Project Title
Client
Value of the Project:
Date:
Contract/Job No.
Client Representative
1-Nov-16
REP-BPXO-14-0727
Jacobs Engineering Group Inc.
Completion Date:
Anticipated Completion
To:
25-Oct-16
1. CONCERNS
a
Manufacturing ITP for Transformer includng FAT and SAT procedure for the same
Required documents for equipments that arrived (drop arm barrier,pressure washer and submersible pump) for receiving inspection
Receiving inspection procedure. BAUER permanent Materials/equipment shall be endorsed to QA/QC personnel for internal inspection.
Lifting plan procedure and erection of structural steel method statement preparation.
2.
KEY EVENTS
a.
Material Receiving inspection for Split type AC units have been raised
Backfilling and compaction for weighbridge, vehicle wash bay and drop arm barrier have been inspected and approved by client.
Form work and reinforcement rebar installations for valve pits VP-1 and VP-2 have been inspected and approved by client.
Backfilling of clean washed sand and compaction of the same is ongoing for cess tank installations.
Excavation of cable trench for light poles on the southwest portion of the facility.
c.
3.
QC Staff
QA/QC Engineer (Muscat)
QA/QC Supervisor
QA/QC Inspector (Subcon)
5.
Required
Available
1
1
1
1
2
QC DOCUMENTS STATUS
QC
Document Description
Doc
um
Manufactuiring ITP
ents
Method Statement
Stat Data Sheets
us: RFI Raised
To be
Mobilized
Descipline
Status
EL CV ME
6
4
1
3
9
40 1
39 approved, 5 to
be signed
PROJECT STATUS
Item
Electrical
Civil
Mechanical
Instrumentation
6.
4.
Scope
Unit
100
100
100
100
%
%
%
%
Remarks
NCR STATUS
NCRs Issued By
Construction
Operation
Client
Internal Audit
External
Total Issued
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Remarks
OTHERS
There are 8 nos. of Method statements for permit purposes as of this moment.