:PRICE ANNEXURE -I
:26/04/2015
:Sohar Refinery Improvement Project (SRIP) Packages 2 & 6
:Oman Oil Refineries and Petroleum Industries Company (ORPIC).
:Supply and Application of Fireproofing Materials, CAFCO Fendolite MII (by Promat)
Date
Project
Client
Scope
S/No.
Particulars
Required Fireproofing
Thickness [mm]
Package - 2
1A
Structures - 90 minutes
4,877.00
27.000
131.679
870.370
114,609.451
1B
3,217.92
34.000
109.409
691.170
75,620.412
Package - 6
2A
Structures - 90 minutes
7,186.00
27.000
194.022
840.318
163,040.179
2B
5,518.05
34.000
187.614
720.588
135,192.181
Total
20,798.97 Sq.m
Note:
1.0 The steel sections upto and including 203mmX203mm shall be protected by solid fill method and others shall be profile fill.
488,462.223
Structures
30%
5%
20
10.00
Wastage
35%
Production (Bags/day)
50
62
Production (sqm/day)
29.63
5.00
5.00
33,750.00
34
77,846.40
19,987.00
Total Manhours
75,080.00
1,501,600.00
2,803,560.00
140,178.00
99,935.00
99,935.00
42,930.00
Staff Site Visit (OMR 150 per return trip) for 6 Trips [AED]
8,586.00
4,774,570.40
OHP [AED]
1,432,371.12
6,206,941.52
310.55
314.82
Note:
1. AHEC shall provide scaffolding, FTA, office facility, Storage at free of cost.