
kN/m2
A
KU
= 10,52
: zo
: YR
= 1
:n
= -1,56
: Pvf
= z'
1
n+1
Characteristic value of the sum total of the wall friction loads for each : pwf
running meter in the circumferential direction of the vertical silo wall
in the case of fill loads
Page 2 / 15
zh
z h
+1
h
z
z h
= P
(z + z 2 h )!()
z h !
(z z' )
Pwf
z
(m)
zv
(m)
(kN/m )
(kN/m )
0,50
0,34
-10,17
-6,31
2,00
1,99
1,70
3,50
3,26
5,00
Pvf
(kN/m2)
pwf
(kN/m)
-0,27
2,71
3,65
1,05
0,04
15,65
0,14
9,43
5,84
0,25
25,63
5,55
4,28
14,78
9,16
0,39
33,60
16,95
6,50
5,12
18,66
11,57
0,49
40,16
32,59
8,00
5,82
21,58
13,38
0,57
45,68
51,36
9,50
6,42
23,85
14,78
0,63
50,40
72,53
11,00
6,94
25,64
15,89
0,67
54,49
95,57
YR
2)
3)
tan <
1 K/a,
2 /a-
: Cb
Vertical load at the hopper junction after the filling (foot of the vertical : Pvft
silo shaft)
Page 3 / 15
= 1,2
= C P'
= 65,39
kN/m2
:b
= 0,20
:S
= 2
1K
= 0,08
Fill Loads
Load ratio in the hopper after the filling (relationship between loads
perpendicular to the silo wall and mean vertical loads in the bulk
material)
: Ff
Ff
Parameter in the conditional equations of the hopper loads
:n
n
: Pv
= 1
b
tan
1+
3
= 1,00
= S 1 b 3 cot
= 0,03
n1
x
h
: Pnf
= F P'
: Ptf
= F P' 3
Pv
Pnf
+ P' 8
x
h
Ptf
x
(m)
(kN/m )
(kN/m )
(kN/m2)
0,00
0,00
0,00
0,00
1,50
59,71
59,47
4,50
1,68
65,39
65,12
4,93
Discharge Loads
Wall friction angle in the hopper between bulk material and hopper
wall
: wh = tan>) ( 3 )
wh = 0,08
Wall friction angle in the hopper between bulk material and hopper
wall
: i
= & a ?
= @ + sin>)
= 0,18
: Fe
Fe
Page 4 / 15
= 47,56
sin @
sin <
= 1,02
: Pne = F3 P'
: Pte
= F3 P' 3
Importance factor
:I
= 1,50
: A0
= 0,40
Behavioural coefficient
:R
= 4,00
: S(T) = 2,50
:s
: Ah
x
(m)
Pv
Pne
Pte
(kN/m2)
(kN/m2)
(kN/m2)
0,00
0,00
0,00
0,00
1,50
59,71
61,06
4,62
1,68
65,39
66,86
5,06
7. SEISMIC LOADS
h
cos
= 6,23
d s
2
= 117,46
m2
: Wh
= A t 77
= 361,78
kN
: Wc
= d t h 77
= 744,96
kN
= 58,73
kN
Wc
= 383,17
kN
= W +W
: Ws
: Wai = A 0,5
: Wph = 51,50
kN
: Wr
kN
Snow load
: Wsn = 45,00
kN
Live load
: WL
= 35,00
kN
:W
= WC + WD + WE< + WF + W& + WG
:V
V
Page 5 / 15
= 250,00
= 11401,03
kN
I AI S T W
R
= 4275,38
kN
: Wp
Weight of material
: Wm
Total weight
:W
:L
No
Portion
height
(m)
Total
height
(m)
tp
(mm)
Wp
(kN)
Wm
(kN)
W
(kN)
L
(m)
W*L
(kN.m)
F
(kN)
M
(kN.m)
1,00
1,68
1,68
40,00
420,52
494,88
915,40
0,84
770,31
53,73
33142,22
2,00
1,50
1,50
16,00
69,76
1331,72 1401,48
0,75
1051,11
73,31
27080,70
3,00
1,50
3,00
16,00
69,76
1331,72 1401,48
2,25
3153,33
219,94
21023,13
4,00
1,50
4,50
14,00
61,03
1331,72 1392,75
3,75
5222,82
364,28
15403,73
5,00
1,50
6,00
14,00
61,03
1331,72 1392,75
5,25
7311,95
509,99
10440,02
6,00
1,50
7,50
12,00
52,30
1331,72 1384,02
6,75
9342,16
651,59
6347,50
7,00
1,50
9,00
10,00
43,58
1331,72 1375,30
8,25
11346,22
791,37
3337,20
8,00
1,50
10,50
8,00
34,86
1331,72 1366,58
9,75
13324,14
929,32
1446,64
9,00
0,50
11,00
8,00
11,62
443,91
455,53
10,75
4896,91
341,55
1191,10
10,00
7,00
18,00
336,50
0,00
336,50
14,5
4879,25
340,31
61298,20
8. THICKNESS CALCULATION
: x
: xSi
Si
: xSRk
SRk SRk
: xSRd
SRd SRd
: m2
Si
SRk = x2*y
SRd = SRk/m2
: Sx
if
if
if
ON 0,25
0,25< ON < 2
ON 2
then
then
then
C = 1,1
C = 1,1 1 + 0,318
C = 1,45
Page 6 / 15
ON 0,25
1,75
M
NO<
Reduction factor
: x2
ON 0,25
if
0,25< ON 1
if
1< ON 1,5
if
x = 1,233 0,933 ON
then
x = 0,3
then
ON > 1,5
if
x =1
then
x = 0,2
then
ON
ON
: rc
= 6,000
Shell material
: S235JR
: y
= 235000
:E
= 210 10Z
xSi = 0,605 E
kN/m2
kPa
t
r
= 21,18 10Z t
xa
= WF + W& + WG + W8
xm
M
=
r
xw =
d t
p@
t
= 1,35 (NE + NC + N@ )
In the calculations below, shell thicknesses are assumed 1 mm less than their actual values due to corrosion safety.
No
Portion
height
(m)
tp
(m)
(kN/m2)
1,50
0,015
1,50
xSi
xa
xm
xw
(kN/m2)
(kN/m2)
(kN/m2)
Sx
m2
x2
317700,00
0,86
1,22
0,43
19174,45 19536,10
6371,51
0,015
317700,00
0,86
1,22
0,43
16696,09 15963,06
4835,52
1,50
0,013
275340,00
0,92
1,23
0,37
16405,06 14298,87
3951,15
1,50
0,013
275340,00
0,92
1,23
0,37
13563,23 10476,84
2506,79
1,50
0,011
232980,00
1,00
1,25
0,30
12670,73
8391,83
1540,57
1,50
0,009
190620,00
1,11
1,27
0,35
11407,30
6236,03
616,51
1,50
0,007
148260,00
1,26
1,30
0,42
9454,96
4215,33
19,92
0,50
0,007
148260,00
1,26
1,30
0,42
4276,44
1827,31
521,74
Page 7 / 15
xSRk
2
(kN/m )
(kN/m )
xSRd
(kN/m2)
x/xSRd
0,73
0,61
0,66
0,51
0,54
0,38
0,24
8944,41
0,12
99591,4 76509,78
dc
= 12,000
rc
= 6,000
hh
= 1,683
= 0,040
Wh
= 915,40
kN
Mh
= 33142,22
kN.m
= 74,3
= hh/cos()
= 6,23
r*
= rc/cos()
= 22,22
xa
xa
= 2247,67
xm =
W
2 r t cos
kN/m2
M
t cos
xm = 27125,81
kN/m2
xw =
^
r
1
] P83 x x +
dx
r
sin
x+
t I
sin
xw = 71,60
kN/m2
= 1,35 (NE + NC + N@ )
= 39750,85
kN/m2
xSi = 0,605 E
_
Page 8 / 15
M
NO<
Sx
x2
= 1,233 0,933 ON
x2
= 0,29
= 228754,64 kN/m2
= 1,01
ON 0,25
1,75
SRk = x2*y
= 67527,15 kN/m2
SRd = SRk/m2
= 53908,53 kN/m2
NO
= 0,74
<
OK
s*
= 6,15
1
1
= 0,5 r
cos
Rd
t
= 2,82
= 70,44
E
15 M
I,Zc
Rd
E
t
15 M
if
if
Od 0,25
0,25< Od < 2
then
then
C = 1,1
C = 1,1 1 + 0,318
if
Oe 2
then
C = 1,45
if
Oe 0,25
then
x =1
if
if
if
0,25< Od 1
1< Oe 1,5
Od > 1,5
then
then
then
s
sin
r
= 15,46
OK
ON 0,25
1,75
x = 1,233 0,933 Od
x = 0,3
x = 0,2
Od
Od
O< = 0,75 E
t
Rd
), a
Rd
s
I,a
M
NO<
m2 = 1,1 1 + 0,318
m2 = 1,18
x2
Page 9 / 15
= 0,67
Od 0,25
1,75
,a I,b
= x
O ,
C
= 69316,65 kN/m2
= 1,35
= 82107,97 kN/m2
F
r t
= 0,00
= 96,20
<
1,00
<
<
kN/m2
OK
NO
), a
`
0,68
OK
: Ms
= 33142,22
kN.m
:t
= 0,015
: sc
4 MD
W
+
(d +t) t d
(d +t) t
sc
= 39647,98
D
M
= 0,17
<
1,00
4 MD
W
d + 0,2
:U
:N
= 36
: Tb
= U/N
: ab
= 200000
: Ab
: Db
= 52 mm
Page 10 / 15
kN/m2
T 10Z
E
OK
= 10233,13 kN
= 284,25
kN
= 1421,27
mm2
Ab = 1652,00
mm2
kN/m2
kN/m2
: ys
= 235000
: Ns
= 36
: Vs
= V 0,7
: yc
= 21000
: As
: Ws
= 0,30
: gr
= 0,05
: Hs
: Ms
Ms
ND
kN
= 0,0113
m2
= 0,09
kN/m2
VD
0,35 M
AD
+ gr
WD
VD
(HD gr)
(gr +
)
WD
2
= 19,08
: b
= 0,75
: ts
Selected dimensions
: 300 * 100 * 30
Page 11 / 15
= 83,13
kN.m/m
6 MD
m MD
= 0,025
mm
General Dimensions
Page 12 / 15
Page 13 / 15
Page 14 / 15
Page 15 / 15