Sie sind auf Seite 1von 1

rsr#

l--Z"i
"'+">
{)t)

!\p -.,, +:

SOUTHERN POWER DISTRIBUTION COMPANY OF A.P. LIMITED

TIRUPATI

'

*,t {. * r(

Merno.No.CGM/P&MM/GM-IT/T.Sotar/D.No. hZ A1
sub: - Elecy.

- APSPDCL, Tirupati Billing - Reg.

Solar net Metering

S. Dt:

rfl

9-20 I S.

Energy settlement and

Ref:- 1) G.O.Ms.No.8 Dated 12.02.2015.


2) Memo.no.CGMlP&MM and IPC/TPT/GM/IPC/F./D.No. 905/ 1 5 Dt. 0 1 09.20
.

I 5.

1) Revised guidelines were given for energy

settlement and billing of solar rooftop


consumers vide ref (1) & (2) cited. As per these guide lines The energy generated from
solar rooftop consumer shall be adjusted against the consumption of energy from the
DISCOM every month.

2) In case of excess generation

(after adjustment) injected into DISCOM network in a


billing month will be carry forward to next month till every quarter end (instead of
every six months) and settlement will take place on average cost of supply(ACoS)
basis for net metering as determined by APERC from time to time.

3)

To enable these services to bill under solar net metering with sopt billing machines, the
following pre-requisites are to be fulfilled.

a) All the solar rooftop services shall be converted to High-valueA.,lonslab


b)

c)

mode

of

billing.
The initial net meter import and export readings shall be updated for the service.
'lhen the spot billing data is to be downloaded and billed by giving current month
import and export readings.

d) The bill will be generated for net consumption (import units- export units).
e) If net consumption is negative then monthly minimum bill will be issued. The excess
units exported into DISCOM shall be recorded for making payment to the consumer
at the end of that quarter.

4) All the

Superintending Engineers/Operation are requested


instructions are follorved while issuing bills to the solar rooftop

to

ensure that above

Chief General
APSPDCI,

ATI.

To
AII the Superintending Engineers/Operation/ASPDcl/ vJA, GNT, ONG, NLR, TPT,
KDP, ATP, KNL.
Copy to:

AII DEs/Operation for necessarX- action.


The Chief Engineers/ZoneNlA, TPT, KNL.
Copy submitted to:
The Chairman and Managing Director/APsPDcl/Tirupati.
The DirectorlTechnical & HRD/APSPDCLlTirupati
The Directorlt'inance/APSPDCllTirupati

Das könnte Ihnen auch gefallen