Estimate for eviction and take possession of unauthorized occupied forest land in

Talaguppa Reserved Forest Block (Kerehally sy no. 85 & Talaguppa sy no. 20) as per
Honble Karnataka High Court at Bangalore, W.P No. 23458/2011 (GM-FOR) PIL.
Range: Anavatti
Sub division: Soraba
Location: Talguppa and Kerehally

S.No

SSR

PARTICULAR

101(a) Survey and Demarcation of

Ext: 64.00 Ha.


Budget Head:11cop

QUA
NTIT
Y

Forest Boundaries to demarcate


encroachment lands for further
eviction
Survey and demarcation of Forest /
block / compartment boundary
including clearing of jungle growth
to a width of 2 meters by engaging
a
gang of following persons
(i) In areas with thin undergrowth 2
Mtr. wide clearance Mazdoor requirement for 1 Km =
12 / 0.8 = 15
2,331.79 Km
(b)Engaging qualified Surveyor by
paying Rs.171.32 per day @ one
manday
for 0.80 Km of work
214.15 km

RATE

PER

AMOUNT

2331.7
9

Km

18654.00

214.15

Km

11992.00

214.15

Km

11992.00

8 km

(c)

Engaging qualified Draughtsman


by paying Rs.171.32 per day @
one
manday for 0.80 Km of work
214.15 km
Work done per day = 40 chains i.e.
20 M x 40 = 0.8 Km.
Fixing the reference point / bench
mark on the ground with reference
to the
map and surveying the tie lines for
measuring the accuracy of the
survey

Honble HC Order dt: 13.01.2012.


1. Conducting meeting of unauthorized
occupants on 06.03.12 at Soraba to elicit
their willingness to move out or
otherwise as per Honble HC Order dt:
13.01.2012.
No. of persons 102 @ 50.00= 5100.00
2.Preparation of 64-A show cause notices
dt:14.05.12 to encroachers
94 sets x 8 pages =
5060.00
2

LS

LS

LS

LS

LS

LS

LS

10
11

LS
LS

3.Preparation of 64-A summary eviction


notices dt:28.06.12 to encroachers
94 sets x 30 pages+ RPAD =
8000.00
4.Preparation of mosaic maps, Xeroxing
top sheets, village Maps(2 villages), Final
notification, Sec. 4 notification, FSO
order copy, Mysore gazette, SF maps,
RTCs & Mutation copies etc
42 sets =
50000.00
(as per High Court directions)
Preparation and erecting Talaguppa RF
6 nos.
name boards in line with Honble court
directions at strategic places.
Professional charges, DTP works, colour
Xerox at 42 sets as required by the
Honble Court.
Engaging Hitachi Earth movers during
heavy downpour to uproot stumps
/remove standing crops/buildings. 5 nos.
x 2 days
Engaging Tractor with rotvator ,3000 x 5
nos. x 2 days
Engaging JCB 4000 x 4 nos. x 2 days
Hiring 2 buses to commute KFD Staff
from different Ranges of Sagar Division
as deputed by DCF ,Sagar to the eviction
spot @ 4.00 am everyday.
(to and fro)
Engaging 4 videographers + 2
photographers to record the eviction work
& getting CD/DVD and photoes.
Tractor with trolley to carry implements,
ropes, billhooks,red flags with sticks,

68160.00
10000.00
35000.00
120000.00

30000.00
36000.00

32000.00

32000.00
6000.00

12

13
14

15
16

LS

Bills
LS

LS
LS

mumties, powersaws etc 3000 x 2 days


Purchase of billhooks 80 nos. @ Rs. 60,
Ropes of mescom quality for creating
barricade to prevent possible rushing of
mob during eviction as advised by police
Rs. 15000
Purchase of working halmets 80 No@
250.00 Rs each
Purchase of stationery items
Catering for two days
Purchase of food items, groceries,
mineral water, thermo cups and plates,
preparation and serving charges for
Civil and Reserve Police
180
KFD staff
80
Fire brigade crew
22
Ambulance team led by doctor
08
Revenue officer
10
Daily labourers
40
340 x Rs. 15 x 2 times tea-coffee 2 days
340 x Rs. 20 x 2 times breakfast 2 days
340 x Rs. 80 x 1 time lunch 2 days
Heiring of power saws with men &
materials (25 sets @Rs. 2000 each)
Misc & Unforeseen exp.

39800

12000.00

20400.00
27200.00
40800.00

50000.00
25000.
00

Grand total

626998.00

Range forest officer


Anvatti Range, Anvatti
Countersigned
Assistant Conservator of Forests,
Soraba sub division, Soraba

Estimate for Restoration of evicted forest land to its original position in Talaguppa
Reserved Forest Block (Kerehally sy no. 85 & Talaguppa sy no. 20) as per Honble
Karnataka High Court at Bangalore, W.P No. 23458/2011 (GM-FOR) PIL.
Range: Anavatti
Sub division: Soraba
Location: Talguppa and Kerehally
S.n
o

Ext: 64.00 Ha.


Location:kerehally,Talguppa

SSR

PARTICULARS

QTY

RATE

PER

AMOUNT

29 (b)

33000
pits

146.82

1000

4845.00

29 c

Aligning in the planting area


along the contours & marking for
pit
Excavation of pits with vertically
cut edges to make an uniform
cube and
heaping the excavated soil
(1/3rd top soil on the upper side
& 2/3rd

7128

66.07

cum

470946.96

29 d

8.25

cum

44104.00

29e

33000

458.82

1000

15141.00

29g

33000

367.06

1000

12112..98

29h

64ha

1376.48

ha

88094.72

29i

33000

1137.90

1000

37550.70

29j

33000

4037.73

1000

133245.09

Refilling of pits, cutting of edge


of the pit on the lower side and
refilling 75%
or 100% of the pit as the case
may be with the excavated soil,
duly
breaking the clods & arranging
the remaining soil on the lower
slope.
i) First weeding around the
plants (pits) to a radius of 60 cm.
(i) 2nd & subsequent weeding
around the plants to radius of 60
cm.
Clear weeding by cutting all
weeds flush to the ground,
retaining
seedlings of important species,
not directly interfering with the
main
crop in areas with heavy weed
growth of Eupatorium, Solanum,
etc
Scraping of grass and other
weed growth around the plant
(Pits)
(Scraping item is allowed only in
grass-infested areas) 60 cm.
radius around the plant
Saucer Bharav: Scraping out of
grass and weeds to a radius of
50 cms

10

29k

11

14

12

14a

13

14 b

14

14 c

15

14d

16

14e

17

14 f

18

14g
14 h

19
20

22a

around the plant, earthening up


of soil in the form of a semicircular
slanting saucer shape slope,
loosening of boulders if any with
soil by using
pickaxe and arranging the
loosened boulders and soil in
semi-circular
fashion at the lower side of the
plant (Dimension 80 cms
diameter and 25
cms depth at deepest point
Hoeing & soil working with
pickaxe around the plant to a
depth of 15 cm &
to a radius of 30 cm. so as to
loosen the soil around the plants
(
Raising of Seedlings in
Polythene Bags of 8" X 12"
Size
Purchase of 4.20 cum. of
ingredients i.e. farmyard manure,
sand and red
earth in 1:1:2 proportion
Mixing the ingredients, filling the
polythene bags and arranging in
rows
after scraping the earth
Dibbling of seeds in polythene
bags
Pricking out the seedlings from
seed beds & transplanting in the
polythene
Transplanting of 4 x 6 or 5 x 8
size bagged seedlings into 8 x
12 size
bags after removal of the
seedlings along with the trimmed
ball of earth
Watering to the polythenebagged seedlings twice a
day( from noember 2012 to june
2013 for 240 days )
Weeding the polythene-bagged
seedlings x3 time
Shifting & grading the polythenebagged seedlingsx3 time
Raising of Plantations (21 to
38)
Clearing the unwanted growth
such lantana, eupatorium and
such other
thorny species over the entire
area, heaping and burning the

33000

1376.48

1000

45423.84

33000

1,627..9
3

1000

53720.00

33000

972.72

1000

32099.76

33000

38.62

1000

1274..00

33000

96.48

1000

3183.00

33000

96.48

1000

3183.00

33000

15.59

1000

123472.00

33000

42.22

1000

4179.78

33000

115.82

1000

11466.18

64

1,468.26

ha

93964.00

debris in
areas where there is thick growth
Loading & unloading of
Polythene Bagged Seedlings:
Loading of
polythene-bagged seedlings into
the vehicle at the nursery site
and
unloading at the site nearest to
the planting site
Seedlings raised in 8" x 12" size
bags
Transportation: Transportation
of polythene-bagged seedlings in
hired truck from the nursery site
to planting site
Conveyance: Conveyance of
polythene-bagged seedlings on
head
load from the dumping site to
planting location near each
trench / pit
(distance up to 3 Km.)
8" x 12" size bagged seedlings
Watering by dipping: Watering
polythene bagged seedlings at
planting site by dipping in water,
including carrying of water
8" x 12" size bagged seedlings

33000

734.14

1000

24226.00

33000

1,565.18

1000

51650.00

33000

1,468.26

1000

48452.00

33000

312.00

1000

10296.00

27

Planting: Planting of P.B.


Seedlings after tearing with
blade &
removing the polythene bags in
trenches / pits including
scooping
the soil to required depth,
pressing the soil gently around
the
seedlings after planting.

33000

1350.96

1000

44581.00

26

Ls

64ha

2500

Ha

160000.00

27

40a,23,2
4,

Engaging watch and ward from


1/7/2013 to31/3/2014
First year Maintenance of
plantation
Second year maintenance of
plantation
Third year maintenance of
plantation
Miscellaneous and
unforesenable expenseses

64ha

6720

Ha

430080.00

64 ha

4245

Ha

271680.00

64ha

4245

Ha

271680.00

21

23 d

22

24 c ii

23

25 d

24

26 c

25

28
29
30

Ls

50000.00
Total

2540645.0