Sie sind auf Seite 1von 1
Lifting Plan (Over $00 th) LOCATION: DATE OF LIFT: LOAD DESCRIPTION LIFE DESCRIPTION a A. WEIGHT F. SIZING OF SLINGS PTOUIPENT CONDON NEWD) Use 1 SuNGSELECTION 2 Meurer i Styreor ttanceyent 3 tottror eApewe mat tas & Nunes oF Sunes 8 HOOKUP 4 Wetitror tock tas © Sines = 3 Whattror ute nar ts SUNG Liar & Wicttror Stine Scns tis P RAID CAM OFSURG $ Wet ors ‘ewer Qsrone> 2. SHACRLE seLECTION 4. weld OF eaDacie BALL MAAN DIETER ANCHE) 9, WhctrrorcanLe 1949 eat iss €SUAGKLE ATTACHED TOLOAD BY SireRinu ov eQuimeNT as b, NUMBER OF SHACKLES vu One —is rorac weiont Us F, CRANE source. oF Lax WHE NINYE OF CRANE —s ‘A: MAXIMUM DISTANCE. CENTER OF LOAD TO CENTER (RNGLEOF Boom AT ICRF EES ERATED CAPACITY OF CRANEUNDERSEVEREST a8 LIFTING CONDITIONS ROM CHART, HeecreD__ stone Y"ovtreaea ns L waarosecaco 3 Oven sine tps blaine 4 how CHART= RATED ENPRCTIVOF Sauron — GteroeTMsFT 1. Rane Cusciryor samo cnany es 5. MAXIMUMLOADON CRANE ©. CRANE PLACEMENT ourris OF CRANES ‘Sno Basco aso Drm ow Swine) ame SPECIAL INSTRUCTIONS OR RESTRICITONS FOR CRANE, UG PRE-LIFT CHECKLIST 2 OUTRIGGERS FLLL EXTENDED HAD Room cuteeKeD TAGLINE USED EXPERIENCED OFERATOR EXPERILNCED FLAGMIAN EXPERIENCED RicceR LOADCHART INCRANE CRANE INSPECTED FUNCTIONAL TEST OF CRANFDY g q q q q g q g 5 Q 5 60 aoooooooo IFQUIRE A SEPARATE LIFT PLAN FOR EACH CRANE. ANY CHANGES IN THE CONHGURIAOTY OF THECRANE, PLACMENT, RIGGING, IFTING SCHEME ETU>O8 CHANGES IN ANY CALLCAITONS REQUIRE THAT & NEW LIFT PLAN BE DEVELOPED Sian Pan Checked Rina Soper

Das könnte Ihnen auch gefallen