Beruflich Dokumente
Kultur Dokumente
Rock Support
Other utilities
Jackleg
Miscellaneous equipment
Volume/shift
60
Amount of explosive
462
total length/round
195
No of split set/round
6
Cost/m
205.1
21.86
Rig
22.41
Tonnes/haul cycle
11.7
80
Equivalent hrs/week
106
3112.548301171
311.2548301171
3423.8031312881
1141.2677104294
347.9474726919
125539.448147229
36.6666666667
tonnes/shift
168
tonnes/day
336
Cost of explosive/round
457.38
bits / round
4.3333333333
bit cost/round
273
Drill
6.02
Total cost/hour
28.43
cycle/hour
0.9042553191
lead miner
2120
Miner#1
1908
tonnes/stope
6160
steel/round
0.1278688525
steel cost/round
22.6327868852
Tonnes/truck-hour
10.579787234
Mine helper
1590
Electrician/mech
90.1
Total
7231.85
Label
Cost
Explosive cost/tonne
Blasting Utilities/tonne
Drill bit
Split Set
Drill still
Air line
Water line
Water dicharge line
Electrical
Ventilation tubing
Consumable parts
Machine maintaince
Fuel
Lube
Tires
Drill jumbo
Diesel cost
Consumable parts
Machine maintaince
Fuel
Lube
Tires
Drills
Consumable parts
Machine maintaince
Lube
Truck operating cost
Consumable parts
Machine maintaince
Fuel
Lube
Tires
Jack leg
Bits/steel
Consumable supplies/maintainan
Miscellaneous equipment
Auxiliary fans
Pumps
Other
Labour cost
Lead miner
Miner#1
Miner helper
Mine utility miner
0.99
0.55
63
12
177
33.5
24.5
26.25
38.35
82.5
6.27
6.09
6.4
1.1
2
2
5.2
5.16
10
1.85
0.2
2.27
2.5
1.25
7.02
5.67
8
2.3
2.2
16
15
6.25
5
2.5
20
18
15
12.5
Electrician/mech
17