CRITERIA

SITE SELECTION CRITERIA- SITE A


%
EXPLANATION
EQUIVA
LENT

1. CLIMATE
Wind
Sun
Moisture
Temperature

2. ACCESSIBILITY
Transportation
Road
Connectivity

3. UTILITIES
Electricity
Water Line
Power Line
Drainage
System
Sewerage
System
4. SIZE OF LOT

5. GEOLOGICAL
CONDITION
Type of soil
Seismic
Condition
Topography

The site must have


adequate amount of
sunlight for the growing
of crops. The wind
directions should also be
considered for the
Kinetic Faade that will
harvest renewable
energy to be used as
electric power.
The site must be
accessible to the
facilities around the area
for faster and hassle-free
transfer of the harvested
crops.

The site must have


sufficient water supply
for irrigation. It should
also have proper
drainage and sewerage
system.

The site must be 4- 4.5


hectares at least.
The site must be as far as
possible from the fault
line. The topography of
the site must be 0-3%
slope or relatively flat if
possible.

20%

10%

20%

SITE A
Botong Francisco
Ave, Angono
CALABARZON
A
REMARKS
This city has a
tropical
climate.
Rainfall is
17% significant
most months
of the year, and
the short dry
season has
little effect.
There are
Public Utility
8% Vehicles such
as Jeeps,
Tricycles, and
Shuttles that
roam around
the area.
There are
utility cores
around the site
18% since the site is
near residential
areas.

10%

8%

10%

8%

The size of the


lot is 5
hectares.
The land is
actually
dominated by
the alluvial
river valley of
terrain of
Angono which
varies from

6. FACILITIES
Market
Factories
Malls
Hospitals
Schools

The site must be near the


major facilities for food
distribution.

10%

7. URBANIZED

The site must be in an


urbanized area.

10%

8. LAND USE
Institutional
Agricultural

The site must be in


accordance to the
classification of the
project.
TOTAL %

10%
100%

gently to
moderately
sloping areas
with slope
categories
ranging from 0
to more than
50%.
There are
several
6% markets and
schools in the
vicinity of the
site since it is
near the
residential
areas but it is
not near other
facilities such
as malls,
hospitals, and
factories.
The level of
9% urbanization of
Angono Rizal
is 95%
The zoning
classification
10% of the site is
Agricultural.
84%

CRITERIA

SITE SELECTION CRITERIA- SITE B


%
EXPLANATION
EQUIVA
LENT

SITE B
Panugay, Antipolo
A

9. CLIMATE
Wind
Sun
Moisture
Temperature

10. ACCESSIBILITY
Transportation
Road
Connectivity

11. UTILITIES
Electricity
Water Line
Power Line
Drainage
System
Sewerage
System
12. SIZE OF LOT

13. GEOLOGICAL
CONDITION
Type of soil
Seismic
Condition
Topography

The site must have


adequate amount of
sunlight for the growing
of crops. The wind
directions should also be
considered for the
Kinetic Faade that will
harvest renewable
energy to be used as
electric power.
The site must be
accessible to the
facilities around the area
for faster and hassle-free
transfer of the harvested
crops.
The site must have
sufficient water supply
for irrigation. It should
also have proper
drainage and sewerage
system.

The site must be 4- 4.5


hectares at least.
The site must be as far as
possible from the fault
line. The topography of
the site must be 0-3%
slope or relatively flat if
possible.

20%

10%

20%

REMARKS

The main
climatic
control
operating in
18% the climate of
the area is
actually the
monsoon wind
system.
There are
various public
8% transportation
systems in the
area such as
tricycles and
jeepneys.
The site is in
between vacant
lots so the
13% utility lines are
far away.

10%

9%

10%

5%

The lot are of


the site is 4.2
has.
It is hilly and
has a rugged
terrain.
Diastrophically
, its western
side is
traversed by
the East
Marikina Fault
Line.

14. FACILITIES
Market
Factories
Malls
Hospitals
Schools
15. URBANIZED

The site must be near the


major facilities for food
distribution.

16. LAND USE


Institutional
Agricultural

The site must be in


accordance to the
classification of the
project.
TOTAL %

The site must be in an


urbanized area.

The site is near


the markets but
not the other
facilities.

10%

7%

10%

10% The level of


urbanization of
Antipolo Rizal
is 99.8%
The zoning
classification
10% of the site is
Agricultural.
80%

10%
100%

SITE SELECTION CRITERIA- SITE C

CRITERIA

EXPLANATION

%
EQUIVA
LENT

SITE C
Balibago, Sta Rosa.
Laguna
A

17. CLIMATE
Wind
Sun
Moisture
Temperature

The site must have


adequate amount of
sunlight for the growing
of crops. The wind
directions should also be
considered for the
Kinetic Faade that will
harvest renewable
energy to be used as
electric power.

18. ACCESSIBILITY
Transportation
Road
Connectivity

The site must be


accessible to the
facilities around the area
for faster and hassle-free
transfer of the harvested
crops.

19. UTILITIES
Electricity
Water Line
Power Line
Drainage
System
Sewerage
System

The site must have


sufficient water supply
for irrigation. It should
also have proper
drainage and sewerage
system.

20. SIZE OF LOT

The site must be 4- 4.5


hectares at least.
The site must be as far as
possible from the fault
line. The topography of
the site must be 0-3%
slope or relatively flat if

21. GEOLOGICAL
CONDITION
Type of soil
Seismic
Condition

20%

10%

20%

10%

10%

REMARKS

The driest
month in the
barangay is
March, with
18% 6mm of rain.
The climate is
tropical.
Average
temperature is
27.4 deg.
Celcius.
Public
transport is
10% abundant in the
area since the
Barangay
Balibago is the
center of
transportation
in Sta Rosa,
Laguna.
There is a
power plant
near the site so
16% the power and
electricity in
the barangay is
not a problem.
The drainage
system around
the site is poor.
The size of the
7% lot is 6.6 has.
The type of
soil of the
8% Barangay
Balibago is
Guadalupe

Topography

possible.

22. FACILITIES
Market
Factories
Malls
Hospitals
Schools

The site must be near the


major facilities for food
distribution.

23. URBANIZED

The site must be in an


urbanized area.

24. LAND USE


Institutional
Agricultural

The site must be in


accordance to the
classification of the
project.
TOTAL %

10%

10%

10%
100%

Clay. The site


is not near the
fault line.
The site is at
the center of
9% the Barangay
therefore, the
facilities of the
barangay is
surrounding
the site.
9% The level of
Urbanization
of Barangay
Balibago is
97.3%.
The zoning
classification
10% of the site is
Agricultural.
87%

2.1.2. SITE JUSTIFICATION


SITE REQUIREMENTS
AFFORDABILITY

JUSTIFICATION

The value of the site must be


affordable.

The Market Value of the lot is Php


36,224,650.00 based on the Tax
Declaration document that was
issued by the Assessors Office of
Sta Rosa.
The Assessed Value of the lot is Php
3,622,470.00 based on the Tax
Declaration Document that was
issued by the Assessors Office of
Sta Rosa.
LAND USE
The site must be in accordance to the
The zoning classification of the site
proper zoning classification of the
is Agricultural.
project
The zoning classifications can either
be Agricultural or Institutional.
SIZE AND SHAPE OF THE LOT
The site must have a land area of
The size of the lot is 6.6 has.
The site is trapezoidal and has a little
40,000- 45,000 square meters.
The site must be at least square or
irregularity in one side.
trapezoidal in shape.
ACCESSIBILITY
The site must be near the major and
The site is in the center of the
minor roads.
Barangay Balibago.
The site must have a presence of
Barangay Balibago is the center of
public transportation.
trade and transportation in the City
The site must be near the facilities
of Sta. Rosa.
The site is surrounded by the
such as Markets, Schools, Factories,
and Malls.
importatant facilities esp. the
markets. It is located beside the
Waltermart.
GEOLOGICAL CONDITION
The site must be away from the fault
The West Valley Fault is located at
line.
the edge of the Barangay Sto.
The site must be free from flooding
Domingo which is four (4)
and other natural calamities.
barangays away from the site.
The type of soil of the site must be
The type of soil of the site is
compacted.
Guadalupe Clay.
The site must have 0-0.3% slope or
The type of Rock of the site is
relatively flat surface if possible.
Alluvium Rock.
The slope is gently sloping to
undulating.
UTILITIES

The site must have power and


electricity supply.
The site must have drainage and
sewer lines and water lines.

There is a power plant near the site


that supply the electricity of the City.
The drainage system is under
renovation for the betterment and to
avoid flooding in the area.

FAR EASTERN UNIVERSITY


INSTITUTE OF ARCHITECTURE AND FINE ARTS

PROPOSED AGRO-SCIENCE RESEARCH CENTER

Submitted by:
Sedano, Lailani Alyana R.
AR504

Submitted To:
Arch. Noel Dela Cruz
Arch. Gregoria Mercado