Sis Docu. Title

: PRICE ANNEXURE I

Sis Docu. Ref No.

: SO/QTN/ 026/15

Date

: 24/03/2015

Project

: OMAN CONVENTION & EXHIBITION CENTRE

Client

: Eversendai Engineering LLC.

Scope

: Intumescent Fire Proofing of Structural Steel

Design

: Design Standards : BS476 Part 20-22.

S/No.

Sections

Exposure

Section Factor

Area [m2]

Product

Fire Rating

DFT IN [MM]

Unit Rate Fire Paint


[OMR]

Oman Convention Center, Package 3

Bill No. 3 - Rotunda

Bridge -1

Beam

UB 305x102x25

4 sided

315

6.60

Interchar 1190

120 minutes

2.868

19.025

UB 305x127x42

4 sided

200

36.30

Interchar 1190

120 minutes

2.709

17.970

Truss

UC 203x203x52

4 sided

180

59.40

Interchar 1190

120 minutes

2.848

18.892

UC 305x305x198

4 sided

75

88.00

Interchar 1190

120 minutes

1.679

11.137

10

UC 305x305x97

4 sided

145

75.90

Interchar 1190

120 minutes

2.458

16.305

11

Bridge -2

12

Beam

13

UB 305x127x42

4 sided

200

37.40

Interchar 1190

120 minutes

2.709

17.970

14

UC 305x305x198

4 sided

75

63.80

Interchar 1190

120 minutes

1.366

9.061

15

UC 305x305x97

4 sided

145

11.00

Interchar 1190

120 minutes

2.102

13.943

16

Truss

17

UC 203x203x52

4 sided

180

59.40

Interchar 1190

120 minutes

2.848

18.892

18

UC 305x305x198

4 sided

75

82.50

Interchar 1190

120 minutes

1.679

11.137

19

UC 305x305x97

4 sided

145

72.60

Interchar 1190

120 minutes

2.458

16.305

20

Main Roof Radial Truss

21

CHS 139.7x5

4 sided

205

489.50

Interchar 1190

120 minutes

4.070

26.998

2 of 20
22

CHS 193.7x10

4 sided

105

653.40

Interchar 1190

120 minutes

4.219

27.986

23

CHS 273x12.5

4 sided

85

1,674.20

Interchar 1190

120 minutes

3.905

25.903

24

CHS 273x25

4 sided

65

354.20

Interchar 1190

120 minutes

3.427

22.733

25

Main Roof Transfer Truss

26

BU " Box " Sec 900x650x50

4 sided

50

23.10

Interchar 1190

120 minutes

1.401

9.293

27

BU " Box " Taper Sec 430/300x500x25

4 sided

50

14.30

Interchar 1190

120 minutes

1.401

9.293

28

BU " Box " Taper Sec 540/400x500x25

4 sided

50

6.60

Interchar 1190

120 minutes

1.401

9.293

29

BU " Box " Taper Sec 595/300x500x25

4 sided

50

14.30

Interchar 1190

120 minutes

1.401

9.293

30

BU " Box " Taper Sec 650/300x500x25

4 sided

50

14.30

Interchar 1190

120 minutes

1.401

9.293

31

BU " Box " Taper Sec 730/300x500x25

4 sided

50

14.30

Interchar 1190

120 minutes

1.401

9.293

32

CHS 139.7x5

4 sided

205

178.20

Interchar 1190

120 minutes

4.070

26.998

33

CHS 193.7x10

4 sided

105

207.90

Interchar 1190

120 minutes

4.219

27.986

34

CHS 273x12.5

4 sided

85

649.00

Interchar 1190

120 minutes

3.905

25.903

35

RHS 500x350x25

4 sided

50

534.60

Interchar 1190

120 minutes

1.906

12.643

36

RHS 600x400x25

4 sided

50

141.90

Interchar 1190

120 minutes

1.906

12.643

37

UC 203x203x71

4 sided

135

497.20

Interchar 1190

120 minutes

2.347

15.569

38

UC 305x305x137

4 sided

105

152.90

Interchar 1190

120 minutes

2.013

13.353

39

Main Roof Ring Truss

40

CHS 139.7x5

4 sided

205

45.10

Interchar 1190

120 minutes

4.070

26.998

41

CHS 193.7x10

4 sided

105

31.90

Interchar 1190

120 minutes

4.219

27.986

42

CHS 273x12.5

4 sided

85

133.10

Interchar 1190

120 minutes

3.905

25.903

43

UC 152x152x30

4 sided

235

717.20

Interchar 1190

120 minutes

3.623

24.033

44

UC 305x305x137

4 sided

105

2,041.60

Interchar 1190

120 minutes

2.013

13.353

45

Main Roof Support steel work

46

CHS 139.7x5

4 sided

205

333.30

Interchar 1190

120 minutes

4.070

26.998

47

CHS 168.3x10

4 sided

105

204.60

Interchar 1190

120 minutes

4.219

27.986

48

CHS 273x12.5

4 sided

85

2,775.30

Interchar 1190

120 minutes

3.905

25.903

49

Roof Petals

50

Case 1

51

RHS 100x60x5

4 sided

220

408.10

Interchar 1190

120 minutes

4.216

27.966

3 of 20
52

RHS 100x60x5

4 sided

220

3,292.30

Interchar 1190

120 minutes

4.216

27.966

53

RHS 120x60x5

4 sided

215

996.60

Interchar 1190

120 minutes

4.168

27.648

54

UC 254x254x107

4 sided

110

4,748.70

Interchar 1190

120 minutes

2.069

13.724

55

Roof Petal Frames

56

CHS 193.7x10

4 sided

105

1,080.20

Interchar 1190

120 minutes

4.219

27.986

57

RHS 120x60x6.3

4 sided

175

651.20

Interchar 1190

120 minutes

3.778

25.061

58

RHS 200x100x6.3

4 sided

170

2,699.40

Interchar 1190

120 minutes

3.729

24.736

59

Bill No. 4A - Auditorium

60

Column

61

SHS 100x100x5

4 sided

215

124.30

Interchar 1190

120 minutes

4.168

27.648

62

Beam

63

CH 203x89

4 sided

195

71.50

Interchar 1190

120 minutes

3.973

26.354

64

Plate " L " 150x200x12

4 sided

170

103.40

Interchar 1190

120 minutes

2.378

15.774

65

UB 305x127x37

4 sided

225

234.30

Interchar 1190

120 minutes

3.161

20.968

66

UB 305x127x42

4 sided

200

34.10

Interchar 1190

120 minutes

2.709

17.970

67

UB 356x171x67

4 sided

160

1,232.00

Interchar 1190

120 minutes

2.267

15.038

68

UB 406x140x46

4 sided

230

334.40

Interchar 1190

120 minutes

3.288

21.811

69

UB 457x152x60

4 sided

195

82.50

Interchar 1190

120 minutes

2.654

17.605

70

UC 152x152x23

4 sided

305

290.40

Interchar 1190

120 minutes

2.675

17.744

71

UC 152x152x30

4 sided

235

168.30

Interchar 1190

120 minutes

3.414

22.646

72

UC 203x203x46

4 sided

200

333.30

Interchar 1190

120 minutes

2.709

17.970

73

UC 203x203x71

4 sided

135

57.20

Interchar 1190

120 minutes

1.991

13.207

74

UC 254x254x89

4 sided

135

522.50

Interchar 1190

120 minutes

1.991

13.207

75

UC 305x305x137

4 sided

105

332.20

Interchar 1190

120 minutes

1.660

11.011

76

Gallery Frames

77

Composite Column

78

SHS 305x305x20

4 sided

60

12.10

Interchar 1190

120 minutes

2.920

19.369

79

SHS 350x350x20

4 sided

60

72.60

Interchar 1190

120 minutes

2.920

19.369

80

UC 305x305x137

4 sided

105

8.80

Interchar 1190

120 minutes

2.013

13.353

81

UC 305x305x240

4 sided

60

192.50

Interchar 1190

120 minutes

1.512

10.030

4 of 20
82

UC 305x305x97

83

Truss

84

BU " I " Sec 350/260x10 W + 260x20 F

4 sided

145

42.90

Interchar 1190

120 minutes

2.458

16.305

4 sided

90

9.90

Interchar 1190

120 minutes

1.846

12.245

5 of 20
85

BU " I " Sec 515x8 W + 200x12.5 F

4 sided

200

11.00

Interchar 1190

120 minutes

3.129

20.756

86

BU " I " Taper Sec 350/260x10 W + 260x20 F

4 sided

90

33.00

Interchar 1190

120 minutes

1.846

12.245

87

UC 152x152x23

4 sided

305

190.30

Interchar 1190

120 minutes

4.610

30.580

88

UC 203x203x52

4 sided

180

250.80

Interchar 1190

120 minutes

2.848

18.892

89

UC 254x254x89

4 sided

135

499.40

Interchar 1190

120 minutes

2.347

15.569

90

UC 305x305x240

4 sided

60

1,226.50

Interchar 1190

120 minutes

1.512

10.030

91

UC 305x305x97

4 sided

145

336.60

Interchar 1190

120 minutes

2.458

16.305

92

Brace Truss

93

CHS 114.3x3.6

4 sided

285

46.20

Interchar 1190

120 minutes

4.022

26.679

94

CHS 168.3x10

4 sided

105

83.60

Interchar 1190

120 minutes

4.219

27.986

95

Balcony Truss

96

UC 203x203x52

4 sided

180

22.00

Interchar 1190

120 minutes

2.848

18.892

97

UC 254x254x89

4 sided

135

11.00

Interchar 1190

120 minutes

2.347

15.569

98

UC 305x305x240

4 sided

60

93.50

Interchar 1190

120 minutes

1.512

10.030

99

BOX Truss

100

UC 203x203x46

4 sided

200

470.80

Interchar 1190

120 minutes

3.129

20.756

101

UC 203x203x71

4 sided

135

657.80

Interchar 1190

120 minutes

2.347

15.569

102

UC 254x254x73

4 sided

160

1,346.40

Interchar 1190

120 minutes

2.625

17.413

103

UC 254x254x89

4 sided

135

1,499.30

Interchar 1190

120 minutes

2.347

15.569

104

UC 305x305x118

4 sided

120

463.10

Interchar 1190

120 minutes

2.180

14.461

105

UC 305x305x240

4 sided

60

1,939.30

Interchar 1190

120 minutes

1.512

10.030

106

UC 305x305x97

4 sided

145

674.30

Interchar 1190

120 minutes

2.458

16.305

107

Trusses (AT4 TO AT11)

108

RHS 400x600x20

4 sided

50

643.50

Interchar 1190

120 minutes

1.906

12.643

109

UC 152x152x23

4 sided

305

41.80

Interchar 1190

120 minutes

4.610

30.580

110

UC 152x152x37

4 sided

195

34.10

Interchar 1190

120 minutes

3.059

20.292

111

UC 203x203x46

4 sided

200

96.80

Interchar 1190

120 minutes

3.129

20.756

112

UC 254x254x89

4 sided

135

738.10

Interchar 1190

120 minutes

2.347

15.569

113

UC 305x305x118

4 sided

120

520.30

Interchar 1190

120 minutes

2.180

14.461

114

UC 305x305x240

4 sided

60

823.90

Interchar 1190

120 minutes

1.512

10.030

6 of 20
115

UC 305x305x97

4 sided

145

116.60

Interchar 1190

120 minutes

2.458

16.305

7 of 20
116

StageHouse Grid Structure

117

Beam

118

CH 152x89

4 sided

210

510.40

Interchar 1190

120 minutes

2.819

18.700

119

CH 305x89

4 sided

175

700.70

Interchar 1190

120 minutes

2.433

16.139

120

UC 254x254x89

4 sided

135

389.40

Interchar 1190

120 minutes

1.991

13.207

121

Loft Steel Structure

122

Beam

123

UC 203x203x71

4 sided

135

55.00

Interchar 1190

120 minutes

1.991

13.207

124

UC 305x305x97

4 sided

145

1,963.50

Interchar 1190

120 minutes

2.102

13.943

125

Catwalk Structure

126

CHS 60.3x3.2

4 sided

330

210.10

Interchar 1190

120 minutes

4.022

26.679

127

CHS 60.3x3.2

4 sided

330

1.10

Interchar 1190

120 minutes

4.022

26.679

128

RHS 150x100x6.3

4 sided

170

13.20

Interchar 1190

120 minutes

3.729

24.736

129

RHS 60x100x5

4 sided

220

97.90

Interchar 1190

120 minutes

4.216

27.966

130

RHS 60x100x5

4 sided

220

56.10

Interchar 1190

120 minutes

4.216

27.966

131

SHS 80x80x5

4 sided

220

226.60

Interchar 1190

120 minutes

4.216

27.966

132

UC 152x152x23

4 sided

305

33.00

Interchar 1190

120 minutes

4.610

30.580

133

UC 254x254x89

4 sided

135

821.70

Interchar 1190

120 minutes

2.347

15.569

134

Bill No. 5 - Ballroom, Foodcourt & BOH

135

Column

136

UC 203x203x46

4 sided

200

5.50

Interchar 1190

120 minutes

3.129

20.756

137

UC 305x305x97

4 sided

145

25.30

Interchar 1190

120 minutes

2.458

16.305

138

Beam

139

BU " I " Sec 463x20 W + 300x25 F

4 sided

150

79.20

Interchar 1190

120 minutes

2.157

14.308

140

Cheqd.Plate 8 mm tk

141

PFC 100x50x10

4 sided

295

3.30

Interchar 1190

120 minutes

2.499

16.577

142

PFC 200x75x23

4 sided

225

73.70

Interchar 1190

120 minutes

3.161

20.968

143

UB 254x102x22

4 sided

320

26.40

Interchar 1190

120 minutes

2.637

17.492

144

UB 254x146x43

4 sided

195

1,753.40

Interchar 1190

120 minutes

2.654

17.605

145

UB 356x171x57

4 sided

190

434.50

Interchar 1190

120 minutes

2.599

17.240

8 of 20
146

UB 457x191x89

4 sided

145

689.70

Interchar 1190

120 minutes

2.102

13.943

9 of 20
147

UB 457x191x98

4 sided

135

64.90

Interchar 1190

120 minutes

1.991

13.207

148

UC 152x152x23

4 sided

305

244.20

Interchar 1190

120 minutes

2.675

17.744

149

UC 152x152x30

4 sided

235

106.70

Interchar 1190

120 minutes

3.414

22.646

150

UC 203x203x46

4 sided

200

470.80

Interchar 1190

120 minutes

2.709

17.970

151

UC 305x305x158

4 sided

90

74.80

Interchar 1190

120 minutes

1.496

9.924

152

UC 305x305x198

4 sided

75

94.60

Interchar 1190

120 minutes

1.366

9.061

153

UC 305x305x240

4 sided

60

119.90

Interchar 1190

120 minutes

1.237

8.206

154

UC 305x305x97

4 sided

145

201.30

Interchar 1190

120 minutes

2.102

13.943

155

Trusses (BT1 TO BT10)

156

UC 152x152x23

4 sided

305

345.40

Interchar 1190

120 minutes

4.610

30.580

157

UC 152x152x30

4 sided

235

1,087.90

Interchar 1190

120 minutes

3.623

24.033

158

UC 203x203x46

4 sided

200

809.60

Interchar 1190

120 minutes

3.129

20.756

159

UC 203x203x60

4 sided

160

885.50

Interchar 1190

120 minutes

2.625

17.413

160

UC 254x254x73

4 sided

160

578.60

Interchar 1190

120 minutes

2.625

17.413

161

UC 254x254x89

4 sided

135

537.90

Interchar 1190

120 minutes

2.347

15.569

162

UC 305x305x118

4 sided

120

632.50

Interchar 1190

120 minutes

2.180

14.461

163

UC 305x305x137

4 sided

105

1,163.80

Interchar 1190

120 minutes

2.013

13.353

164

UC 305x305x198

4 sided

75

376.20

Interchar 1190

120 minutes

1.679

11.137

165

UC 305x305x97

4 sided

145

14,600.30

Interchar 1190

120 minutes

2.458

16.305

166

Theatre Seating (D1(16)S550-3)

167

Stub Column

168

UC 305x305x97

4 sided

145

6.60

Interchar 1190

120 minutes

2.458

16.305

169

Beam

170

UB 533x312x219

4 sided

85

188.10

Interchar 1190

120 minutes

1.453

9.638

171

UC 203x203x46

4 sided

200

49.50

Interchar 1190

120 minutes

2.709

17.970

172

Auditorium Shell Structure

173

Vertical Frames

174

RHS 100x50x3

4 sided

355

931.70

Interchar 1190

120 minutes

4.022

26.679

175

Horizontal Members

176

SHS 50x50x2.5

4 sided

365

514.80

Interchar 1190

120 minutes

4.022

26.679

10 of 20
177

Mashrabia Frame

178

RHS 50x100x6.3

4 sided

180

127.60

Interchar 1190

120 minutes

3.827

25.386

179

SHS 50x50x3

4 sided

365

23.10

Interchar 1190

120 minutes

4.022

26.679

Total

75,906.60

Notes:1

The pricing is based on the assumption of continuous hindrance free work front and also under the assumption of doing the job before the steel erection.

The pricing is purely based on the BOQ provided by you and any increase / change in the quantity at a later stage shall be considered as variation and shall be charged on pro rata basis.

11

Fireproofing of Purlins are not considered in our scope of works.


In the event of any change in the drawings/specification/design, separate prices will be applicable.
The priming and painting of the steel members are not considered in our scope of works.
The compatibility of the primer used should be confirmed before priming of steel.
Any Touchup / Repair Works required to be done shall be carried out at separate additional cost.
If there is any Flute filling required to be done shall be carried out at separate additional cost.
All sections considered as part of beams and all are treated as 4 sided.
The details provided above are all for Intumescent coating .
All the plates connected to beams and columns shall be measured and paid accordingly.

12

Provision of masking of surrounding areas to prevent them from over spray & required, erected and safe scaffolding shall be in Main contractors scope.

13

The sections which are not sound enough for desired (2 hours) fire rating are considered for maximum possible fire ratings.

4
5
6
7
8
9
10

11 of 20

Unit Rate for Top Coat Unit Rate including Top


[OMR]
Coat [OMR]

Total Price

0.900

19.925

131.502

0.900

18.870

684.975

0.900

19.792

1,175.638

0.900

12.037

1,059.296

0.900

17.205

1,305.849

0.900

18.870

705.732

0.900

9.961

635.525

0.900

14.843

163.277

0.900

19.792

1,175.638

0.900

12.037

993.090

0.900

17.205

1,249.073

0.900

27.898

13,656.017

12 of 20
0.900

28.886

18,874.285

0.900

26.803

44,874.219

0.900

23.633

8,370.674

0.900

10.193

235.467

0.900

10.193

145.765

0.900

10.193

67.276

0.900

10.193

145.765

0.900

10.193

145.765

0.900

10.193

145.765

0.900

27.898

4,971.404

0.900

28.886

6,005.454

0.900

26.803

17,395.394

0.900

13.543

7,240.215

0.900

13.543

1,921.785

0.900

16.469

8,188.169

0.900

14.253

2,179.285

0.900

27.898

1,258.195

0.900

28.886

921.472

0.900

26.803

3,567.530

0.900

24.933

17,881.779

0.900

14.253

29,098.945

0.900

27.898

9,298.366

0.900

28.886

5,910.130

0.900

26.803

74,387.421

0.900

28.866

11,780.363

13 of 20
0.900

28.866

95,036.730

0.900

28.548

28,450.898

0.900

14.624

69,447.267

0.900

28.886

31,202.942

0.900

25.961

16,905.764

0.900

25.636

69,201.559

0.900

28.548

3,548.512

0.900

27.254

1,948.693

0.900

16.674

1,724.112

0.900

21.868

5,123.705

0.900

18.870

643.462

0.900

15.938

19,635.481

0.900

22.711

7,594.418

0.900

18.505

1,526.663

0.900

18.644

5,414.308

0.900

23.546

3,962.857

0.900

18.870

6,289.320

0.900

14.107

806.925

0.900

14.107

7,370.947

0.900

11.911

3,956.975

0.900

20.269

245.261

0.900

20.269

1,471.565

0.900

14.253

125.426

0.900

10.930

2,103.964

14 of 20
0.900

17.205

738.089

0.900

13.145

130.138

15 of 20
0.900

21.656

238.215

0.900

13.145

433.793

0.900

31.480

5,990.629

0.900

19.792

4,963.806

0.900

16.469

8,224.400

0.900

10.930

13,405.256

0.900

17.205

5,791.158

0.900

27.579

1,274.172

0.900

28.886

2,414.892

0.900

19.792

435.422

0.900

16.469

181.154

0.900

10.930

1,021.925

0.900

21.656

10,195.584

0.900

16.469

10,833.020

0.900

18.313

24,656.143

0.900

16.469

24,691.315

0.900

15.361

7,113.580

0.900

10.930

21,195.934

0.900

17.205

11,601.242

0.900

13.543

8,715.073

0.900

31.480

1,315.861

0.900

21.192

722.631

0.900

21.656

2,096.288

0.900

16.469

12,155.445

0.900

15.361

7,992.217

0.900

10.930

9,004.966

16 of 20
0.900

17.205

2,006.088

17 of 20

0.900

19.600

10,003.595

0.900

17.039

11,939.250

0.900

14.107

5,493.295

0.900

14.107

775.889

0.900

14.843

29,144.980

0.900

27.579

5,794.450

0.900

27.579

30.337

0.900

25.636

338.394

0.900

28.866

2,826.017

0.900

28.866

1,619.403

0.900

28.866

6,541.118

0.900

31.480

1,038.837

0.900

16.469

13,532.217

0.900

21.656

119.107

0.900

17.205

435.283

0.900

15.208

1,204.491

0.900

17.477

57.674

0.900

21.868

1,611.682

0.900

18.392

485.555

0.900

18.505

32,446.688

0.900

18.140

7,881.906

18 of 20
0.900

14.843

10,237.480

19 of 20
0.900

14.107

915.549

0.900

18.644

4,552.941

0.900

23.546

2,512.399

0.900

18.870

8,883.925

0.900

10.824

809.601

0.900

9.961

942.330

0.900

9.106

1,091.750

0.900

14.843

2,987.973

0.900

31.480

10,873.164

0.900

24.933

27,124.355

0.900

21.656

17,532.593

0.900

18.313

16,215.846

0.900

18.313

10,595.696

0.900

16.469

8,858.439

0.900

15.361

9,715.697

0.900

14.253

16,587.653

0.900

12.037

4,528.492

0.900

17.205

251,196.231

0.900

17.205

113.552

0.900

10.538

1,982.257

0.900

18.870

934.057

0.900

27.579

25,695.808

0.900

27.579

14,197.920

20 of 20

0.900

26.286

3,354.091

0.900

27.579

637.086
1,467,619.751

doing the job before the steel erection.


shall be considered as variation and shall be charged on pro rata basis.

ng shall be in Main contractors scope.