Sie sind auf Seite 1von 6
APPENDIX C 37 Example of Pavement-Type Selection in Design-Build Operations & Maintenance Projects ‘Thisappendixillustrates an example ofthe contractor-based selection in design-build O&M projects using the process pro- posed in Chapter 7. Needs Statement Assume that an agency is procuring a design-build O&M contract for reconstructing a 15-mile segment of a six-lane urban interstate highway. The facility serves as the primary route ofthe growing urban traffic, and the agency would like to reduce traffic disruptions as much as possible. The agency has identified funding mechanisms for the project and. has decided to procure contractor services for design, construc tion, operations, and maintenance phases ofthe project for a period of 40 years. The agency is in the process of developing contract provisions addressing pavement-related needs for inclusion in the RFP. Agency's Internal Assessment ‘As noted, the agency has identified the contracting type and the overall scope of contractor involvement in this proj- cect. While the agency retains the financing responsibilities of the project, the agency plans to procure contractor services in

Das könnte Ihnen auch gefallen