Beruflich Dokumente
Kultur Dokumente
CONSULTANCY SERVICES
Front End Engineering Design
- Route
exis<ng
driveways
throughout
JOB
LOCATION
- The
distance
of
each
route
exis<ng
in
kilo
meters
throughout
JOB
LOCATION
- Condi<ons
and
the
strength
of
the
bridge
that
will
be
passed
heavy
transport
and
heavy
equipment,
including
the
width
of
the
road
and
complete
descrip<ons
illustrated
with
photos
throughout
JOB
LOCATION
- Exis<ng
condi<on
survey
equipment
throughout
LOCATION
WORK,
for
process
systems,
mechanical
systems,
piping
systems,
electrical
systems,
instrumenta<on
systems
and
civilian
infrastructure
in
accordance
with
the
agreed
scope
of
work.
Making
and
preparing
the
technical
design
and
technical
report
giving
the
results
of
the
inves<ga<on
of
soil
and
founda<on
construc<ons
proposed
op<mum
prices
accompanied
by
analysis
of
the
proposed
founda<on
type
per
unit
volume
complete
with
suppor<ng
data
in
wri<ng
and
authen<c.
The
price
listed
is
the
price
to
be
the
latest
and
most
up
to
date.
Implement
the
a
complete
analysis
of
the
gas
composi<on
(C1-C11,
CO2,
N2,
H2S,
mercaptan),
oil
and
water
SP
Raja,
Dewa
and
Abab
II
&
III
Field
Adera,
southern
Sumatra
as
a
basic
engineering
design,
sample
analysis
can
be
taken
at
the
SP
Raja,
Dewa
and
Abab
II
&
III.
The
analysis
is
the
basis
to
quan<fy
the
produc<on
process
simula<on
with
uid.
Sampling
ac<vi<es
must
be
no<ed
in
advance
and
approved
by
the
CLIENT.
Make
presenta<ons
to
the
CLIENT
before
the
survey
begins
manufacture
of
the
design
/
engineering
design.
2.
DESIGN
ENGINEERING
- HAZOPS
Safety
Analysis
&
Design
- Design
Process
and
Process
Safety
- Criteria
for
Design,
Opera<on
and
Maintenance
- Mechanical
Design
- Design
Corrosion
- Electrical
Design
- Civil
Design
&
Topography
- Design
Instrumenta<on
&
Control
CONSULTANCY SERVICES
Front End Engineering Design
3.
BID
DOCUMENT
Most
documents
FEED
results
will
be
included
in
the
tender
documents
EPC
Contract.
Tender
document
formats
include
the
standard
Client
like
this
FEED
contract.
Fill
EPC
tender
documents
include:
- Technical
explana<on
of
the
project
- Philosophy
of
design,
safety
and
opera<on
- Exis<ng
eld
condi<ons,
route
and
distance
- Prepara<on
of
documents
and
images
- Iden<ca<on
of
equipment,
piping
&
instrumenta<on
- Quality
control
and
assurance
- Inspec<on
for
internal
or
client
use
the
services
of
a
third
party
- Construc<on
guide
- Manufacture
/
Vendor
List
- Project
Schedule
- Construc<on
equipment
list
- Cost
Es<mate
CONSULTANCY SERVICES
Front End Engineering Design
B. FEED
Upgrading
Electrical
System
Field
Pendopo
-
Pertamina
EP,
PT
Asset
2
Field
Pendopo
(2013)
The
Scope
of
Work
to
be
performed
are
as
follows:
1.
SURVEY
AND
DATA
COLLETION
Implement
Survey
and
Mapping,
but
are
not
limited
to:
- Map
of
the
area
around
the
situa<on
JOB
LOCATION
- Map
of
land
acquisi<on
for
the
en<re
JOB
LOCATION
Implement
Field
Survey
but
not
limited
to:
- Topographic
Survey
include
height,
coordinates,
the
data
of
earthquake
accelera<on,
etc.
throughout
JOB
LOCATION
- Climatology
Survey
among
others
include
humidity,
wind
speed,
rainfall,
average
temperature,
air
pressure,
and
others
are
needed
throughout
JOB
LOCATION
- Route
exis<ng
driveways
throughout
JOB
LOCATION
- Survey
of
exis<ng
condi<ons
in
the
whole
electrical
system
equipment
JOB
LOCATION,
electrical
systems
include:
Electrical
Power
Genera<ng
System
Electrical
Transmission
System
Electrical
Distribu<on
System
Electrical
Load
Electrical
Protec<on
System
Crea<ng
and
preparing
the
technical
design
and
technical
report
giving
the
results
of
the
eld
survey
and
the
selec<on
of
proposals
for
the
specica<on
of
equipment
and
systems
op<mum
accompanied
by
an
analysis
of
the
design
of
the
proposed
price
per
unit
volume
complete
with
the
data
suppor<ng
wri_en
and
authen<c.
The
price
listed
is
the
price
to
be
the
latest
and
most
up
to
date.
Make
presenta<ons
to
the
Client
before
the
survey
begins
manufacture
of
dra`ing
/
design
engineering
CONSULTANCY SERVICES
Front End Engineering Design
The
Scope
of
Work
to
be
performed
are
as
follows:
2.
DESIGN
OF
ELECTRICAL
ENGINEERING
JOB
LOCATION
Job
loca<on
in
this
FEED
work
is
some
loca<on
SP
/
SKG
/
Booster
/
PPP
/
Power
Plant
/
WTP
in
Field
Hall,
PT.
Pertamina
EP
Asset
2,
South
Sumatra,
which
covers:
a) SP/SKG
16
Sopa
f) Booster
Talang
Akar
b) SP2
Jirak
g) Booster
Serdang
c) SP
Betung
h) Power
Plant
Pendopo
d) SP1
Benuang
i) Komperta
Pendopo
e) PPP
Pengabuan
j) WTP
Teluk
Lubuk
k) WTP
Pendopo
DESIGN
ELECTRICAL
FEED
job
should
cover
the
en<re
Electrical
System
Wide
JOB
LOCATION.
Electrical
system
may
include;
a.
Electrical
Power
Genera<ng
System
d.
Electrical
Load
- Genera<ng
Set
- Electrical
Motor
- Generator
Control
Panel
- Ligh<ng
System
- Generator
Synchronizing
System
- Hea<ng
Ven<la<ng
&
Air
Condi<oning
- Low
Voltage
Switchgear
e.
Electrical
Protec<on
System
- Medium
Voltage
Switchgear
- External
&
Internal
Lightning
Protec<on
System
b.
Electrical
Transmission
System
- Grounding
&
Bonding
Protec<on
System
- Medium
Voltage
Over
Head
Electrical
Transmission
Line
c.
Electrical
Distribu<on
System
- Electrical
Distribu<on
Panel
- Motor
Control
Center
CONSULTANCY SERVICES
Front End Engineering Design
Upgrading
FEED
design
of
the
electrical
system
must
be
accompanied
by
a
calcula<on,
the
calcula<on
either
manually
or
with
special
so`ware,
taking
into
account
the
exis<ng
condi<ons
and
also
considering
the
future
development
plan.
CRITERIA
DESIGN,
OPERATION
AND
MAINTENANCE
Develop
some
criteria:
design,
opera<on
and
maintenance.
The
d
esign
criteria
will
be
used
by
Pertamina
as
the
basic
requirements
electrical
design
should
consider
the
reliability
/
system
reliability
and
ease
of
opera<on
and
maintenance.
Specica<ons
protec<on
equipment
should
be
considered
hazardous
area
electrical
Classica<on.
3.
BID
DOCUMENT
BID
DOCUMENT
EPC
Most
documents
will
be
included
in
the
results
FEED
EPC
contract
bid
document.
The
format
follows
the
standard
bidding
documents
Client
as
in
this
FEED
contract.
Fill
EPC
tender
documents
include:
Technical
explana<on
of
the
project
The
philosophy
of
design,
safety
and
opera<on
Exis<ng
eld
condi<ons,
route
and
distance
The
scope
of
work,
job
descrip<on
and
<me
period.
Needs
of
the
en<re
human
resources
for
the
comple<on
of
this
EPC
Project
The
main
work
required
equipment
List
of
major
equipment,
specica<ons,
data
sheets
and
drawings.
Data
sheets,
drawings,
technical
specica<ons,
procedures
and
other
documents
as
may
be
necessary
Needs
of
spare
parts
for
at
least
2
years
Vendor
list
for
the
material
used
in
the
EPC
project
is
not
out
of
the
Approved
Manufacturer
List
BID
DOCUMENT
PROJECT
MANAGEMENT
TEAM
Make
PMT
tender
documents
for
EPC
projects
as
well
oversight
for
the
maintenance
PJIT
SKPP
/
SKPI.
The
format
follows
the
standard
bidding
documents
as
the
CLIENT
in
this
FEED
contract.
CONSULTANCY SERVICES
Front End Engineering Design
C. FEED
for
Unit
Enzim
Bio
Center
Petrosida
Gresik,
PT
(2013)
The
Scope
of
Work
to
be
performed
are
as
follows:
1.
Data
Collec<on
This
ac<vity
is
to
collect
all
of
the
data
associated
with
the
manufacture
of
FEED
documents,
is
data
which
rela<ng
to
the
technical
data
and
opera<onal
data
/
maintenance
on
exis<ng
facili<es,
the
survey
data
that
have
been
conducted,
and
the
data
plan
will
be
provided
by
the
client.
2.
Making
documents
FEED
&
Deliverable
List
FEED
documents
include;
General
- Compile
a
list
of
codes
and
standards
that
will
be
used
on
the
project
of
making
this
FEED.
- Crea<ng
project
planning
and
progress
measurement
through
project
control
procedures.
- Develop
procedures
for
numbering
documents
and
engineering
drawings.
- Create
a
master
document
and
a
master
drawing
in
a
format
to
be
approved
by
the
client.
- Make
FEED
documents
which
include
Specica<on,
Datasheet,
Pictures,
Calcula<on
procedure
for
Process,
Mechanical,
Civil
&
Structural,
Electrical,
Instrumenta<on
and
Control
3.
Tender
documents
- Terms
of
Reference
EPC
- Request
for
Quota<on
(RFQ)
- Bill
of
Quality
(BOQ)
- Engineer
Es<mate
CONSULTANCY SERVICES
Front End Engineering Design
D. FEED
of
Oil
PipeLine
From
East
Musi
SP-
Sopa
Sp-
Jirak
Field
Pavilion
PT
Pertamina
EP
Asset
2
Field
Pendopo
(2012)
The
Scope
of
Work
to
be
performed
are
as
follows:
1.
Data
Collec<on
This
ac<vity
is
to
collect
all
of
the
data
associated
with
the
manufacture
of
FEED
documents,
is
data
which
rela<ng
to
the
technical
data
and
opera<onal
data
/
maintenance
on
exis<ng
facili<es,
the
survey
data
that
have
been
conducted,
and
the
data
plan
will
be
provided
by
the
client.
2.
Making
documents
FEED
&
Deliverable
List
FEED
documents
include;
General
- Compile
a
list
of
codes
and
standards
that
will
be
used
on
the
project
of
making
this
FEED.
- Crea<ng
project
planning
and
progress
measurement
through
project
control
procedures.
- Develop
procedures
for
numbering
documents
and
engineering
drawings.
- Create
a
master
document
and
a
master
drawing
in
a
format
to
be
approved
by
the
client.
- Make
FEED
documents
which
include
Specica<on,
Datasheet,
Pictures,
Calcula<on
procedure
for
Process,
Pipeline,
Mechanical,
Civil
&
Structural,
Electrical,
Instrumenta<on
and
Control
- Topography
&
Bathymetry
Survey
- Soil
Inves<ga<on
&
Resis<vity
Survey
3.
Tender
documents
- Terms
of
Reference
EPC
- Request
for
Quota<on
(RFQ)
- Bill
of
Quality
(BOQ)
- Engineer
Es<mate
CONSULTANCY SERVICES
Front End Engineering Design
E.
FEED
Pipeline
8,
265
Km
Formula5on
Service
oil
Pipeline
Construc5on
Tampino
to
Plaju
PT
Pertamina
Gas
(2010)
Scope
of
Work:
Prepara<on
of
engineering
documents
and
document
for
EPC
construc<on
of
oil
pipeline
from
Tempino
to
Plaju,
South
Sumatera,
265
Km
F.
Detail
Engineering
Design
for
Condensate
Plant
Pertamina
EP
Region
Jawa
PT.
Putra
Dharma
Harmoteknik
(2009)
Scope
of
Work:
Prepara<on
detail
engineering
document
for
Design
Condensate
Plant
G.
Emulsion
Matrix
Plant
Project
-
PT
BBRI
JO
PT
Dahana
(2009)
Scope
of
Work:
1.
Engineering
for
plant
dismantling
procedure
2. Detail Engineering Design for Ammonium Nitrat and Nitric Acid Plant.