Beruflich Dokumente
Kultur Dokumente
Sn.
1
Activity
Power System
Engineering
Deliverables
Plant Layout
and LV
Cable Engineering
Equipment
Equipment
Concurrence from Mechanical and Civil
Departments
departments
Layout of Cable racks and Trays
Power Cable schedules
4
Illumination Engineering
Process departments
Location
Circuit no of LDB from which fed
Phase to which connected
Cable size
Load on each circuit
5
Earthing Design ,
Lightning Protection
schemes
buildings
Process departments
Schedule of Instruments
-stop sequences
Home | Back