INTRODUCTION
General introduction
The CTI enclosure integrates a 4-pole fast changeover
switch including electronic control to meet the IEC
60947-6-1 standard. Thanks to the changeover switch
technology, it is always possible to manually operate
the system in order to guarantee the changeover panel
operation under all circumstances.
This new development allows advantages brought
using switch technology but keeps contactor control
possible on request via programming (Refer to
RETURN 0 Function).
CTI 63 A
CTI_1 63 A
CTI 100 A
CTI_1 100A
CTI 125 A
CTI_1 125A
CTI 160 A
CTI_1 160A
4
1
A dedicated enclosure
Bridging bar
4
INTRODUCTION
Voltage options
CTI power supply can carry from 220-20% Vac to
277+10% Vac under frequency 50Hz or 60Hz.
Accessories
> The following accessories are available as customer fitted options
Auxiliary contacts module for switch position
information (Main, Gen, zero position). One module
includes the 3 positions information. 1 module
maximum is the standard CTI enclosure. Option code
is TAUX.
Lightning protection. It is
available as an accessory to
avoid ATS damage in case of a
strike on the power cables.
This
option
is
highly
recommended in stormy areas.
Environment
> The complete enclosure meets following environmental requirements:
Ingress protection:
- standard Enclosed product = IP4x (possible IP54
with option)
- Loose product = IP21
Operating conditions:
- Temperature :
Of -10C to +40C without de-rating
Of +40C to +65C without de-rating
- Humidity: 95% non condensing at +40C
Rf. : 533 695 B
Storage conditions :
- Duration : 1 year maximum
- Temperature: <+55C
- Humidity: 80% non condensing at 55C
Maximum operating altitude without switch derating is 2000 m above sea level.
TECHNICAL CHARACTERISTICS
63A
Frequencies
Thermal current Ithe 40 C (A)
Thermal current Ithe 50C (A)
Thermal current Ithe 60C (A)
Assigned insulation voltage Ui (V) (power circuit):
Assigned impulse voltage Uimp (kV) (power circuit):
Assigned insulation voltage Ui (V) (auxiliary circuit):
Assigned impulse voltage Uimp (kV) (auxiliary circuit):
100A
125A
160A
100
100
80
600
6
300
2.5
125
110
100
600
6
300
2.5
160
125
100
600
6
300
2.5
63/63
63/63
63/63
100/100
100/100
100/100
125/125
125/125
125/125
160/160
125/160
125/160
63
63
100
100
125
125
160
160
Operating class
Material class (according to 60947-6-1)
PC
PC
PC
PC
50
63
7.5
50
100
11
50
125
13.5
50
160
16.5
Transfer time
I-O / O-I / II-O / O-II (ms)
I-II or II-I (ms)
Blackout time during comutation under Un (ms)
50
180
120
50
180
120
50
180
120
50
180
120
Power input
Peak current during operation (A)
Continuous power consumption (VA)
20
6
20
6
20
6
20
6
10000
10000
10000
10000
25
50
35
50
50
70
50
70
Mechanical characteristics
Number of mechanical operations (according to 60947-6-3)
Cables connection
Minimum cable size (Cu mm2)
Maximum cable size (Cu mm2)
63
80
100
125
160
100
125
160
200
250
INSTALLATION
First operation
The system is delivered in position 0 and in auto
mode with the generator start contact closed.
Height (mm)
600
Width (mm)
400
Depth (mm)
200
Weight (kg)
From 20 to 25
including accessories
Accessories mounting
> Auxilary contacts
INSTALLATION
> IP 54
Protection screen
Window
Brackets
25
35
50
50
50
50
70
70
Mains Genset
N
Utilization
INSTALLATION
Network configurations
VOLTAGE CONFIGURATIONS
Phase to Phase
voltage
380 -> 480V
CTI
Network
type
3 phase 4 wires
3P4L
FG Wilson
option code
Voltage
V502
415 V / 240 V
V503
400 V / 230 V
V504
380 V / 220 V
V601
480 V / 277 V
Frequency
Electrical drawing
50 Hz
L4
L7
V603
440 V / 254 V
V605
380 V / 200 V
60 Hz
L7
L8
L9
N2
L4
L5
L6
N1
N1
N2
L9
L6
L8
Mains
L5
Genset
220 V / 127 V
Phase to Phase
voltage
200 -> 240V
3 phase 4 wires
3P4L
CTI_1
50 Hz
V510
200 V / 115 V
V608
220 V / 127 V
V610
208 V / 120 V
L7
L4
60 Hz
L7
L8
L9
N2
L4
L5
L6
N1
N2
L9
V611
N1
L8
L6
240 V / 139 V
Mains
L5
Genset
230 V / 115 V
Phase to Phase
voltage
220 -> 240V
3 phase (3)4 wires
3P3(4)L
CTI_1
50 Hz
V508
220 V / 110 V
V606
240 V / 120 V
V607
230 V / 115 V
L7
L4
60 Hz
L7
L9
L8
L9
N2
L4
L5
L6
L8
L6
N/M
V609
220 V / 110 V
N1
L5
N/M
Mains
Genset
INSTALLATION
Network configurations
VOLTAGE CONFIGURATIONS
Phase to Phase
voltage
220 -> 240V
1 phase 3 wires
1P3L
CTI_1
Network
type
FG Wilson
option code
Voltage
V522
240 V / 120 V
V524
230 V / 115 V
V526
220 V / 110 V
Frequency
Electrical drawing
L10/M
L11 L12
50 Hz
L8
V622
240 V / 120 V
V624
230 V / 115 V
L5
L7/M
L4/M
L7/M
60 Hz
L8
L9
L4/M
L5
L6
L9
L6
M: Midle point
Mains
V626
220 V / 110 V
Genset
L11 L12
50 Hz
220 V
L4
CTI
L7
1 phase 2 wires
1P2L
277 V
Single phase
network
L7
N2
254 V
N2
L4
N1
N1
60 Hz
Mains
200 V
Genset
Phase to Phase
voltage
220 -> 240V
1 phase 2 wires
1P2L
CTI_1
240 V
V523
230 V
V525
220 V
L11 L12
50 Hz
L8
V621
240 V
V623
230 V
V625
220 V
L5
L8
60 Hz
L9
L5 L6
L9/N2
L6/N1
Mains
Genset
10
Network configurations
VOLTAGE CONFIGURATIONS
Network
type
Description
Electrical drawing
N3
CTI
2PAP
L10 L11
L4
L7
L7
L8
N2
L4
N1
N2
L8
N1
Mains
Genset
CTI
3PAP
L4
L7
L7
L8 L9 N2
L4
N1
N2
L9
L8
N1
Mains
Genset
11
12 14 11
2 4 6 8 2 4 6 8
L10
L11
21 24 22
1 3 5 7 1 3 5 7
L12
01 04 02
pos I
pos II
pos 0
L7 L8 L9 N2 L4 L5 L6 N1
N3
AUT
Denomination
Terminals
Description
Input
207
208
209
210
43/44
53/54
63/64
73/74
Output
74
73
64
63
ok
54
53
44
43
210
209
208
207
ok
Characteristics
Recommended
cable section
dry contact
0,5 to 2,5mm2
Resistive load:
Max. switched power:
60 W or 250 VA
Max. switched current:
5A
Max. switched voltage:
30 VDC or 250 VAC
0,5 to 2,5mm2
0,5 to 2,5mm2
12
OPERATION
General introduction
The product provides:
Manual operation
Automatic transfer operation
Test operations and mimic
Sources & power availability mimic
Voltage and frequency metering
Fault information
Source availability
2 green Leds to indicate if
Gen and Mains sources are available
(voltage and frequency measurement)
- Led is on = source available
- Led is off = source missing
Push button
LCD
Large LCD to display information
Switch state
2 green Leds to indicate if
the switch is opened or closed
- Led is on = switch is closed
- Led is off = switch is opened
1 Yellow led to indicate if both
switches are in 0 position
- Led is on = both switches opened
- Led is off = Gen or Mains
switch closed
Power Led
1 green led
- Blinks slowly as soon as the
product is powered and software
runs correctly
- Always on = Power OK and
software error
- Always off = Power off or
software error if another led is on
and LCD is OK
ATYS 635 B
Manual operation
Insert Allen key (5.0mm provided)
to manually operate the switch.
Manual operation only possible
in Manual mode when not padlocked
CLICK !
Return to zero
feature unavailable
Error Led
1 red led to indicate a fault
- Led is on = switch error
Action from software not confirmed by an auxiliary
contact. Open the front cover to reset.
Retransfer Inhibit
1 yellow Led, linked to retransfer inhibit pushbutton
- Led is on = retransfer inhibit feature is active
- Led is off = retransfer inhibit inactive
- Led is blinking = retransfer is blocked,
waiting for a push on the retransfer inhibit
pushbutton to allow retransfer
Cover
Open the cover to allow manual mode.
Close the cover (clic) to allow automatic
mode selection.
Open front cover to reset softwares faults
and to reset a test on load
13
OPERATION
Programming
> Software version
Software version is displayed on the unit after reset
(powering up action after minimum 3 minutes power off
to discharge the unit).
PROGRAMMING ACCESS
PROGRAMMING EXIT
ATI 070 A
Validate
PRODUCT RESET
Software reset -> open and reclose the front cover
14
OPERATION
Programming
PROGRAMMING MENUS
> Architecture and navigation
The programming mode integrates 4 Menus:
Setup: Network parameters
Volt levels: Voltage detection levels
Freq. levels: Frequency detection levels
Timers: Automatic timer settings
ATYS 636 B
15
OPERATION
Programming
1 SETUP
> Parameter Display
For example, the setup menu integrates 10 parameters
described in the table hereunder.
Press
Press
or
16
OPERATION
Programming
1 SETUP
> Parameter modification
Press
Press
ATI 075 C
twice to display 2
(blinking)
Press
to access the
second digit
(blinking)
Press
3 times to display 3
(blinking)
Press
to validate
the value
ATI 074 B
Press
ATI 076 B
Press
17
OPERATION
Programming
1 SETUP
Definition
NOM.VOLT:
NETWORK:
NOM.FREQ:
RETRANS:
RETURN 0
(main):
RETURN 0
(Gen):
2nd TRIP
(Main):
MODE
CNT RST:
ATYS 636 B
BACKLIGHT:
Setting range
400 Vac
Yes or No
Retransfer inhibit feature:
press on RTI button ( > 8)
required to
allow retransfer from gen to main.
Yes or No
Immediate transfer to 0 position
after loss of mains
Enables FPMT & ROMT timers
(contactor logic)
Yes or No
Immediate transfer to 0 position
after loss of genset
Enables FPGT & ROGT timers
(contactor logic)
Yes or No
System available for 2nd transfer
to zero position.
- YES: (available) wait for the total
capacity of the power capacitor
- NO: (unavailable) 2nd trip not
immediately available
Inhibition of the manual mode
AUT or AUT/MAN
AUT : the automatic mode is
always actived irrespective of
the position of the front cover
AUT/MAN : standard fonctionnality
Yes or No
Reset number of commutation
counter (from Main to Gen).
Displays No once reset.
No
Default value
From 380 to
480 Vac (CTI)
From 200 to
240 Vac (CTI_1)
3P4L/2 PAP/ 1P2L
Network configuration.
3 PAP (CTI)
Type of metering (1P or 3P phases).
3P4L/3P3L/1P2L/
Number of active wires
1P3L (CTI_1)
(2L, 3L or 4L) definition.
50 or 60 Hz
Nominal frequency.
Phase-Phase
Nominal voltage.
230 Vac
3P4L
50 Hz
No
No
No
AUT/MAN
No
On
OPERATION
Programming
2 VOLT. LEVELS
To reach voltage menu from Setup menu press once
Note:
These values only need to be changed if a value is
required other than the default.
Setting range
Default value
OV U:
102 - 120%
115%
OV U HYS:
101 - 119%
110%
UND.U:
60 - 98%
85%
UND.U HYS:
61 - 99%
95%
OV U:
102 - 120%
115%
OV U HYS:
101 - 119%
110%
UND.U:
60 - 98%
85%
UND.U HYS:
61 - 99%
95%
ATYS 636 B
Definition
19
OPERATION
Programming
3 FREQ. LEVELS
To reach frequency menu from voltage menu press once
Note:
These values only need to be changed if a value is
required other than the default.
Setting range
Default value
OV F:
101 - 120%
105%
OV F HYS:
100.5 - 119.5%
103%
UND.F:
60 - 99%
95%
UND.F HYS:
60.5 - 99.5%
97%
OV F:
101 - 120%
105%
OV F HYS:
100.5 - 119.5%
103%
UND.F:
60.5 - 99.5%
95%
UND.F HYS:
60 - 99%
97%
ATYS 636 B
Definition
20
OPERATION
Programming
4 TIMERS
To reach timer menu from frequency menu press once
Note:
These values only need to be changed if a value is
required other than the default.
21
OPERATION
Programming
4 TIMERS
Definition
Setting range
Default value
0 to 60 sec.
5 sec.
0 to 60 sec.
5 sec.
1MT:
0 to 1800 sec.
120 sec.
DBT:
0 to 20 sec.
5 sec.
0 to 600 sec.
240 sec.
0 to 10 sec.
2 sec.
0 to 10 sec.
5 sec.
2MT:
AT:
ROT:
ATYS 636 B
FPMT:
FPGT:
> Information
In a situation of mains returns, if the genset shutsdown,
the 1MT timer is automatically set to 3 seconds to
allow a quick return to the mains.
22
OPERATION
Metering
PRODUCT METERING
> General comments
Metering is active as soon as the unit is powered.
Commutation cycles have priority over Visualisation
mode and display timers count down as soon as they
are active.
Any value available in this mode can be kept on the
screen once displayed. excepted during commutation
cycle; comes back to timer count down after 5 s.
or
ATYS 639 B
23
OPERATION
Metering
PRODUCT METERING
> Values definition
All these values are not accessible on all
networks
3P4L: Mains V1, V2, V3, U12, U23, U31
Gen V1, V2, V3, U12, U23, U31
1P3L: Mains U12, U23, U31 / Gen U12, U23, U31
1P2L: Mains U12 / Gen U12
ATYS 640 B
24
OPERATION
Manual operation
To access Manual Mode operation open the front cover
MANUAL MODE
Once in manual mode (cover open) it is possible:
to access programming and visualisation menus
to padlock the switch
to operate the switch with the handle
to start the Gen using test off load pushbutton.
MANUAL MODE
Programming
Visualisation
Padlocking
Handle
Operation
Start Generator
MANUAL OPERATION
Take the handle, attached on the front face under the
cover, to manually operate the switch.
Verify the switch position on the front position label
before any manual operation:
PADLOCKING
Padlock is only possible in manual operating mode
(front cover opened).
Padlocking is configurable in position 0 only or in 3
positions (I-0-II).
Manually pull the padlock handle to allow the
padlock to be inserted into the hole provided
4 mm min
3/16 min
8 mm min
5/16 min
Rf. : 533 695 B
25
OPERATION
Automatic operation
Ensure cover is fully closed and switch is in automatic
mode. Close the front cover Click to access
automatic operation.
The automatic mode must be activated as soon as
source switching is required after loss of mains
condition.
POSSIBLE ACTION
Once in automatic mode it is possible:
to access programming and visualisation menus
to start off load or on load testing
AUTOMATIC MODE
Programming
Visualisation
On load testing
Loss of mains
sequence
Mains return
sequence
Status of supply
New position
Mains
Mains
Mains
Genset
Genset
Genset
Mains
Zero
Zero
Zero
Genset
Zero
26
OPERATION
Automatic operation
LOSS OF MAINS SEQUENCE
This sequence is started as soon as the switch is in
automatic mode and in position I.
Position I:
mains is available
switch is in position I (Mains)
generator is on or off.
27
OPERATION
Automatic operation
LOSS OF MAINS SEQUENCE
> RETURN TO 0 POSITION variable set to NO
Mains available
Generator is stopped
Switch in position I
Loss of
mains ?
No
Loss of mains?
Yes
2MT = 0
Genset
star up
Count down
2MT
Mains comes back
before 2MT ends ?
Start Genset
Reset 2MT
Generator
available?
Yes
No
Yes
Stop gen
No
Mains available?
Reset AT
Count down
ROT
Gen fails
Mains available
Count down
AT
AT = 0
Transfert I > 0
DBT = 0
Transfert 0 > II
Mains unavaible
Generator running
Switch in position II
28
OPERATION
Automatic operation
LOSS OF MAINS SEQUENCE
Loss of Main
Return to 0 position = Yes
Loss of Main
Mains
return
Pos
2MT
FPMT
Mains
return
end
end
Start gen
I --> 0
&
Main
OK
Gen
OK ?
Yes
Yes
No
No
2nd trip
2nd trip
Loss of
Gen
Yes
Yes
1MT
Loss of
Main
AT
Loss of
Gen
1MT = 3s
end
Capa Gen
available
Capa Gen
available
Mains
return
Yes
Yes
or
or
DBT
&
end
&
I <-- 0
0 --> II
No
Gen
OK
Yes
ROT
Stop Gen
29
OPERATION
Automatic operation
MAINS RETURN AUTOMATIC SEQUENCE
This sequence is started as soon as the unit is in
automatic mode and in position II.
Position II:
Mains is not available
Switch is in position II (Generator)
Generator is on
CLICK !
RTI
led
30
RTI
pushbutton
OPERATION
Automatic operation
MAINS RETURN AUTOMATIC SEQUENCE
> Sequence description
Mains unavailable
Generator running
Switch in position II
Mains
return
Yes
No
Mains return ?
No
Manual re-transfer
Loss of Mains ?
Yes
Gens lost
before 1MT
times out
Yes
Count down
FPGT
Loss of Gen ?
1MT = 0
Count down
1MT
No
RETRANS
activated ?
Yes
Reset 2MT
No
Yes
RETRANS
push button
pressed ?
No
Transfer II > 0
Count down
DBT
DBT = 0
Transfer 0 > I
Reset ROT
Loss of mains
Count down
ROT
ROT = 0
To loss of
mains sequence
Transfer II > I
Mains available
Generator is stopped
Switch in position I
31
OPERATION
Automatic operation
GEN FAILURE
Loss of Gen
Return to 0 position = Yes
Loss of Gen
Gens
Return
FPGT
0 <-- II
Start Gen On during
1MT+ROT
Main
OK
DBT
end
Gen
OK
Yes
Yes
No
No
2nd trip
actif
2nd trip
actif
Yes
Yes
Loss of
Main
Loss of
Gen
Main Energy
available
1MT
1MT=3s
No
No
Yes
end
Gen Energy
available
AT
Yes
end
or
or
&
&
I <-- 0
0 --> II
No
Yes
Stop Gen
32
Gen
OK
ROT
Loss of
Main
OPERATION
Test mode
TEST MODE ACCESS
> Functionality
Press Test Push button
TEST
After 10 sec.
Code
OK
Yes
Test off Load
Led blinks ?
No
End
Code
not OK
Auto
After 10 sec.
Code
OK
Yes
Test On Load
Led blinks ?
Test on load
sequence
End
Code
not OK
No
Exit
33
OPERATION
Test mode
OFF LOAD TESTING
This test is possible in automatic mode in position I
when the mains is available or in manual mode. It can be
considered as a generator manual start in manual mode.
> Description
> Sequence
Code OK
Yes
Start Gen
Yes
Gen OK ?
Stop Gen ?
End
No
No
Press
?
No
Yes
ON LOAD TESTING
This test is only possible in automatic mode, it allows
to start the genset even if the mains is unavailable
before and during a critical period on the mains.
> Description
34
OPERATION
Test mode
RETURN TO FEATURE
> Energy storage device end of life
Return to zero feature unavailability.
Unavailability of this optional feature will be indicated
on the front panel. Please Refer to the trouble shooting
guide.
Return to zero position feature is realised thanks to a
internal energy storage device.
In case of failure of this component, a pointer remains
on to inform operator that return to zero feature (2nd
TRIP) is no longer operational.
CLICK !
35
RANGE
Complete product
Changeover switch
63 A
100 A
125 A
160 A
CTI_1
230Vac
348-7795
348-7798
348-7811
348-7813
CTI
400Vac
348-7797
348-7799
348-7812
348-7814
CTI_1
230Vac
306-9846
306-9848
306-9849
306-9850
CTI
400Vac
306-9851
306-9852
306-9853
306-9854
Bridging bar
306-9836
306-9894
Auxiliary contacts
306-9835
Solid neutral
306-9895
x2
36
306-9845
RANGE
63 A
100 A
125 A
160 A
Lightning protection
355-1440
IP 54
348-8814
37
TROUBLESHOOTING GUIDE
Symptom
01
Automatic
operations
availability.
Step
01
AUTO Led is on.
02
&AULT SYNTHESIS ,ED
is off.
Result
> NEGATIVE
s #HECK THAT THE SWITCH HAS NOT BEEN PADLOCKED
s #HECK THAT THE MANUAL OPERATING HANDLE HAS BEEN REMOVED
FROM HOUSING
s #LOSE THE !UTO-ANU FRONT COVER
s 4HEN CONSULT YOUR LOCAL DEALER
> POSITIVE
s 'O TO THE NEXT STEP
> NEGATIVE
s ,ED IS ON
4RY TO RESET THE PRODUCT SEE THE INSTRUCTIONS BELOW
4HEN CONSULT YOUR LOCAL DEALER
s 2ESET
02
4HE MAINS
availability.
03
4HE GENSET
AVAILABILITY GENSET
SUPPOSED STARTED
38
> POSITIVE
s 'O TO THE NEXT STEP
03
> NEGATIVE
0OWER SUPPLY ,ED IS s #ONSULT YOUR LOCAL DEALER
BLINKING
> POSITIVE
s 'O TO THE NEXT SYMPTOMS
01
> NEGATIVE
-AINS AVAILABILITY
s #HECK LAMP TEST
Led is on.
s #HECK THAT THE MAINS RETURN TIMER -4 IS STILL NOT COUNTING
DOWN
s #HECK THAT THE MAINS PROTECTION SYSTEM BREAKER IS ON
0OSITION
s 4HEN CONSULT YOUR LOCAL DEALER
> POSITIVE
s 'O TO THE NEXT STEPS OR SYMPTOMS
01
> NEGATIVE
'ENSET AVAILABILITY
s #HECK LAMP TEST
Led is on.
s #HECK THAT THE GENSET STABILISATION TIMER !4 IS STILL NOT
COUNTING DOWN
s #HECK THAT THE GENSET PROTECTION SYSTEM BREAKER IS ON
0OSITION
s 4HEN CONSULT YOUR LOCAL DEALER
> POSITIVE
s 'O TO THE NEXT STEPS OR SYMPTOMS
TROUBLESHOOTING GUIDE
Symptom
04
4HE PRODUCT DOESNT
TRANSFER TO THE
GENSET IN CASE OF
mains failure or test
on load.
Step
01
AUT Led is on &
&AULT SYNTHESIS ,ED
IS OFF 0OWER SUPPLY
,ED IS BLINKING
Result
> NEGATIVE
s 'O TO SYMPTOM
02
'ENSET IS STARTED
> NEGATIVE
s #HECK THAT THE MAINS FAILURE TIMER -4 IS STILL NOT COUNTING DOWN
s #HECK THE GENSET CONTROL PANEL IS SET TO THE AUTO POSITION
s 4HEN CONSULT YOUR LOCAL DEALER
> POSITIVE
s 'O TO THE NEXT STEP
> NEGATIVE
s 'O TO SYMPTOM
> POSITIVE
s #ONSULT YOUR LOCAL DEALER
> NEGATIVE
s 'O TO SYMPTOM
03
'ENSET AVAILABILITY
Led is on.
05
4HE PRODUCT DOESNT
TRANSFER TO THE MAINS
in case of mains
return or test on load
end.
01
AUT Led is on &
&AULT SYNTHESIS ,ED
IS OFF 0OWER SUPPLY > POSITIVE
,ED IS BLINKING
s 'O TO THE NEXT STEP
02
-AINS AVAILABILITY
Led is on.
03
2ETRANSFER INHIBIT
24) FUNCTION IS OFF
06
'ENSET KEEPS ON
RUNNING AFTER MAINS
RESTORES AND SWITCH
RETRANSFERS TO THE
mains position.
07
3WITCH MANUAL
operations are not
possible.
08
3WITCH PADLOCKING
operations are not
possible.
> POSITIVE
s 'O TO THE NEXT STEP
> NEGATIVE
s 'O TO SYMPTOM
> POSITIVE
s 'O TO THE NEXT STEP
> NEGATIVE
s 0USH THE 24) PUSH BUTTON
> POSITIVE
s #ONSULT YOUR LOCAL DEALER
> NEGATIVE
s 'O TO SYMPTOM
01
AUT Led is on &
&AULT SYNTHESIS ,ED
IS OFF 0OWER SUPPLY > POSITIVE
,ED IS BLINKING
s 'O TO THE NEXT STEP
> NEGATIVE
02
4HE RUN ON TIME TIMER s #HECK THE GENSET CONTROL PANEL IS SET TO THE AUTO POSITION
2/4 IS STILL COUNTING s 4HEN CONSULT YOUR LOCAL DEALER
DOWN VISIBLE ON THE > POSITIVE
DISPLAY
s 7AIT FOR THE 2/4 END
01
> NEGATIVE
4HE MANUAL
s #HECK THE REQUIRED ROTATION OF THE SWITCH
operation is possible s #HECK THAT THE SUFFICIENT TORQUE HAS BEEN APPLIED
s 4HEN CONSULT YOUR LOCAL DEALER
> POSITIVE
s 'OAL REACHED
01
> NEGATIVE
Possible to pull
s #HECK THAT THE PRODUCT IS IN THE POSITION FOR STANDARD
THE PADLOCKING
CONFIGURATION
MECHANISM
s 4HEN CONSULT YOUR LOCAL DEALER
> POSITIVE
s 'OAL REACHED