SUPPLEMENTARY SPECIFICATIONS
SUPPLEMENTARY SPECIFICATIONS
SECTION 1 - CONTENTSPRELIMINARIES
1.1
General
1.1.1
This Supplementary Specification shall be read in conjunction with the JTC Corporation
Standard Specification for Civil & Structural Works [Edition November 2011] & JTC
Corporation Standard Preliminaries [2 nd Edition - April 2015]. In the event of any
discrepancies between the Supplementary Specifications and the Standard
Specifications & Preliminaries, the former shall prevail.
1.1.2
The successful Tenderer shall be bound by all the documents forming this Contract and
he shall be deemed to have acquainted himself with all such documents before tendering
as no claim for extra payments for lack of knowledge in this respect will be entertained.
1.1.3
In case of discrepancies between the documents, the Contractor shall immediately refer
the matter to the Superintending Officer. The Superintending Officers interpretation and
decision shall be final.
1.2
Standard Preliminaries
1.2.1
The provisions in JTC Corporation Standard Preliminaries [2 nd Edition - April 2015] shall
apply to the whole of the Works included in this Contract.
1.2.2
1.2.3
The Contractor shall supply and install one (1) computer at the Site Office each with the
following items including testing, commissioning and warranty for the exclusive use of the
Superintending Officer:
PentiumTM - 4 Core 2 Duo Processor Microcomputers
At least 2 GB RAM
A 160 GB or higher Formatted Hard Disk with an average seek time of 12ms or
below
1 unit of wireless modem and/or wireless router or USB modem or equivalent that
is able to connect back to main office
At least 3 PCI slots and those with more than 3 PCI slots should include 1 set of
shared slots
On board IDE Controller (Support 4 fast-IDE interface with DMA or PIO transfer)
1
SECTION 1 - PRELIMINARIES
1.1
General
1.2
Standard Preliminaries
1.3
1.4
1.5
SUPPLEMENTARY SPECIFICATIONS
SECTION 1 - CONTENTSPRELIMINARIES
1.1
General
1.1.1
This Supplementary Specification shall be read in conjunction with the JTC Corporation
Standard Specification for Civil & Structural Works [Edition November 2011] & JTC
Corporation Standard Preliminaries [2 nd Edition - April 2015]. In the event of any
discrepancies between the Supplementary Specifications and the Standard
Specifications & Preliminaries, the former shall prevail.
1.1.2
The successful Tenderer shall be bound by all the documents forming this Contract and
he shall be deemed to have acquainted himself with all such documents before tendering
as no claim for extra payments for lack of knowledge in this respect will be entertained.
1.1.3
In case of discrepancies between the documents, the Contractor shall immediately refer
the matter to the Superintending Officer. The Superintending Officers interpretation and
decision shall be final.
1.2
Standard Preliminaries
1.2.1
The provisions in JTC Corporation Standard Preliminaries [2 nd Edition - April 2015] shall
apply to the whole of the Works included in this Contract.
1.2.2
1.2.3
The Contractor shall supply and install one (1) computer at the Site Office each with the
following items including testing, commissioning and warranty for the exclusive use of the
Superintending Officer:
PentiumTM - 4 Core 2 Duo Processor Microcomputers
At least 2 GB RAM
A 160 GB or higher Formatted Hard Disk with an average seek time of 12ms or
below
1 unit of wireless modem and/or wireless router or USB modem or equivalent that
is able to connect back to main office
At least 3 PCI slots and those with more than 3 PCI slots should include 1 set of
shared slots
On board IDE Controller (Support 4 fast-IDE interface with DMA or PIO transfer)
1.6
1.7
1.8
1.9
1.10
1.11
Insurance Policies
1.12
Security Deposit
1.13
10
SUPPLEMENTARY SPECIFICATIONS
SECTION 1 - CONTENTSPRELIMINARIES
1.1
General
1.1.1
This Supplementary Specification shall be read in conjunction with the JTC Corporation
Standard Specification for Civil & Structural Works [Edition November 2011] & JTC
Corporation Standard Preliminaries [2 nd Edition - April 2015]. In the event of any
discrepancies between the Supplementary Specifications and the Standard
Specifications & Preliminaries, the former shall prevail.
1.1.2
The successful Tenderer shall be bound by all the documents forming this Contract and
he shall be deemed to have acquainted himself with all such documents before tendering
as no claim for extra payments for lack of knowledge in this respect will be entertained.
1.1.3
In case of discrepancies between the documents, the Contractor shall immediately refer
the matter to the Superintending Officer. The Superintending Officers interpretation and
decision shall be final.
1.2
Standard Preliminaries
1.2.1
The provisions in JTC Corporation Standard Preliminaries [2 nd Edition - April 2015] shall
apply to the whole of the Works included in this Contract.
1.2.2
1.2.3
The Contractor shall supply and install one (1) computer at the Site Office each with the
following items including testing, commissioning and warranty for the exclusive use of the
Superintending Officer:
PentiumTM - 4 Core 2 Duo Processor Microcomputers
At least 2 GB RAM
A 160 GB or higher Formatted Hard Disk with an average seek time of 12ms or
below
1 unit of wireless modem and/or wireless router or USB modem or equivalent that
is able to connect back to main office
At least 3 PCI slots and those with more than 3 PCI slots should include 1 set of
shared slots
On board IDE Controller (Support 4 fast-IDE interface with DMA or PIO transfer)
1.14
10
1.15
10
1.16
10
1.17
11
1.18
11
1.19
Site Management
11
1.20
12
1.21
14
SUPPLEMENTARY SPECIFICATIONS
SECTION 1 - CONTENTSPRELIMINARIES
1.1
General
1.1.1
This Supplementary Specification shall be read in conjunction with the JTC Corporation
Standard Specification for Civil & Structural Works [Edition November 2011] & JTC
Corporation Standard Preliminaries [2 nd Edition - April 2015]. In the event of any
discrepancies between the Supplementary Specifications and the Standard
Specifications & Preliminaries, the former shall prevail.
1.1.2
The successful Tenderer shall be bound by all the documents forming this Contract and
he shall be deemed to have acquainted himself with all such documents before tendering
as no claim for extra payments for lack of knowledge in this respect will be entertained.
1.1.3
In case of discrepancies between the documents, the Contractor shall immediately refer
the matter to the Superintending Officer. The Superintending Officers interpretation and
decision shall be final.
1.2
Standard Preliminaries
1.2.1
The provisions in JTC Corporation Standard Preliminaries [2 nd Edition - April 2015] shall
apply to the whole of the Works included in this Contract.
1.2.2
1.2.3
The Contractor shall supply and install one (1) computer at the Site Office each with the
following items including testing, commissioning and warranty for the exclusive use of the
Superintending Officer:
PentiumTM - 4 Core 2 Duo Processor Microcomputers
At least 2 GB RAM
A 160 GB or higher Formatted Hard Disk with an average seek time of 12ms or
below
1 unit of wireless modem and/or wireless router or USB modem or equivalent that
is able to connect back to main office
At least 3 PCI slots and those with more than 3 PCI slots should include 1 set of
shared slots
On board IDE Controller (Support 4 fast-IDE interface with DMA or PIO transfer)
1.22
Materials
14
1.23
14
1.24
Progress Photographs
15
1.25
15
1.26
15
1.27
16
1.28
16
1.29
17
SUPPLEMENTARY SPECIFICATIONS
SECTION 1 - CONTENTSPRELIMINARIES
1.1
General
1.1.1
This Supplementary Specification shall be read in conjunction with the JTC Corporation
Standard Specification for Civil & Structural Works [Edition November 2011] & JTC
Corporation Standard Preliminaries [2 nd Edition - April 2015]. In the event of any
discrepancies between the Supplementary Specifications and the Standard
Specifications & Preliminaries, the former shall prevail.
1.1.2
The successful Tenderer shall be bound by all the documents forming this Contract and
he shall be deemed to have acquainted himself with all such documents before tendering
as no claim for extra payments for lack of knowledge in this respect will be entertained.
1.1.3
In case of discrepancies between the documents, the Contractor shall immediately refer
the matter to the Superintending Officer. The Superintending Officers interpretation and
decision shall be final.
1.2
Standard Preliminaries
1.2.1
The provisions in JTC Corporation Standard Preliminaries [2 nd Edition - April 2015] shall
apply to the whole of the Works included in this Contract.
1.2.2
1.2.3
The Contractor shall supply and install one (1) computer at the Site Office each with the
following items including testing, commissioning and warranty for the exclusive use of the
Superintending Officer:
PentiumTM - 4 Core 2 Duo Processor Microcomputers
At least 2 GB RAM
A 160 GB or higher Formatted Hard Disk with an average seek time of 12ms or
below
1 unit of wireless modem and/or wireless router or USB modem or equivalent that
is able to connect back to main office
At least 3 PCI slots and those with more than 3 PCI slots should include 1 set of
shared slots
On board IDE Controller (Support 4 fast-IDE interface with DMA or PIO transfer)
1.30
17
1.31
17
1.32
CCTV System
18
1.33
22
1.34
22
1.35
23
1.36
24
1.37
24
SUPPLEMENTARY SPECIFICATIONS
SECTION 1 - CONTENTSPRELIMINARIES
1.1
General
1.1.1
This Supplementary Specification shall be read in conjunction with the JTC Corporation
Standard Specification for Civil & Structural Works [Edition November 2011] & JTC
Corporation Standard Preliminaries [2 nd Edition - April 2015]. In the event of any
discrepancies between the Supplementary Specifications and the Standard
Specifications & Preliminaries, the former shall prevail.
1.1.2
The successful Tenderer shall be bound by all the documents forming this Contract and
he shall be deemed to have acquainted himself with all such documents before tendering
as no claim for extra payments for lack of knowledge in this respect will be entertained.
1.1.3
In case of discrepancies between the documents, the Contractor shall immediately refer
the matter to the Superintending Officer. The Superintending Officers interpretation and
decision shall be final.
1.2
Standard Preliminaries
1.2.1
The provisions in JTC Corporation Standard Preliminaries [2 nd Edition - April 2015] shall
apply to the whole of the Works included in this Contract.
1.2.2
1.2.3
The Contractor shall supply and install one (1) computer at the Site Office each with the
following items including testing, commissioning and warranty for the exclusive use of the
Superintending Officer:
PentiumTM - 4 Core 2 Duo Processor Microcomputers
At least 2 GB RAM
A 160 GB or higher Formatted Hard Disk with an average seek time of 12ms or
below
1 unit of wireless modem and/or wireless router or USB modem or equivalent that
is able to connect back to main office
At least 3 PCI slots and those with more than 3 PCI slots should include 1 set of
shared slots
On board IDE Controller (Support 4 fast-IDE interface with DMA or PIO transfer)
1.38
24
1.39
Defects
25
1.40
Biometric Form Computerised Time Attendance System For Manpower Data Collection
28
1.41
Project Meetings
29
1.42
29
1.43
Engagement of Subcontractors
30
1.44
Irregularities Committed
30
1.45
32
SUPPLEMENTARY SPECIFICATIONS
SECTION 1 - CONTENTSPRELIMINARIES
1.1
General
1.1.1
This Supplementary Specification shall be read in conjunction with the JTC Corporation
Standard Specification for Civil & Structural Works [Edition November 2011] & JTC
Corporation Standard Preliminaries [2 nd Edition - April 2015]. In the event of any
discrepancies between the Supplementary Specifications and the Standard
Specifications & Preliminaries, the former shall prevail.
1.1.2
The successful Tenderer shall be bound by all the documents forming this Contract and
he shall be deemed to have acquainted himself with all such documents before tendering
as no claim for extra payments for lack of knowledge in this respect will be entertained.
1.1.3
In case of discrepancies between the documents, the Contractor shall immediately refer
the matter to the Superintending Officer. The Superintending Officers interpretation and
decision shall be final.
1.2
Standard Preliminaries
1.2.1
The provisions in JTC Corporation Standard Preliminaries [2 nd Edition - April 2015] shall
apply to the whole of the Works included in this Contract.
1.2.2
1.2.3
The Contractor shall supply and install one (1) computer at the Site Office each with the
following items including testing, commissioning and warranty for the exclusive use of the
Superintending Officer:
PentiumTM - 4 Core 2 Duo Processor Microcomputers
At least 2 GB RAM
A 160 GB or higher Formatted Hard Disk with an average seek time of 12ms or
below
1 unit of wireless modem and/or wireless router or USB modem or equivalent that
is able to connect back to main office
At least 3 PCI slots and those with more than 3 PCI slots should include 1 set of
shared slots
On board IDE Controller (Support 4 fast-IDE interface with DMA or PIO transfer)
1.46
33
1.47
35
1.48
Site Access and Co-ordination With LTA and Other Contractors/JTCs Lessees
35
36
2.1
General
36
2.2
Scope of Contract
36
2.3
Work Programme
42
SUPPLEMENTARY SPECIFICATIONS
SECTION 1 - CONTENTSPRELIMINARIES
1.1
General
1.1.1
This Supplementary Specification shall be read in conjunction with the JTC Corporation
Standard Specification for Civil & Structural Works [Edition November 2011] & JTC
Corporation Standard Preliminaries [2 nd Edition - April 2015]. In the event of any
discrepancies between the Supplementary Specifications and the Standard
Specifications & Preliminaries, the former shall prevail.
1.1.2
The successful Tenderer shall be bound by all the documents forming this Contract and
he shall be deemed to have acquainted himself with all such documents before tendering
as no claim for extra payments for lack of knowledge in this respect will be entertained.
1.1.3
In case of discrepancies between the documents, the Contractor shall immediately refer
the matter to the Superintending Officer. The Superintending Officers interpretation and
decision shall be final.
1.2
Standard Preliminaries
1.2.1
The provisions in JTC Corporation Standard Preliminaries [2 nd Edition - April 2015] shall
apply to the whole of the Works included in this Contract.
1.2.2
1.2.3
The Contractor shall supply and install one (1) computer at the Site Office each with the
following items including testing, commissioning and warranty for the exclusive use of the
Superintending Officer:
PentiumTM - 4 Core 2 Duo Processor Microcomputers
2.4
At least 2 GB RAM
A 160 GB or higher Formatted Hard Disk with an average seek time of 12ms or
below
1 unit of wireless modem and/or wireless router or USB modem or equivalent that
is able to connect back to main office
At least 3 PCI slots and those with more than 3 PCI slots should include 1 set of
shared slots
On board IDE Controller (Support 4 fast-IDE interface with DMA or PIO transfer)
42
43
3.1
Design Drawings
43
3.2
M&E Works
43
3.3
44
3.4
44
3.5
Traffic Lights
44
SUPPLEMENTARY SPECIFICATIONS
SECTION 1 - CONTENTSPRELIMINARIES
1.1
General
1.1.1
This Supplementary Specification shall be read in conjunction with the JTC Corporation
Standard Specification for Civil & Structural Works [Edition November 2011] & JTC
Corporation Standard Preliminaries [2 nd Edition - April 2015]. In the event of any
discrepancies between the Supplementary Specifications and the Standard
Specifications & Preliminaries, the former shall prevail.
1.1.2
The successful Tenderer shall be bound by all the documents forming this Contract and
he shall be deemed to have acquainted himself with all such documents before tendering
as no claim for extra payments for lack of knowledge in this respect will be entertained.
1.1.3
In case of discrepancies between the documents, the Contractor shall immediately refer
the matter to the Superintending Officer. The Superintending Officers interpretation and
decision shall be final.
1.2
Standard Preliminaries
1.2.1
The provisions in JTC Corporation Standard Preliminaries [2 nd Edition - April 2015] shall
apply to the whole of the Works included in this Contract.
1.2.2
1.2.3
The Contractor shall supply and install one (1) computer at the Site Office each with the
following items including testing, commissioning and warranty for the exclusive use of the
Superintending Officer:
PentiumTM - 4 Core 2 Duo Processor Microcomputers
At least 2 GB RAM
A 160 GB or higher Formatted Hard Disk with an average seek time of 12ms or
below
1 unit of wireless modem and/or wireless router or USB modem or equivalent that
is able to connect back to main office
At least 3 PCI slots and those with more than 3 PCI slots should include 1 set of
shared slots
On board IDE Controller (Support 4 fast-IDE interface with DMA or PIO transfer)
3.6
45
3.7
45
3.8
45
46
47
48