DATE:
PROJECT:
CONTRACTOR:
Revision Number
CRANE 1 CONFIGURATION
CRANE 2 CONFIGURATION
Crane type:
Crane type:
Boom Length:
Boom Length:
Boom Type:
Boom Type:
Tip Type:
Tip Type:
Counterweights:
Counterweights:
Block Size:
Block Size:
Line Parts:
Line Parts:
Jib Type:
Jib Type:
Jib Length:
Jib Offset:
Jib Length:
Jib Offset:
Main Block
Main Block
Wire Rope
Wire Rope
Jib (Deduct)
Jib (Deduct)
Spreader
Spreader
Slings
Slings
Shackles
Shackles
other
Total Crane 2 Fixed Weight:
other
Total Crane 2 Fixed Weight:
Remarks
PIECE WEIGHT
Piece weight
Attachments (lugs, ect)
Water Allowance
Total Weight of Piece:
Percent Weight to Crane 1:
Attachment - 2
Page 2 of 2
DATE:
PROJECT:
CONTRACTOR:
CRANE 1 Total
LIFT Lift
WEIGHT
WeightSUMMARY
CRANE 1 Total
LIFT Lift
WEIGHT
WeightSUMMARY
Chart radius
Chart radius
Chart Capacity
Chart Capacity
Chart adius
Chart adius
Chart Capacity
Chart Capacity
CLEARANCE
Minimu Clearance from boom to Obstruction
Minimu Clearance from boom to Lifted Piece or Spreader
COMMENTS
PREPARED BY:
REVIEWED BY
Name::
Name::
Desigantion::
Desigantion::
signature::
signature::
Date::
Date::