[ Project: R&D Project: Six Sigma, Start Date:29/01/2016, End Date:04/11/2016]

Filtered Totals: Logged: 186 hours 45 minutes (186.75) Non-billable: 3 hours 15 minutes (3.25) Billable: 183 hours 30 minutes (183.50)
R&D Project: Six Sigma (AUT Uni)
Date

Who

Description

29/02/2016

Kimberly
Capati

01/03/2016

Task
list

Start

End

Week 1 Lecture

4:00PM

Kimberly
Capati

Today is our first meeting with our supervisor, we have discussed about what do we think/understand about the project
especially how unclear, vague and huge of a project it is to do. Secondly, we have exchanged contact details and Greig
decided that he will email the client and arrange a time for us to meet him so that we can ask questions about the project and
discuss it further on what he actually wants us to do. Next, we have also decided that we will hold our supervisor meeting every
Monday at 2pm. Other than that, we also made a Facebook group and sent each other our uni timetable.

06/03/2016

Kimberly
Capati

Billable

Billed

Time

Hours

6:00PM

2 hrs

2.00

2:00PM

2:45PM

45
mins

0.75

I have read the Research and Development Student guide and the sample proposals that was sent to us by our supervisor to
prepare for our meeting with our supervisor on March 07 (Monday)

7:30PM

8:50PM

1 hrs
20
mins

1.33

07/03/2016

Kimberly
Capati

Took a Myers-Brigg test today to find out what type of personality I have and shared it with my groupmates. Based from the test
results, I am a campaigner in the group. Next, we also received an email from Greig about client only wanting two member's for
this project but this was quickly resolved as he and Gisela went to meet with the client in the morning and discussed the project
with Sam, our client. The client meeting was also scheduled on Tuesday (08/03/2016) at 11am and a team meeting will occur
at 2pm today

8:20AM

9:15AM

55
mins

0.92

07/03/2016

Kimberly
Capati

We agreed upon an 11am meeting with the client on Tuesday (08/03/2016). We also talked about the project proposal which is
to be submitted in week 4. Greig said to ask lots of questions and prepare them before the client meeting. He also said that the
project proposal has to be consistent and clear. We just really had a brief discussion so the meeting today was short and
concise. We decided that Lucas will be the project manager.

2:00PM

2:30PM

30
mins

0.50

07/03/2016

Kimberly
Capati

Week 2 Lecture.

4:00PM

6:00PM

2 hrs

2.00

07/03/2016

Kimberly
Capati

I read the project description for Six Sigma to refresh my mind on what the project is really about and what the client wants us
to achieve and do for them. I have prepared questions for the client meeting tomorrow as well.

8:00PM

9:00PM

1 hrs

1.00

11:00AM

11:45AM

45
mins

0.75

We had our first client meeting at 11am at Clearvision Communications. Based from the meeting, the client wants us to
understand and manually do the data. Clearvision Communications aim to set up ultra fibre in all houses/businesses. They are
the ones that extend the cable from underground to the house then they connect it to the modem. They also build a network to
connect the buildings and houses.
Questions for the client is as follows:
1. How to build that online and offline information access?
2. What sort of data do they want us to include?
3. What are their expectations of us and the project?
4. What skills/software/tools do they want us to learn/use?
5. What kind of internal guidance are they going to give us?
6. How are they going to get the data?
7. How do they want us to present the data?
Notes:

08/03/2016

1 of 9

Kimberly
Capati

KPI's:
1. To be efficient to meet financials.
2. Adhere to the health and safety rules.
3. Quality assurance : follow Chorus Standards.
4. Lead Time: timeframe given to complete the job.
5. Customer Service Experience - surveys used.
6. Visibility - has the job been done?

** is it within the budget, is the customer happy? quality assurance is good and lead time has been achieved... lastly, visibility
(assurance and security to clients).
- We need to collect data to achieve KPIs.
- Measure how well we are doing
- Tackle KPI
- Statistics on how well we are trending/progressing (Data mining).
- Want to have good trending results.
- DMAIC - Define, Measure, Analyse, Improve and Control.
- Analyse what we want to do. (focus on measure, work on lead time and measure, collect data from management)
- existing tool to gather data (Simpro - Free, free trial for one month)
> Jobs come through individually at the momment
> Jobs are automatically created (trigger)
> Jobs closed (trigger)
> See how jobs are trending
* Some of the data is collected when Chorus sends it to Clearvision electronically by email and sometimes data is entered
manually.
* Tackle lead time and plot the data to see the trends but we need to gather the data first. More on statistical analysis.
08/03/2016

Kimberly
Capati

We had a group meeting and discussed our meeting with the client which happened at 11am. We did a brainstorming of what
the client wanted us to do and to know that everyone had a clear understanding of the client's needs or requirements. I also
think that our team is very on to it and we are starting to open up with each other.

12:00PM

1:30PM

1 hrs
30
mins

1.50

11/03/2016

Kimberly
Capati

Had a look through the proposal document that Lucas created on Google Drive and created an account on the "Teamwork"
website as this is the tool we will be using to collaborate with our groupmates.

11:10PM

11:55PM

45
mins

0.75

1:00PM

2:00PM

1 hrs

1.00

A Skype meeting was held with my team members and we have discussed who's going to do what so we can already start
working on our proposal and try get it checked by Greig.
Notes:
12/03/2016

Kimberly
Capati

* Proposal - describe the client's goals and the proposed approach to achieving an outcome or solution.
* Clients wants us to focus on lead time and see the trend of their data to see how their business is progressing (Statistical
Analysis)
* Me and Joni are assigned the tasks of doing the scope and objectives. Lucas will do the rationale and terms of reference for
the project proposal.

12/03/2016

Kimberly
Capati

Since Joni and I are partners for the tasks given to us we discussed our plan on how we are going about doing our parts for the
project proposal.

2:05PM

2:35PM

30
mins

0.50

13/03/2016

Kimberly
Capati

Today, me and Joni did the roles, skills and knowledge part for our project scope. This part is to be checked and reviewed by
Lucas tomorrow, Monday (14/03/2016). There are still other parts for our tasks that needs to be finished as we have set a
deadline for these parts on Monday. This includes the project objectives, constraints, and the project's cost estimation.

7:00PM

11:00PM

4 hrs

4.00

14/03/2016

Kimberly
Capati

As per usual, another group meeting was held and in this meeting we have discussed each team member's progress with the
proposal and what we still need to do and finish off.

12:45PM

1:10PM

25
mins

0.42

We held our weekly meeting with our supervisor today. Our supervisor had advised us of how we should structure our project
proposal. He also said that data integrity is vital to the success of our report. Therefore we have to ensure that we proofread
our work before submitting it. Consulting skills were also required for this project and our supervisor said that we should
practice this as it wasn't taught at AUT and this is a skill we must learn by ourselves. Greig also reminded us about our group
presentation and that we needed to book a time and date with the person who specifically handles this. Moreover, he
suggested that milestones would be a good way to deliver and track our progress in the project and to enable us to add more
details when we have sufficient knowledge and information from the client.
* Notes *

Kimberly
2 of 9

- Review of existing systems.


- Must Recognise that Davindra is also doing the data analysis of the MDU side
- There is a lack of confidence in the quality of data and its integrity (Clearvision)
- Term 1 : Better data management

45

3 of 9

14/03/2016

Kimberly
Capati

> Data needs to be reliable and verified


> Instill best practices into Clearvision
- Term 2: will actually start the data analysis process and also have to take in the fact that Davindra hasn't really looked at the
data as he is new and can't get much information from him
- Team presentation is next week - need to book a time with the person in charge for the booking. Either Monday, Tuesday or
Wednesday
- Proposal ---> write Davindra's progress
- Six Sigma --> applicable to big companies and therefore we need a game plan
- Clearvision has messy data thus we need to fix this
- We need to establish a strategy plan that will benefit the company
- Might be the wrong tool for the company???
- Chorus has subcontractors which is Clearvision and then Clearvision does the work for them
- Methodology focusing on DMAIC
- Quality assurance
- Send Sam a draft for the proposal

2:00PM

2:45PM

45
mins

0.75

14/03/2016

Kimberly
Capati

Week 3 Lecture.

4:00PM

6:00PM

2 hrs

2.00

14/03/2016

Kimberly
Capati

Me and my partner Joni, continued working on the remaining parts of our project scope. The deadline was supposed to be
today but we weren't able to finish it off as we are only halfway through the tasks and miscalculated the time we needed to do
the tasks given to us. We are hoping that we are able to finish the assigned tasks tomorrow in order for our project leader to
review and give us feedback on what we wrote. Updates were made on the skills, knowledge and roles part. The cost
estimation have been completed and so as our required resources. The only thing we have left to complete is the project
objectives.

7:20PM

11:45PM

4 hrs
25
mins

4.42

15/03/2016

Kimberly
Capati

Created an issue log table on Google Drive so that anyone who has concerns or if there any issues within or outside the group
we can log it and try to resolve it. Added some partial issues that I can think off (Draft).

2:25PM

3:00PM

35
mins

0.58

15/03/2016

Kimberly
Capati

I have decided to do the communication management plan for our project proposal. I have explained and thoroughly discussed
how we will communicate with each other, with our supervisor and our client. We are nearly done with the project scope and a
revision of the parts by the other team member's is required to see if there are any changes that we have to make. In addition, I
have made some minor changes to the proposal due to some spelling mistakes, grammatical and layout errors.

5:00PM

8:30PM

3 hrs
30
mins

3.50

16/03/2016

Kimberly
Capati

I worked with Joni to add some stuff on the project scope and also create the cost estimates table.

11:30AM

1:45PM

2 hrs
15
mins

2.25

16/03/2016

Kimberly
Capati

I began to do the Risk Management and Risk Register. I have also checked our proposal documents to see if any changes
were made and things added from yesterday. I have noticed a few errors specifically with the cost estimation table and had a
talk with my groupmates about this. We have also discussed which collaboration tool are we going to use for this project and
we have chosen to use Trello for our Kanban method as it has a virtual whiteboard and post-it notes which can make
collaboration online easy. Additionally, the Teamwork platform was chosen for the second phase when we are about to use the
DMAIC method due to the fact that it is a lot more structured. Lastly, our group discussed about our group presentation and the
times we are all free and when to book it with the moderator. Lucas also sent Greig an email regarding this as he needs to be
available for the group presentation as well.

9:30PM

11:30PM

2 hrs

2.00

18/03/2016

Kimberly
Capati

As i work in the information technology department, I have asked our CIO for his insight and advice about our project proposal.
He has checked the parts we have done so far for our proposal and said that Kanban is not suitable for our project. He has
explained to me why and that we should use Scrum instead. He said that Scrum is really good for team collaboration, facilitates
planning and communication which is why it is a better methodology compared to using Kanban.. as Kanban is too flexible for
this project and we need to use a method that is appropriate specially for time management as we are doing a student project.

4:40PM

5:55PM

1 hrs
15
mins

1.25

18/03/2016

Kimberly
Capati

Still doing our Risk Register for the project proposal.

8:00PM

10:00PM

2 hrs

2.00

18/03/2016

Kimberly
Capati

Did some work on the project scope as me and Joni found it a bit broad and unclear so revised it to make it straightforward and
easy to read.

10:30PM

11:45PM

1 hrs
15
mins

1.25

18/03/2016

Kimberly
Capati

Discussion with Joni about the scope of the project as it seems quite broad and vague, need to make changes to it.

10:45PM

11:15PM

30
mins

0.50

19/03/2016

Kimberly
Capati

Did our revision history table

12:00AM

12:20AM

20
mins

0.33

19/03/2016

Kimberly
Capati

Group Skype call. Discussed what we needed to do for the scope and project plan.

12:25AM

1:50AM

1 hrs
25
mins

1.42

19/03/2016

Kimberly
Capati

Did project plan/wbs into ms project with Joni and Lucas.

1:15AM

2:00AM

45
mins

0.75

19/03/2016

Kimberly
Capati

Finished off the Risk Register table.

7:45PM

9:20PM

1 hrs
35
mins

1.58

20/03/2016

Kimberly
Capati

Updated and checked the project proposal. Did some minor changes and then added some things to the Quality Assurance
part of our proposal.

12:30PM

1:35PM

1 hrs
5
mins

1.08

20/03/2016

Kimberly
Capati

Created a glossary table and added the reference parts to our proposal.

4:30PM

6:05PM

1 hrs
35
mins

1.58

20/03/2016

Kimberly
Capati

Thoroughly checked the document with everyone one last time that its all correct and no information is missing before I get it
printed out.

6:25PM

7:00PM

35
mins

0.58

20/03/2016

Kimberly
Capati

Printed 5 copies for our markers (total of 185 pages) for our group presentation tomorrow (21/03/2016)

7:20PM

8:00PM

40
mins

0.67

20/03/2016

Kimberly
Capati

Parts of the group presentation were assigned and discussed who is going to do what. I was assigned to discuss our chosen
methodology for our project. I have also added slides to our powerpoint file which will be shown tomorrow (21/03/2016) in front
of our markers and supervisor. I wrote the stuff that I have to say for the presentation and tried to practice my part.

9:50PM

11:55PM

2 hrs
5
mins

2.08

21/03/2016

Kimberly
Capati

Got the printed booklets binded at AUT Printsprint and also practiced my parts for the presentation at 11.15am today.

8:00AM

10:55AM

2 hrs
55
mins

2.92

11:15AM

12:00PM

45
mins

0.75

Group presentation with Joni and Lucas along with the two markers - Stephen and Giselda and Greig our supervisor.
21/03/2016

Kimberly
Capati

Overall, I think that our group presentation went well even if i went over my time.. We managed to say everything that we
needed to say and also answer the marker's questions. They very much liked our printed proposal booklet and suggested that
we provide them results of our deliverables and that we should make the project plan bigger. They also said that our project
quality assurance needs to be further refined and so as our chosen methodology of Kanban. Finally, a feedback email will be
sent to us so that we can make changes to our proposal documents and then we have to submit it to Greig and the bcis email.

04/04/2016

Kimberly
Capati

Team meeting with Greig. Discussed how the proposal went, what to say to the client, what we need to work on.

2:00PM

2:30PM

30
mins

0.50

04/04/2016

Kimberly
Capati

Week 6 Lecture.

4:00PM

6:00PM

2 hrs

2.00

07/04/2016

Kimberly
Capati

Team meeting to discuss what changes we have to do for our proposal and helped further refine the document today.

10:35PM

11:25PM

50
mins

0.83

08/04/2016

Kimberly
Capati

Made some minor changes and reviewed the document that we are suppose to submit according to the feedback that the
markers sent us and we have submitted it before 5pm today.

12:35PM

1:45PM

1 hrs
10
mins

1.17

Meeting with the client and our supervisor. Discussed how we plan to go about doing the project and have agreed to come in at
9am to know more about what the business does and what they are trying to achieve as a whole.
Notes:
- Review business processes
>come to the client site every monday / on an ongoing basis
4 of 9

11/04/2016

Kimberly
Capati

>understand the business more


>work with the operations team
- Understand how well the business is performing (KPIs)
- Introduce measures + graphical display
- Analysis then collection of data
- Instill best practices in the operations system. (change management)
- Engage relationships, communication.
*Deliverables
*Ar eas of single dwellings will be working on.

1:50PM

2:20PM

30
mins

0.50

9:00AM

2:15PM

5 hrs
15
mins

5.25

Went to Clearvision today and talked to the managers of MDU and SDU jobs. Decided to change from writing a change
management plan to a communication policy.

18/04/2016

Kimberly
Capati

We were given a brief introduction about Clearvision's business and how they use Simpro with regards to the jobs they get. We
have also realised that Ajit, the SDU manager was using spreadsheets instead of Simpro as it was very time consuming for
him. Based from what we all understood, he is the one that takes care of the SDU department and he can't put every job into
Simpro and now he has hired a new person who will enter all the job information into Simpro and that they will try to catch up
on logging the jobs. He is still in the transition phase.
We have also discussed that there is a lot of miscommunication with each departments so this prompted us to create a
communications plan for them.

26/04/2016

Kimberly
Capati

Did some research on how to write up our communication policy and added some stuff to our communications policy which
needs to be checked by my other team members if its right or not.

6:00PM

10:00PM

4 hrs

4.00

27/04/2016

Kimberly
Capati

Worked on the communications plan again, did some research on what kind of stuff a communication plan has and had a
discussion with my groupmates about it.

7:00PM

10:35PM

3 hrs
35
mins

3.58

28/04/2016

Kimberly
Capati

Checked the communications policy to see what my other groupmates added. Also, I have checked for grammatical and
spelling errors.

1:30AM

2:10AM

40
mins

0.67

1:00AM

2:30AM

1 hrs
30
mins

1.50

Team was discussing about Lucas' client visit on April 28th and from there we have discussed that we need to change the
whole communications plan so that it will be more of a policy and like in a numbered format which will be generalized so that
each department are able to follow a set of rules.

5 of 9

01/05/2016

Kimberly
Capati

02/05/2016

Kimberly
Capati

Third visit to Clearvision. Learnt the basics of how to use simPRO, what kind of data types we're working with, introduced
ourselves and asked questions to the accounts manager and assistant civil manager.

8:30AM

3:00PM

6 hrs
30
mins

6.50

02/05/2016

Kimberly
Capati

Complete meeting with supervisor and Sam. Established what work we would be doing in the future, what needed to be done
now.

12:00PM

12:30PM

30
mins

0.50

02/05/2016

Kimberly
Capati

Week 8 Lecture.

4:00PM

6:00PM

2 hrs

2.00

03/05/2016

Kimberly
Capati

I was assigned to do the weekly progress report to be submitted on Wednesday (04/05/2016) by Lucas for Sam to review.

9:00PM

10:30PM

1 hrs
30
mins

1.50

03/05/2016

Kimberly
Capati

Had a meeting with our team mates as we needed to change our communication policy - making it more as a policy rather than
a plan for Clearvision. We discussed about what we needed to include, remove and change in order to create a more
professional policy.

9:15PM

11:40PM

2 hrs
25
mins

2.42

06/05/2016

Kimberly
Capati

Added some stuff to the SWOT Analysis that Joni made. Did some research online as well and after I finished adding some
stuff. Asked them both to check it.

12:10AM

1:20AM

1 hrs
10
mins

1.17

*Notes:
- Communication policy should be clear and concise
- Easy to read
- Suitable for all departments
- Clear

Kimberly
Capati

Finalised everything on our communications plan and checked for any spelling, grammatical and content/layout errors. Team
had discussed that it was ready to be sent to Sam to check and so that we are able to get feedback from him and his team.

12:05AM

1:30AM

1 hrs
25
mins

1.42

09/05/2016

Kimberly
Capati

Fourth visit to Clearvision. The teams' official training for the simPRO software was conducted by the SDU manager. Gained a
broader knowledge about the tool and the team got a chance to ask questions and get more ideas to further assist us in
identifying the best tool that could help improve the company particularly in the lead time area. We also figured that the SDU
manager is using both the simPRO tool and the old excel spreadsheet that they were using before as he's still in the transition
phase. He mentioned that he will eventually move to the new software being used once he becomes fully proficient with it.
During the training, we have decided that we will be using MS excel and some sort of visual basics coding for analysing the
SDU's lead time data instead of using Weka. This is because we think that it's best to develop something that could be
beneficial to the company for the long run. We also got to have a short meeting with Sam today. We discussed about the
communications policy draft that we sent him last week and updated him about the training that we did with the SDU manager.
With regards to the communications plan that we sent him, we were told to send it to the other managers as well to get valuable
feed backs and improve the quality of the policy's content.

9:00AM

12:00PM

3 hrs

3.00

11/05/2016

Kimberly
Capati

Worked on the issue log. Noted down and brainstormed the issues I can think of which we've had for this project on the table.
(DRAFT)

12:15AM

1:35AM

1 hrs
20
mins

1.33

13/05/2016

Kimberly
Capati

Polished my issues on the issue log, rechecked and reviewed it then, asked my team members to have a look at it and review
it so that we can make any changes necessary to the issue log.

1:00AM

2:50AM

1 hrs
50
mins

1.83

13/05/2016

Kimberly
Capati

Worked on the issue log and have completed it. Asked my team members to have a look and review it so that we can make
any changes if necessary.

9:30PM

11:35PM

2 hrs
5
mins

2.08

9:45AM

1:00PM

3 hrs
15
mins

3.25

07/05/2016

Fifth visit to Clearvision. Looked at data stored on simPRO and came to the conclusion that it was unusable. The manager of
the SDU department only started using it recently and as a result there is no history of data with proper integrity, consistency
etc. Furthermore, the manager does not like entering data on simPRO because he is doubling up on work which is
counterproductive. We will be collecting data from Visionstream's ETA Direct software because that is kept up-to-date and will
give us something to work with. We either use this data or we having nothing at all to work with.
Our client wants this manager to use simPRO, but it isn't our responsibility to tell his employees how to work, nor do we have
any sort of authority to do so. As much as we would like to use simPRO, we do not have this option.
16/05/2016

Kimberly
Capati

Need to get feedback on our comms policy from the health and safety manager. We organised to have a meeting with him
today last Monday but he forgot and didn't have time for us today. We'll need to get him to send us his thoughts over email
instead.
Need to email Greig to know his opinion on our approach. Our plan is to do two months worth of data analysis taken from ETA
Direct and present the data in a way which lets Clearvision see where jobs are left pending and it's within their control to fix.
The issue with this method is it is difficult to automate this process completely.
We also need to email our client informing him of the issue using simPRO for data analysis.

6 of 9

17/05/2016

Kimberly
Capati

I decided to write my "Individual learning" on the status report today and also check the folders that Joni have created and the
documents that were needed for the mid-project review.

5:50PM

7:00PM

1 hrs
10
mins

1.17

20/05/2016

Kimberly
Capati

I sorted and checked our files and folders on the GDrive. I deleted the unecessary files and folders that we dont need. I
organised some stuff as well.

12:45AM

1:15AM

30
mins

0.50

20/05/2016

Kimberly
Capati

Worked on the status report and did some research as well on how we, as a team should answer our report to be handed in to
our supervisor

3:25PM

5:35PM

2 hrs
10
mins

2.17

21/05/2016

Kimberly
Capati

Compiled some information regarding our meeting artefacts/resources to show our communication/brainstorming.

10:35AM

12:10PM

1 hrs
35
mins

1.58

22/05/2016

Kimberly
Capati

I sorted out and checked out files and folders on our GDrive. I deleted unecessary files and folders that we don't need and tried
to organise things more.

12:45AM

1:15AM

30
mins

0.50

22/05/2016

Kimberly
Capati

Edited some file names, fixed up some documents and versions.

1:00AM

1:30AM

30
mins

0.50

23/05/2016

Kimberly
Capati

Sixth visit to Clearvision. Gathered feedback from Ajit, Jawed and Sultan on our communication policy. Need to send Neel an
email asking for his feedback, as well as Asim. Have not heard from Matt and it has been two weeks since we asked for his
feedback. Unfortunately he was in a meeting today and we could not see him in person.

9:00AM

12:00PM

3 hrs

3.00

*Send Greig copies of our work (cc him in)


*Status report - send a copy of the draft to Greig
*Weekly report - put in all the issues that you have found as a team
*Update proposal due to scope

1:30PM

2:30PM

1 hrs

1.00

Updated our status report, added some new content and fixed the layout.

12:00PM

2:00PM

2 hrs

2.00

11:00AM

12:00PM

1 hrs

1.00

Me and Joni couldn't make it to Clearvision today because its our last week of university and we are trying to catch up on a lot
of assignments so Lucas went to Clearvision just to try and get feedback for our communication policy. Lucas said that we got
feedback from Neel and Sultan about our comms policy.

1:00PM

2:00PM

1 hrs

1.00

Meeting with our supervisor. Just regarding our concerns about the project and also a discussion of our status report for our
upcoming mid project review. Also, gathered advice as how to we should handle our concerns about our client.
23/05/2016

Kimberly
Capati

24/05/2016

Kimberly
Capati

We had our Mid project review meeting with Gisela, Greig and another moderator as Stephen couldn't make it that time.

25/05/2016

Kimberly
Capati

Basically we just handed our status reports to them, a presentation all about the KPI: Lead Time for our Clearvision Project was
presented to them. We were also interviewed one by one by the moderators about the project and how we feel about it, what
our project is about and etc. We also showed them what deliverables we have done, where are we on our project plan and our
plans for later on.
As we were the first one for the mid project review, we weren't sure how it works and so Gisela has also advised us about the
folders on our Google Drive and that we should put it in HTML format, moreover we also needed to have physical deliverables
and the project proposal needs to be updated if we make changes to our project according to what we have discussed during
our mid project review.
Online meeting with Joni and Lucas:

7 of 9

30/05/2016

Kimberly
Capati

01/06/2016

Kimberly
Capati

Have updated the communications policy and incorporated the clearvision employees feedback towards this.

7:00PM

8:05PM

1 hrs
5
mins

1.08

08/06/2016

Kimberly
Capati

We are still learning about Microsoft Visual Basic at this stage and as we believe that it would help us with our data analysis.
We are also in the middle of our exams right now.

10:45AM

6:40PM

7 hrs
55
mins

7.92

11/06/2016

Kimberly
Capati

Just researching and upskilling about how are we going to use MS Visual basic for this project.

1:00PM

8:00PM

7 hrs

7.00

29/06/2016

Kimberly
Capati

We have our semester break now. We are still conducting some experiments and research in order to successfully produce an
automated reporting tool for the lead time data. The team will keep the client updated once this has been finalised and tested.

6:30PM

11:55PM

5 hrs
25
mins

5.42

05/07/2016

Kimberly
Capati

I have spent the whole day trying to practice Microsoft Visual Basic. I also watched youtube video tutorials to self teach myself
about this.

9:40AM

7:30PM

9 hrs
50
mins

9.83

13/07/2016

Kimberly
Capati

We are still on semester break and I started coding some bits of our test script based from what i have learnt through the
youtube tutorials. The data i used was from ETAdirect since I can't use the data from Simpro as it is very inconsistent and not
reliable.

3:40PM

10:25PM

6 hrs
45
mins

6.75

Semester 2, Week 1:
20/07/2016

Kimberly
Capati

23/07/2016

Kimberly
Capati

We are still on the process of our data analysis and a working test script was finished based on the data we have obtained from
ETA direct. A team meeting was also held just to discuss about our plans for this phase, any upcoming tasks that we have and
just a review of what we have done.
Just coding today to further modify the script that we have on hand and so that it can produce the required data that a
clearvision employee would need. Also, our team has decided that we should include more graphs in our test script. Moreover,
a meeting with our supervisor is needed just so we can discuss with him our status with this project and consult him as well.

9:10AM

3:30PM

6 hrs
20
mins

6.33

5:55PM

10:35PM

4 hrs
40
mins

4.67

11:00AM

12:00PM

1 hrs

1.00

Semester 2, Week 2:
28/07/2016

Kimberly
Capati

Had a meeting with our supervisor today with regards to the progress of our project and also so that we can address our
concerns about Sam and his employees. In addition, how we got the data from ETAdirect instead of Simpro due to the
inconsistencies of the data entered on Simpro. e.g. doesn't have a start date and end date that the job was completed, the
comments are pretty much useless and etc. We are also planning to visit Sam with Greig next week and to address our issues
as a team and just an overall discussion about our project.

30/07/2016

Kimberly
Capati

Spent the whole day just trying to fix up our documents and ensure that our test script is working fine and cleaned the code up
as well. Modified the test script to include more graphs.

3:55PM

11:50PM

7 hrs
55
mins

7.92

31/07/2016

Kimberly
Capati

Double checked everything and also played a little bit with excel today to ensure that we prepared a really good script for the
client.

7:45PM

8:55PM

1 hrs
10
mins

1.17

9:30AM

10:45AM

1 hrs
15
mins

1.25

3:30PM

4:30PM

1 hrs

1.00

Semester 2, Week 3:

01/08/2016

Kimberly
Capati

We had a meeting today with both our client and supervisor at Clearvision just to update the client about our project status and
our concerns for this project. We also discussed about our time of coming to Clearvision for this semester but unfortunately
due to clashes in timetable and the location of Clearvision, it was quite difficult for the team to decide a time of when we are all
available to come in to Clearvision. The client also initially wanted that each member of the team to come on different days
which wasn't ideal for us. The client thinks that this isn't very good and we are not going to learn a lot from the business and
how they operate. I supposed that he thinks we are interns as he wants us all to come everyday (he was comparing us to the
business students as the business students do a "Co-Op" paper and that means that they have to be at the clients for 9
weeks).We think that, it is also better for us to come together so that we don't miss out of any information and that we can
work together on our project. After the meeting, we realised that our team and Greig needs to have another meeting next week
to discuss whether we should still continue the project or just cancel it due to the issues that we are having right now.
Meeting today consists:
- Addressing Issues
- Aims of the client: Understanding the business.
- Reports that have been produced.
- QA and setup lead time reports.
- Meeting with Greig at 4pm on Wednesday.
Today, we had a meeting with Greig just to discuss about our meeting with the client on 1/08/2016 and he also said that he
had discussed our matters about the project to Gisela and Stephen. We have all decided that we are going to cancel our
project and our meeting was all about how we are going to present a presentation about Clearvision.

03/08/2016

Kimberly
Capati

Our presentation should contain the following:


-what we have done so far,
-our scope for this project,
-what we have achieved so far,
-issues with the client,
-progress with the project,
-etc.
Lastly, the meeting was set on Friday at 11:00 am with the other academic supervisors.

8 of 9

We had our meeting today with the academic supervisors, Stephen and Gisela, along with our supervisor, Greig.

05/08/2016

Kimberly
Capati

09/08/2016

Kimberly
Capati

11/08/2016

Kimberly
Capati

12/08/2016

Kimberly
Capati

- We have decided to cancel the project with Clearvision, thinking about another project that we can do which is the website
making or the KPMG project.
- Greig and Stephen has a meeting with Alistair Morgan (new client from KPMG) on Monday at 10.00am.
- Package up the script professionally send a preview of it to Greig and we've got until the end of week 4
- Alternative options --> website (client in AUT)
- Scope - mini proposal, planning and outcomes
- Physical outcomes e.g. requirements analysis design or database documents
- Artifacts should be bundled up e.g. portfolio
- Reflective report (2 parts)
- Html website (the portfolio)
- 2 portfolios - 2 projects
- End of year assessments will be checked
- Put the macros used in the portfolio
- Documentation with the script

11:00AM

12:00PM

1 hrs

1.00

11:05AM

4:25PM

5 hrs
20
mins

5.33

Added some more content to our instructions, edited some sections and proofread my parts that I did. Just waiting for Joni and
Lucas to proofread it as well before we hand it over to Sam.

3:15PM

8:45PM

5 hrs
30
mins

5.50

Just had a small meeting with the team to discuss about the instructions and the test script that we are about to hand over to
Sam.
Kimberley said that the meeting with Alistair will be on Monday (15/08/2016).

10:00AM

10:30AM

30
mins

0.50

Semester 2, Week 4:
Today, I have been working on writing up our instructions for the test script as we need to package up our project for
Clearvision Communications.

Generated for Kimberly Capati at 2:14AM 04/11/2016


Manage your projects quickly and easily! Signup for Teamwork Projects

9 of 9

Total

186 hours 45 minutes

186.75

Non Billable Time

3 hours 15 minutes

3.25

Billable Time

183 hours 30 minutes

183.50