Sie sind auf Seite 1von 10

ACCELA Unified NMS Platform

Why to use Accela-Unified NMS Platform ?

Operator Challenges :
Multi-Vendor / Multi-Technology related Network Complexity
Expertise needed for operations on different vendor Network
Management Systems (NMS)
Dependency on Vendor Tools
Overhead of managing in-house built tools, Excel macros, etc.
Feature and Speed related limitations slowing down network
operations
NMS Operations being very error-prone

Accela-Unified NMS Platform

Mobile network operators usually use internal macros and excel sheets to create scripts and
xml files for bulk parameter changes and rehomes. With Accela Unified NMS Platform , it is
easy, fast and accurate to create OSS/M2000/Netact scripts and to run from the module
itself.

Why to use Accela ?

Reduces operation time


Eliminates operational errors
Eliminates the need for inhouse scripts and excel sheets/macros
Creates accurate Scripts
Applies changes automatically
Eliminates manual work
2G-3G-4G support

Accela Unified NMS Platform

OSS

M2000

Netact

CEX rehoming
Amos scripts
XML import

MML scripts
XML import

MML scripts
XML imports
Rehoming

UNIFIED NMS MODULE

Use Cases : Bulk Parameter Change

Bulk Parameter Change


Unified User Interface for all supported Vendor and Technologies
Automatic Node and Parameter Import
Special functions are available for complex scripting
(e.g PCI change operations done end-2-end with external definition
handling in GSM, UMTS and LTE. )
Different script outputs are available; XML, MML, AMOS, text, etc.

Use Cases : Neighbour Operations

Neighbor Operations
Unified User Interface for all Vendor and Technologies
Automatic Node and Parameter Import
Validation process is done for consistency check and cell data controls
Admin can define neighbour max counts for inter and intra
neighbours. It is possible to define max value for all total neighbour
count as well.
Different script outputs are available; XML, MML, AMOS, text, etc.

Script Execution

Execution Process

Ericsson ,Huawei and Nokia support


Direct Connection to OSS, M2000 and Netact
Detailed operation logging
Paralell executions to keep the implementation time minimum.

Use Cases : Rehoming Operations

Rehoming Operations
Existing Tools

NodeB rehome process takes long time


Works with limited number of sites.
Depends on Vendor NMS.
Difficulty to complete the rehome operation error free.

Accela

No NodeB number limitation.


Scheduled data collection to shorten rehome process.
Multi Telnet sessions for fast rehome activity
One tool for all required operations, NTP, One-Gui, MSS, etc.

Use Cases : Rehoming Operations

Rehoming Operations
Example : Ericsson Rehoming Operation Flow
DATA COLLECTION
Scheduled or On-Demand
Collection
NodeB Alarms
NTP Values

IMPLEMENTATION
LAC
Service Area
IUB
UtranCell

VALIDATION
Cell States
Neighbour Counts
NTP values

Neighbour

Performance Reports

NTP

Cell States

One-Gui

Rehome Data

CNA
MSS

NodeB Alarms
Performance Reports

Thank you!

www.innovile.com

Das könnte Ihnen auch gefallen