Beruflich Dokumente
Kultur Dokumente
Calculation method
Flange material
Integral method
BS 1501-223 490B
Gasket type
Design pressure, P
Saturation temperature, T
1.810 N/mm
208 C
169.6 N/mm
1.0 : 100NB
26 mm
Flange thickness, e
Hub length, h
9.5 mm
9.5 mm
20.5 mm
190 mm
22 mm
Gasket factor, m
6.5
235 mm
50 N/mm
2.55
190 mm
116 mm
160 mm
0.87
0.3
Stress factor, k
g1/go =
=
=
=
=
=
=
=
=
(B.g)
--------------------(11.5-22)
33.2313105
mm
A/B
--------------------(11.5-21)
2.02586207
[K(1 + 8.55246 logK) - 1]/[(1.0472 + 1.9448.K).(K -1)]
1.49704459
--------------------(11.5-23)
--------------------(11.5-24)
[1/(K-1)].[0.66845+5.7169.(K.logK)/(K - 1)]
2.91071887
=
=
-----(11.5-28)
1.67001368
MA.(CF/B)
hG
(C-G)/2
--------------------(11.5-26)
--------------------(11.5-14)
15
mm
(G-B)/2
=
bo
22
mm
11
mm
w/2
--------------------(11.5-1)
=
From 11.5.2,
When bo<=6.3
b =
bo
When bo>6.3
b =
2.52.bo
=
=
WA
=
=
MA
=
=
CF
=
=
2.52.bo
8.358
mm
--------------------(11.5-7)
b.G.y
210057.29
WA.hG
--------------------(11.5-17)
3150859.35
N.m
--------------------(11.5-20)
1.69303848
Therefore,
M
=
=
MA.(CF/B)
--------------------(11.5-26)
45987.2943
Mop.(CF/B)
/4.(B.P)
=
H
=
=
HT
HG
hD
19130.8134
Mop
--------------------(11.5-11)
17265.5022
2.G. b.m.P
98863.8837
H - HD
N
--------------------(11.5-6)
N
(C-B)/2
--------------------(11.5-13)
37
mm
(2C-B-G)/4
=
hG
--------------------(11.5-5)
36396.3156
=
hT
--------------------(11.5-10)
N
/4.(G.P)
--------------------(11.5-27)
--------------------(11.5-15)
26
mm
15
mm
(C-G)/2
--------------------(11.5-14)
2639701.41
--------------------(11.5-18)
N.m
Therefore,
M
Mop.(CF/B)
--------------------(11.5-27)
38526.8627
M/g
--------------------(11.5-29)
N/mm
166.43978
M/g
--------------------(11.5-29)
N/mm
139.43857
[(1.333.e.F + Io).M]/(.e.Io)
--------------------(11.5-30)
N/mm
77.6965504
[(1.333.e.F + Io).M]/(.e.Io)
--------------------(11.5-30)
N/mm
65.0919862
(Y.M/e) - r.[(K+1)/(K-1)]
--------------------(11.5-30)
N/mm
70.2550886
(Y.M/e) - r.[(K+1)/(K-1)]
--------------------(11.5-31)
N/mm
58.8577387
1.4 According to 11.5.4.2, flange stresses calculated shall meet the following requirements:
1.4.1
k.H
<=
1.5f
166.43978 N/mm
<------------
OK
139.43857 N/mm
<------------
OK
77.6965504 N/mm
<------------
OK
65.0919862 N/mm
<------------
OK
70.2550886 N/mm
<------------
OK
58.8577387 N/mm
<------------
OK
122.068165 N/mm
<------------
OK
102.265278 N/mm
<------------
OK
118.347434 N/mm
<------------
OK
99.1481543 N/mm
<------------
OK
1.4.3
1.4.4
1.4.5
--------------------(11.5-39)
:
k.r
k.
<=
<=
0.5k(H+r) <=
0.5k(H+) <=
--------------------(11.5-40)
--------------------(11.5-41)
--------------------(11.5-42)
--------------------(11.5-43)
Flange material
Integral method
BS 1501-151 430B
Gasket type
Design pressure, P
Saturation temperature, T
1.810 N/mm
208 C
140.3 N/mm
1.0 : 100NB
26 mm
Flange thickness, e
Hub length, h
9.5 mm
9.5 mm
20.5 mm
190 mm
22 mm
Gasket factor, m
6.5
235 mm
50 N/mm
2.55
190 mm
116 mm
160 mm
0.87
0.3
Stress factor, k
g1/go = 2.15756303
=
=
=
=
=
=
=
=
(B.g)
--------------------(11.5-22)
33.2313105
mm
A/B
--------------------(11.5-21)
2.02586207
[K(1 + 8.55246 logK) - 1]/[(1.0472 + 1.9448.K).(K -1)]
1.49704459
--------------------(11.5-23)
--------------------(11.5-24)
[1/(K-1)].[0.66845+5.7169.(K.logK)/(K - 1)]
2.91071887
=
=
-----(11.5-28)
1.67001368
MA.(CF/B)
hG
(C-G)/2
=
w
=
=
--------------------(11.5-26)
--------------------(11.5-14)
15
mm
22
mm
(G-B)/2
bo
w/2
--------------------(11.5-1)
11
mm
From 11.5.2,
When bo<=6.3
b =
bo
When bo>6.3
b =
2.52.bo
=
=
WA
=
=
MA
=
=
CF
=
=
2.52.bo
8.358
mm
--------------------(11.5-7)
b.G.y
210057.29
WA.hG
--------------------(11.5-17)
3150859.35
N.m
--------------------(11.5-20)
1.69303848
Therefore,
M
=
=
MA.(CF/B)
--------------------(11.5-26)
45987.2943
Mop.(CF/B)
/4.(B.P)
=
H
=
=
HT
HG
hD
19130.8134
Mop
--------------------(11.5-11)
17265.5022
2.G. b.m.P
98863.8837
H - HD
N
--------------------(11.5-6)
N
(C-B)/2
--------------------(11.5-13)
37
mm
(2C-B-G)/4
=
hG
--------------------(11.5-5)
36396.3156
=
hT
--------------------(11.5-10)
N
/4.(G.P)
--------------------(11.5-27)
--------------------(11.5-15)
26
mm
15
mm
(C-G)/2
--------------------(11.5-14)
2639701.41
--------------------(11.5-18)
N.m
Therefore,
M
=
=
Mop.(CF/B)
38526.8627
--------------------(11.5-27)
N
M/g
--------------------(11.5-29)
N/mm
166.43978
M/g
--------------------(11.5-29)
N/mm
139.43857
[(1.333.e.F + Io).M]/(.e.Io)
--------------------(11.5-30)
N/mm
77.6965504
[(1.333.e.F + Io).M]/(.e.Io)
--------------------(11.5-30)
N/mm
65.0919862
(Y.M/e) - r.[(K+1)/(K-1)]
--------------------(11.5-30)
N/mm
70.2550886
(Y.M/e) - r.[(K+1)/(K-1)]
--------------------(11.5-31)
N/mm
58.8577387
1.4 According to 11.5.4.2, flange stresses calculated shall meet the following requirements:
1.4.1
1.4.2
1.4.3
1.4.4
1.4.5
k.H
<=
1.5f
--------------------(11.5-39)
166.43978 N/mm
<------------
OK
139.43857 N/mm
<------------
OK
77.6965504 N/mm
<------------
OK
65.0919862 N/mm
<------------
OK
70.2550886 N/mm
<------------
OK
58.8577387 N/mm
<------------
OK
122.068165 N/mm
<------------
OK
102.265278 N/mm
<------------
OK
118.347434 N/mm
<------------
OK
99.1481543 N/mm
<------------
OK
k.r
k.
<=
<=
0.5k(H+r) <=
0.5k(H+) <=
--------------------(11.5-40)
--------------------(11.5-41)
--------------------(11.5-42)
--------------------(11.5-43)