Beruflich Dokumente
Kultur Dokumente
Civil Works
Date
Description
Originator
Desi Setyawan
Arswirasti A
Civil Works
Contents
Page
1. GENERAL .... 4
1.1 Outline Of Structure .. 4
1.2 Applicable Specifications, Codes And Standards
4
1.3 Allowable Stress And Unit Weight Of Material ..
4
1.4 Stability Parameter ....
4
1.5 Unit Of Measurement ....
4
1.6 Computer Software ..... 4
2. OUTLINE OF FOUNDATION ...
ATTACHMENTS
1. OUTPUT REPORT CALCULATION BY AFES
2. EQUIPMENT LOADING DATA
3. DRAWING
Calculation Foundation For TCA-TK-101 3 of 12
Civil Works
=
=
=
=
=
250
3900
2400
1700
1000
kg/cm2
kg/cm2
kg/m3
kg/m3
kg/m3
BH-3A
El. Design
+ 68.0
+ 68.0
(m)
2
El. Bot.
Settlement
Qall (ton/m )
Footing (m) Permanent Temporary
(mm)
+ 67.4
14.71
:
:
SFall =
SFall =
19.60
32.65
1.70
2.00
Microsoft Excel
AFES
Civil Works
2. OUTLINE OF FOUNDATION
2.1 GENERAL DESCRIPTION
This calculation is prepared to explain the detail design of foundation for TCA-TK-101.
This equipment is supported by block foundation.
2.2 DIMENSIONS
BCD
D1
L1
GL
hs
Equipment Size :
Outer diameter of tank ,
OD
Height of equipment,
H
Center of Gravity,
COG
BCD
Bolt Circle Diameter,
Minimum diameter of footing ,db =
Anchor Bolt :
Anchor Bolt diameter,
DB
Anchor Bolt Embedded length, LB
Anchor Bolt Number,
nb
Anchor Bolt to edge distance,
HB
Anchor Box :
Anchor Box Length ,
Anchor Box Width ,
Anchor Box Depth ,
=
=
=
=
4600
7200
3750
4782
5200
mm
mm
mm
mm
mm
=
=
=
=
22
485
8
150
mm
mm
nos
mm
=
=
=
165
165
480
mm
mm
mm
h1
Foundation Dimension :
D1 min :
BCD + 2 HB
db
BCD + 2.5 DB
Diameter of footing ,
Height of footing
D1
h1 =
hs =
=
=
=
5082 mm
5200 mm
4837 mm
5200 mm
1000 mm
400 mm
Civil Works
3. LOADING DATA
3.1. DEAD LOAD
Foundation selfweight is calculated automatically by AFES.
3.2. EQUIPMENT LOAD
Equipment Load shall be taken from equipment loading data as per attachment-2,
Erection Weight
=
8.4
ton
Operation Weight
=
137.1
ton
=
1.258
ton
Test Weight
3.3 LIVE LOAD
Since there is no platform attached on equipment, live load is zero.
3.4 WIND LOAD
Wind Load for this type of equipment is calculated based on equation below,
W = PxCx A
Shear Force :
2
P = V / 16
Where :
W = Wind Load (kg)
P = Basic Wind Pressure (kg/m2)
C = Wind Coefficient
A = Projected Area (m2)
V = Wind Speed (m/s)
Based on Basic Engineering Design Data, Section 7.10 Climatic Condition,
Wind Velocity (V) =
40 m/s
(max)
2
Basic Wind Pressure (P) =
100 kg/m
Wind Coefficient (C) :
For Rounded Wall :
a. Windward
:
0.7
b. Leeward
:
0
A = Projected Area of all the elements of the windward face (m2)
A1 = 1.2 x OD x H
A2 = (OD+0.6) x H
or
(whichever is larger)
A1 =
A2 =
39.74 m2
37.44 m2
A use =
37.44 m2
2.621 ton
W = PxCxA use
=
9.828 ton
=
Moment Mw = W x CoG
3.5. SEISMIC LOAD
The base shear force due to earthquake load shall be calculated in accordance with SNI-1726-2002.
C1 I W
Shear Force : V =
R
C1 = Earthquake response factor value
Where :
= 0.10
C I
I = Importance Factor
= 1.5
Cd = 1 = 0.068
R = Earthquake reduction factor
= 2.20
R
W = Weight of equipment
Operating Condition :
Shear force V = Cd x Operation Weight
=
9.348 ton
Moment Mv = V x CoG
=
35.05 ton.m
Calculation Foundation For TCA-TK-101 6 of 12
Civil Works
:
:
:
:
:
SW + Empty
SW + Empty + LL
SW + Empty + WL
SW + Empty + 0.75 WL + 0.75 LL
0.6 SW + 0.6 Empty + WL
:
:
:
:
:
:
:
:
SW + Operation
SW + Operation + LL
SW + Operation + WL
SW + Operation + 0.75 WL + 0.75 LL
0.6 SW + 0.6 Operation + WL
SW + Operation + 0.7 SL2
SW + Operation + 0.525 SL2 + 0.75 LL
0.6 SW + 0.6 Operation + 0.7 SL2
:
:
:
:
:
SW + Test
SW + Test + LL
SW + Test + WL
SW + Test + 0.75 WL + 0.75 LL
0.6 SW + 0.6 Test + WL
Operation Condition
106. Operation
107. Operation + LL
108. Operation + Wind
109. Operation + Wind + LL
110. Operation + Wind
111. Operation + Seismic
112. Operation + Seismic + LL
113. Operation + Seismic
Test Condition:
114. Test
115. Test + LL
116. Test + Wind
117. Test + Wind + LL
118. Test + Wind
:
:
:
:
:
:
:
:
:
Operating
OperationCondition
Condition
206. Operation
207. Operation + LL
208. Operation + Wind
209. Operation + Wind + LL
Testing
Test Condition:
Condition
213. Test
214. Test + LL
215. Test + LL
216. Test + Wind + LL
Maintenance
217. Test + Wind
Condition
+ LL
Where ,
SW
LL
WL
SL2
Empty
Operation
Test
Civil Works
:
:
:
:
:
:
:
:
:
:
:
:
Foundation Selfweight
Live Load
Wind Load
Seismic Load
Equipment Empty Weight
Equipment Operation Weight
Equipment Test Weight
Civil Works
4. STABILITY CHECK
4.1 SOIL PRESSURE AND STABILITY CHECK
LOAD COMBINATION
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
Q Max
Q All
2.78
2.78
3.58
3.38
2.47
8.52
8.52
9.33
9.13
5.92
10.54
10.03
7.13
8.02
8.02
8.82
8.62
5.62
14.71
19.61
19.61
14.71
19.61
19.61
19.61
19.61
19.61
19.61
19.61
19.61
19.61
19.61
19.61
19.61
19.61
19.61
Stability Check
SF Sliding
SF Overturning
Actual Min Actual Min
REMARK
X - Direction
7.115
9.487
4.269
21.846
29.128
13.108
8.75
11.667
5.25
20.553
27.404
12.332
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
1.7
1.7
1.7
1.7
1.7
1.7
1.7
1.7
2.7
3.7
4.7
5.7
6.7
7.7
8.7
9.7
10.7
11.7
12.98
17.31
7.79
39.86
53.15
23.92
15.97
21.29
9.58
37.5
50
22.5
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
LOAD COMBINATION
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
Q Max
Q All
2.78
2.78
3.58
3.38
2.47
8.52
8.52
9.33
9.13
5.92
10.54
10.03
7.13
8.02
8.02
8.82
8.62
5.62
14.71
19.61
19.61
14.71
19.61
19.61
19.61
19.61
19.61
19.61
19.61
19.61
19.61
19.61
19.61
19.61
19.61
19.61
Stability Check
SF Sliding
SF Overturning
Actual Min Actual Min
REMARK
Y - Direction
7.115
9.487
4.269
21.846
29.128
13.108
8.750
11.667
5.250
20.553
27.404
12.332
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
1.7
1.7
1.7
1.7
1.7
1.7
1.7
1.7
2.7
3.7
4.7
5.7
6.7
7.7
8.7
9.7
10.7
11.7
12.98
17.31
7.79
39.86
53.15
23.92
15.97
21.29
9.58
37.5
50
22.5
2
2
2
2
2
2
2
2
3
4
5
6
7
8
9
10
11
12
Civil Works
H 0 ( i ) =
P0( i ) + P0 (i )
log
P0 (i )
Cc ( i ) H (i )
1 + e0 ( i )
P0 ( i ) + P0 (i )
log
P
1 + e0 ( i )
0
(
i
)
2. If upper structures loads combined with overburden pressure > preconsolidation pressure
H 0 ( i ) =
C R(i ) H (i)
P0( i ) + P0(i ) Pc ( i )
H 0( i ) =
Where :
C R(i ) H (i )
1 + e0 ( i )
H0
H0
log
Pc ( i )
P0(i )
Cc (i ) H (i )
1 + e( i )
P0(i ) + P0 (i ) Pc ( i )
log1 +
Pc ( i )
=
=
=
=
=
=
=
=
=
=
z = 68 m
SILTY CLAY
2m
SILTY CLAY
2m
SILTY CLAY
2m
SILTY CLAY
4m
SILTY SAND
3.5 m
5200 mm
= 3.38 ton/m2
BOULDER
Calculation Foundation For TCA-TK-101 10 of 12
Civil Works
Only the clay portion will be subjected to the consolidation, thus only the first two layer
will be calculated, where as their soil properties are as follows:
Classification
Thickness (H)
sat
e0
e
Po
Pc
Cc
CR
Influence Factor
D/z
Ic
Layer 1
Silty Clay
2.00 m
1.67 ton/m3
1.38
1.355
1.67 ton/m2
8.50 ton/m2
0.53
0.06
5.200
0.954
Layer 2
Silty Clay
2.00 m
1.69 ton/m3
1.16
1.125
5.03 ton/m2
13.00 ton/m2
0.5
0.07
1.733
0.568
Layer 3
Silty Clay
2.00 m
1.78 ton/m3
0.935
0.925
8.50 ton/m2
15.00 ton/m2
0.35
0.05
1.040
0.302
Layer 4
Silty Clay
4.00 m
1.71 ton/m3
1.06
1.04
13.70 ton/m2
14.00 ton/m2
0.48
0.08
0.650
0.140
The stress bulb at z infinite, due to the upper structure load, will tend to zero. So, in certain layer of
clay which were calculated, the stress will be lower than the stress at the top of the soil layer.
Based on the data aboves, the pressure on soil layer are as follows:
Location
P0
At top
Mid Layer 1 (H01)
Mid Layer 2 (H02)
Mid Layer 3 (H03)
Mid Layer 4 (H04)
3.38 ton/m2
3.22 ton/m2
1.92 ton/m2
1.02 ton/m2
0.47 ton/m2
P0 + P0
Pc
3.38 ton/m2
N/A
4.89 ton/m2 8.5 ton/m2
6.95 ton/m2 13.0 ton/m2
9.52 ton/m2 15.0 ton/m2
14.17 ton/m2 14.0 ton/m2
Total Settlement
Recompression
Consolidation
N/A
N/A
0.02354 m
0.00911 m
0.00254 m
0.00146 m
0.00000 m
0.00000 m
0.00000 m
0.00000 m
0.03265 m
32.65 mm
Civil Works
=
=
=
8.478 cm
9.928 cm2
D16-200
=
=
=
8.253 cm
2
9.928 cm
D16-200
Y - Direction
As required
As provided
Using Bar
=
=
=
8.335 cm2
9.928 cm2
D16-200
Y - Direction
As required
As provided
Using Bar
=
=
=
8.110 cm2
2
9.928 cm
D16-200
ATTACHMENT - 1
OUTPUT REPORT CALCULATION BY AFES
TITLE
DESCRIPTION
PROJECT/JOB NO.
09-JC-15
PROJECT/JOB NAME
ICA PROJECT
CLIENT NAME
ICA
SITE NAME
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME
TCA-TK-101
DATE
DESCRIPTION
PREP'D
CHK'D
APPR'D
APPR'D
PROJECT
CALCULATION FOUNDATION
FOR TCA-TK-101
FOUNDATION LISTS
Group Name
No.
Description
F1
No.
Description
Page 1
PROJECT
CALCULATION FOUNDATION
FOR TCA-TK-101
CONTENTS
1. GENERAL
1.1 MATERIALS & UNIT WEIGHT
1.2 SUBSOIL CONDITION & SAFETY FACTORS
1.3 LOAD COMBINATION
2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH
3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
3.2 PIER DATA
3.3 LOAD CASE
3.4 LOAD COMBINATION
4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
4.2 CHECK OF OVERTURNING MOMENT
4.3 CHECK OF CONTACT PRESSURE
5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
Page 2
PROJECT
CALCULATION FOUNDATION
FOR TCA-TK-101
1. GENERAL
1.1 MATERIALS & UNIT WEIGHT
Items
Value
2
250.000 kgf/cm
150.000 kgf/cm
3900.000 kgf/cm
3900.000 kgf/cm
1.700 ton/m
2.400 ton/m
235000.000 kgf/cm
2
2
2
3
3
2
2
- Soil Capacity
Items
Value
Soil Name
BH-3A
Footing List
F1
14.71 tonf/m
Buoyancy
Not Consider
0 mm
0 mm
Not Consider
Cu (Undrained cohesion)
Clay , 0 tonf/m
Description
33.33 %
33.33 %
33.33 %
1.7
0.3
Page 3
PROJECT
CALCULATION FOUNDATION
FOR TCA-TK-101
Index
SW
SELF WEIGHT
Empty
EMPTY LOAD
Operation
OPERATION LOAD
Test
TEST LOAD
WL
WIND LOAD
SL2
Comb . ID
101
102
103
104
105
.6 SW + 1.0 WL + .6 Empty
106
107
108
109
110
.6 SW + 1.0 WL + .6 Operation
111
112
113
.6 SW + .7 SL2 + .6 Operation
114
115
116
117
118
.6 SW + 1.0 WL + .6 Test
Comb . ID
201
202
203
204
205
.9 SW + 1.6 WL + .9 Empty
206
207
208
209
210
.9 SW + 1.6 WL + .9 Operation
211
212
213
214
Page 4
PROJECT
CALCULATION FOUNDATION
FOR TCA-TK-101
215
216
217
.9 SW + 1.6 WL + .9 Test
Page 5
2. DRAWING
REFERENCE DWGS
A01
NO.
DWG NO.
DWG TITLE
NOTES
* OUTPUT UNIT : mm
01
F1
SQUAD CHECK
SCALE
AS SHOWN
JOB NO.
09-JC-15
ELEC.
INST.
MICROFILM NO.
OUTPUT UNIT : mm
DWG TITLE
75
TYP.
DWG NO.
D16@200
TOP
NO.
D16@200
5200
REFERENCE DWGS
CL FOOTING
BOTTOM
NOTES
* ANCHOR BOLT
1X8-165WX165LX480H ANC. BOX
D16@200
* OUTPUT UNIT : mm
D16@200
FOUNDATION PLAN
5200
100 50
4782
TOC EL. + 400
209
209
22.5
600
1000
D10
@200
45
D10
D13
8-D13
SECTION
SQUAD CHECK
50
100
SCALE
REV. DATE
DESCRIPTION
DRWNCHKDAPPDAPPDAPPD
AS SHOWN
JOB NO.
09-JC-15
ELEC.
INST.
MICROFILM NO.
PROJECT
CALCULATION FOUNDATION
FOR TCA-TK-101
Page 9
3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
( mm ) Ft. Name
5200
f5200
F1
Ft. Type
OCT
Area
22.401 m
Ft. Thickness
1000.00 mm
Ft. Volume
22.401 m
Ft. Weight
53.762 tonf
Soil Height
-400.00 mm
Soil Volume
0.000 m
Soil Weight
0.000 tonf
Buoyancy
Not Consider
53.762 tonf
9.35 t
1000
400
137.1 t
Section Data
( mm )
Ft.Name
Direction
Soil Volume
F1
All Direct
Sec.Name
Section Area
2
S1
Ft. Volume
22.401 m
Pier Wt
22.401 m
0.000 m
0.000 tonf
Ft. Weight
Soil Weight
Total Weight
53.762 tonf
0.000 tonf
53.762 tonf
Ft.Name
Pr.Name
Shape
F1
Octagonal
Pl
5200.000
Pw
5200.000
Ph
0.000
Area
22.401
Weight
0.000
Off X
0.000
Off Y
0.000
PROJECT
CALCULATION FOUNDATION
FOR TCA-TK-101
Page 10
Mz
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are
based on the right hand rule.
My
Fx
Mx
Index
SW
SELF WEIGHT
Empty
EMPTY LOAD
Operation
OPERATION LOAD
Test
TEST LOAD
WL
WIND LOAD
SL2
Ft.Name
Pr.Name
Load Case
F1
Fx
Fy
Fz
Mx
My
-8.4
-137.1
-125.8
2.62
2.62
-9.83
9.83
6
Footing SW
9.35
9.35
-35.05
35.05
0.000
0.000
-53.762
0.000
0.000
In Footing Bottom
with Pier Self Weight,
But without Footing Self Weight,
SFx
SFy
SFz
SMx
SMy
101
0.000
0.000
-8.400
0.000
0.000
102
0.000
0.000
-8.400
0.000
0.000
103
2.621
2.621
-8.400
-9.828
9.828
104
1.966
1.966
-8.400
-7.371
7.371
105
2.621
2.621
-5.040
-9.828
9.828
106
0.000
0.000
-137.100
0.000
0.000
Pr.Name L.Comb.
PROJECT
CALCULATION FOUNDATION
FOR TCA-TK-101
Page 11
107
0.000
0.000
-137.100
0.000
0.000
108
2.621
2.621
-137.100
-9.828
9.828
109
1.966
1.966
-137.100
-7.371
7.371
110
2.621
2.621
-82.260
-9.828
9.828
111
6.544
6.544
-137.100
-24.535
24.535
112
4.908
4.908
-137.100
-18.401
18.401
113
6.544
6.544
-82.260
-24.535
24.535
114
0.000
0.000
-125.800
0.000
0.000
115
0.000
0.000
-125.800
0.000
0.000
116
2.621
2.621
-125.800
-9.828
9.828
117
1.966
1.966
-125.800
-7.371
7.371
118
2.621
2.621
-75.480
-9.828
9.828
201
0.000
0.000
-11.760
0.000
0.000
202
0.000
0.000
-10.080
0.000
0.000
203
2.097
2.097
-10.080
-7.862
7.862
204
4.194
4.194
-10.080
-15.725
15.725
205
4.194
4.194
-7.560
-15.725
15.725
206
0.000
0.000
-191.940
0.000
0.000
207
0.000
0.000
-164.520
0.000
0.000
208
2.097
2.097
-164.520
-7.862
7.862
209
4.194
4.194
-164.520
-15.725
15.725
210
4.194
4.194
-123.390
-15.725
15.725
211
14.022
14.022
-164.520
-52.575
52.575
212
14.022
14.022
-123.390
-52.575
52.575
213
0.000
0.000
-176.120
0.000
0.000
214
0.000
0.000
-150.960
0.000
0.000
215
2.097
2.097
-150.960
-7.862
7.862
216
4.194
4.194
-150.960
-15.725
15.725
217
4.194
4.194
-113.220
-15.725
15.725
SFx
SFy
SFz
SMx
SMy
101
0.000
0.000
-8.400
0.000
0.000
102
0.000
0.000
-8.400
0.000
0.000
103
2.621
2.621
-8.400
-12.449
12.449
104
1.966
1.966
-8.400
-9.337
9.337
105
2.621
2.621
-5.040
-12.449
12.449
106
0.000
0.000
-137.100
0.000
0.000
107
0.000
0.000
-137.100
0.000
0.000
108
2.621
2.621
-137.100
-12.449
12.449
109
1.966
1.966
-137.100
-9.337
9.337
110
2.621
2.621
-82.260
-12.449
12.449
111
6.544
6.544
-137.100
-31.079
31.079
112
4.908
4.908
-137.100
-23.309
23.309
113
6.544
6.544
-82.260
-31.079
31.079
114
0.000
0.000
-125.800
0.000
0.000
115
0.000
0.000
-125.800
0.000
0.000
116
2.621
2.621
-125.800
-12.449
12.449
Pr.Name L.Comb.
F1
PROJECT
CALCULATION FOUNDATION
FOR TCA-TK-101
JOB NO : 09-JC-15
CLIENT: ICA
Page 12
117
1.966
1.966
-125.800
-9.337
9.337
118
2.621
2.621
-75.480
-12.449
12.449
201
0.000
0.000
-11.760
0.000
0.000
202
0.000
0.000
-10.080
0.000
0.000
203
2.097
2.097
-10.080
-9.959
9.959
204
4.194
4.194
-10.080
-19.918
19.918
205
4.194
4.194
-7.560
-19.918
19.918
206
0.000
0.000
-191.940
0.000
0.000
207
0.000
0.000
-164.520
0.000
0.000
208
2.097
2.097
-164.520
-9.959
9.959
209
4.194
4.194
-164.520
-19.918
19.918
210
4.194
4.194
-123.390
-19.918
19.918
211
14.022
14.022
-164.520
-66.597
66.597
212
14.022
14.022
-123.390
-66.597
66.597
213
0.000
0.000
-176.120
0.000
0.000
214
0.000
0.000
-150.960
0.000
0.000
215
2.097
2.097
-150.960
-9.959
9.959
216
4.194
4.194
-150.960
-19.918
19.918
217
4.194
4.194
-113.220
-19.918
19.918
3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
- C.G. of Load is coordinate from left bottom. Unit : mm
Ft.Name
F1
L.Comb.
SFx
SFy
SFz
SMx
SMy
C.G. of Loads
101
0.000
0.000
-62.162
0.000
0.000
2600.0 , 2600.0
102
0.000
0.000
-62.162
0.000
0.000
2600.0 , 2600.0
103
2.621
2.621
-62.162
-12.449
12.449
2600.0 , 2600.0
104
1.966
1.966
-62.162
-9.337
9.337
2600.0 , 2600.0
105
2.621
2.621
-37.297
-12.449
12.449
2600.0 , 2600.0
106
0.000
0.000
-190.862
0.000
0.000
2600.0 , 2600.0
107
0.000
0.000
-190.862
0.000
0.000
2600.0 , 2600.0
108
2.621
2.621
-190.862
-12.449
12.449
2600.0 , 2600.0
109
1.966
1.966
-190.862
-9.337
9.337
2600.0 , 2600.0
110
2.621
2.621
-114.517
-12.449
12.449
2600.0 , 2600.0
111
6.544
6.544
-190.862
-31.079
31.079
2600.0 , 2600.0
112
4.908
4.908
-190.862
-23.309
23.309
2600.0 , 2600.0
113
6.544
6.544
-114.517
-31.079
31.079
2600.0 , 2600.0
114
0.000
0.000
-179.562
0.000
0.000
2600.0 , 2600.0
115
0.000
0.000
-179.562
0.000
0.000
2600.0 , 2600.0
116
2.621
2.621
-179.562
-12.449
12.449
2600.0 , 2600.0
117
1.966
1.966
-179.562
-9.337
9.337
2600.0 , 2600.0
118
2.621
2.621
-107.737
-12.449
12.449
2600.0 , 2600.0
PROJECT
CALCULATION FOUNDATION
FOR TCA-TK-101
Page 13
Ft.Name
F1
Sec.Na
S1
L.Comb.
SFx
SFy
SFz
SMx
SMy
C.G. of Loads
201
0.000
0.000
-11.760
0.000
0.000
2600.0 , 2600.0
202
0.000
0.000
-10.080
0.000
0.000
2600.0 , 2600.0
203
2.097
2.097
-10.080
-9.959
9.959
2600.0 , 2600.0
204
4.194
4.194
-10.080
-19.918
19.918
2600.0 , 2600.0
205
4.194
4.194
-7.560
-19.918
19.918
2600.0 , 2600.0
206
0.000
0.000
-191.940
0.000
0.000
2600.0 , 2600.0
207
0.000
0.000
-164.520
0.000
0.000
2600.0 , 2600.0
208
2.097
2.097
-164.520
-9.959
9.959
2600.0 , 2600.0
209
4.194
4.194
-164.520
-19.918
19.918
2600.0 , 2600.0
210
4.194
4.194
-123.390
-19.918
19.918
2600.0 , 2600.0
211
14.022
14.022
-164.520
-66.597
66.597
2600.0 , 2600.0
212
14.022
14.022
-123.390
-66.597
66.597
2600.0 , 2600.0
213
0.000
0.000
-176.120
0.000
0.000
2600.0 , 2600.0
214
0.000
0.000
-150.960
0.000
0.000
2600.0 , 2600.0
215
2.097
2.097
-150.960
-9.959
9.959
2600.0 , 2600.0
216
4.194
4.194
-150.960
-19.918
19.918
2600.0 , 2600.0
217
4.194
4.194
-113.220
-19.918
19.918
2600.0 , 2600.0
PROJECT
CALCULATION FOUNDATION
FOR TCA-TK-101
Page 14
4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
mSFz + P.F
mSFz + P.F
or
) > Fs -> OK (Uni-Axial)
SFx
SFy
P.F = Passive Force (apply only in case checked passive force, mark by P )
Formula : (
Ft.Name
Dir.
L.Comb.
105
105
F1
Unit ( tonf )
Fs(i)
Result
1.7
OK
1.7
OK
Ft.Name
Dir.
L.Comb.
105
105
F1
Unit ( tonf-m )
OVM(i)
Result
OK
OK
Ft.Name
Af (m )
Fl (m )
Fw (m )
Ix (m )
Iy (m )
F1
22.401
5.200
5.200
40.0240
40.0240
PROJECT
CALCULATION FOUNDATION
FOR TCA-TK-101
Page 15
Ft.Name
L.Comb.
q1
q2
ci
cj
Qmax
Qa
Cont.A.R
Result
F1
107
8.520
8.520
0.000
5.200
8.520
14.711(gross)
100 / 80 %
OK
- Y-Direction (Uni-Axial)
Ft.Name
L.Comb.
q1
q2
ci
cj
Qmax
Qa
Cont.A.R
Result
F1
107
8.520
8.520
0.000
5.200
8.520
14.711(gross)
100 / 80 %
OK
PROJECT
CALCULATION FOUNDATION
FOR TCA-TK-101
Page 16
5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
SQ = SFz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width
5.1.1 Data
Ft.Name
Sec.Na
S1
Dir.
L.Comb.
Fl or Fw
Sl or Sw
SFz
SM
SQ
201
5200.00
5200.00
11.760
0.00
11.760
202
5200.00
5200.00
10.080
0.00
10.080
203
5200.00
5200.00
10.080
9.96
10.080
204
5200.00
5200.00
10.080
19.92
10.080
205
5200.00
5200.00
7.560
19.92
7.560
206
5200.00
5200.00
191.940
0.00
191.940
207
5200.00
5200.00
164.520
0.00
164.520
208
5200.00
5200.00
164.520
9.96
164.520
209
5200.00
5200.00
164.520
19.92
164.520
210
5200.00
5200.00
123.390
19.92
123.390
211
5200.00
5200.00
164.520
66.60
164.520
212
5200.00
5200.00
123.390
66.60
123.390
213
5200.00
5200.00
176.120
0.00
176.120
214
5200.00
5200.00
150.960
0.00
150.960
215
5200.00
5200.00
150.960
9.96
150.960
216
5200.00
5200.00
150.960
19.92
150.960
217
5200.00
5200.00
113.220
19.92
113.220
201
5200.00
5200.00
11.760
0.000
11.760
202
5200.00
5200.00
10.080
0.000
10.080
203
5200.00
5200.00
10.080
-9.959
10.080
204
5200.00
5200.00
10.080
-19.918
10.080
205
5200.00
5200.00
7.560
-19.918
7.560
206
5200.00
5200.00
191.940
0.000
191.940
207
5200.00
5200.00
164.520
0.000
164.520
208
5200.00
5200.00
164.520
-9.959
164.520
209
5200.00
5200.00
164.520
-19.918
164.520
210
5200.00
5200.00
123.390
-19.918
123.390
211
5200.00
5200.00
164.520
-66.597
164.520
212
5200.00
5200.00
123.390
-66.597
123.390
213
5200.00
5200.00
176.120
0.000
176.120
214
5200.00
5200.00
150.960
0.000
150.960
215
5200.00
5200.00
150.960
-9.959
150.960
F1
S1
PROJECT
CALCULATION FOUNDATION
FOR TCA-TK-101
Page 17
216
5200.00
5200.00
150.960
-19.918
150.960
217
5200.00
5200.00
113.220
-19.918
113.220
Unit(kgf/cm ,mm)
f(Flexure)
f(Shear)
f'c
fy1
fy2
f_cl
f_clt
f_clb
0.85
0.75
250.00
3900.00
3900.00
75.0
75.0
50.0
PROJECT
CALCULATION FOUNDATION
FOR TCA-TK-101
JOB NO : 09-JC-15
CLIENT: ICA
Page 18
Sec.Nam
L.Comb.
top
S1
Block
botom
Sec.Nam
S1
Sec.Nam
S1
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
Center
1.000
91.705
9.928
Center
1.000
94.205
9.928
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
top
8.253
33.064
29.575
196.747
bottom
8.478
33.965
30.381
202.110
Block
L.Comb.
Using As(cm )
As1(cm )
Result
top
9.928
8.253
OK
bottom
9.928
8.478
OK
Block
Sec.Nam
S1
Sec.Nam
S1
Sec.Nam
S1
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
top
Center
1.000
90.115
9.928
botom
Block
L.Comb.
Center
2
1.000
2
92.615
2
9.928
2
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
top
8.110
32.491
29.062
193.335
bottom
8.335
33.392
29.868
198.699
Block
L.Comb.
Using As(cm )
As1(cm )
Result
top
9.928
8.110
OK
bottom
9.928
8.335
OK
Block
ATTACHMENT - 2
EQUIPMENT LOADING DATA
ATTACHMENT - 3
FOUNDATION DRAWING
KEY PLAN
NOTES
LEGEND
REFERENCE DOCUMENT
C-PTCA-W-2201-002
:
:
:
Civil Works
E-PTCA-W-2301-002-0
09-JC-15
ICA Project
Date
0
1
2
5-Jan-11
13-May-11
11-Jan-12
Description
Issued For Approval
Issued For Review
Reviewed as per transmittal ICA-WIKA-TR
Originator
Arswirasti A
Desi Setyawan
Arswirasti A