VOLTAGE OPERATED
http://testingcommissioning.blogspot.in/2012/09/high-impedence-busbar-protection.html
11/7/2016
Page 2 of 8
Stabilizing voltage
The voltage developed across the CT secondary during maximum fault
condition.
Vs If * ( Rct + (2 * RL))
IF
Rct
RL
- CT secondary Resistance
- Lead resistance of cable
http://testingcommissioning.blogspot.in/2012/09/high-impedence-busbar-protection.html
11/7/2016
Page 3 of 8
selection
Rct - CT secondary Resistance
Rct can get from the CT specification
Consider 3000/1 Tap used for Bus bar protection and Rct = 4.65 ohms
RL - Lead resistance of cable
Example:
6 Sqmm cable RL = 0.00308 ohm/meter at 20 dec C
RL at 75 dec C = RL ( 1+ 20 (T2-T1))
Consider length = 500m
RL at 75 dec C =1.88 ohms
Stabilizing voltage
Vs IF * ( Rct + (2 * RL))
Vs = 21 X ( 4.65 + ( 2 X 1.88 ))
= 177 volts
Consider 20% Margin
= 177 x 1.2 = 211.932 volts
Hence select Vs = 275 volts
Therefore in maximum fault current the voltage developed across the CT
secondary at the relay end is 275 V.
VOLTAGE OPERATE RELAY (MFAC - AREVA)
Calculate voltage actually need to operate the relay or total voltage drop in
the secondary circuit during the Maximum fault condition
Is = Total secondary current drop
Is = CT Magnetizing current + CT supervision relay coil current ( MVTP)
+ Protection relay coil
current for set value (MFCA SETTING RANGE 25-325 V) + Metrosil
leakage current
= Im + I mvtp +Ir + Imetrosil
http://testingcommissioning.blogspot.in/2012/09/high-impedence-busbar-protection.html
11/7/2016
Page 4 of 8
http://testingcommissioning.blogspot.in/2012/09/high-impedence-busbar-protection.html
11/7/2016
Page 5 of 8
http://testingcommissioning.blogspot.in/2012/09/high-impedence-busbar-protection.html
11/7/2016
Page 6 of 8
http://testingcommissioning.blogspot.in/2012/09/high-impedence-busbar-protection.html
11/7/2016
Page 7 of 8
http://testingcommissioning.blogspot.in/2012/09/high-impedence-busbar-protection.html
11/7/2016
Page 8 of 8
Newer Post
Home
Older Post
Blog Archive
2016 (16)
2014 (3)
2013 (24)
2012 (46)
December (3)
October (2)
September (4)
HIGH IMPEDENCE BUSBAR PROTECTION
TRANSFORMER TERTIARY WINDING
VT SECONDARY INJECTION
CT TESTING IN OUTDOOR SUBSTATION
August (5)
July (7)
June (1)
May (3)
April (3)
March (3)
February (6)
January (9)
2011 (35)
2010 (13)
About Me
SIVAKUMAR
THIS IS SIVA T&C ENGINEER IN NCC LTD - SAUDI.
View my complete profile
http://testingcommissioning.blogspot.in/2012/09/high-impedence-busbar-protection.html
11/7/2016