Sie sind auf Seite 1von 26

Contractor Name - Evercrest projects Pvt. Ltd.

Ammendment required
Name of Project : Shalby Hospital Surat

Project code :
Work order No. LOI /SUT/004/15-16

Measurement checked based on work and pending activities in Internal building


Exclude Utility building

Date : 22/08/2016

As per contract
Sr. No.

Description

As on date work execute

Evercrest Projects
Qty.

UoM

800

Cmt

170

136,000

500

Cmt

245

122,500

10

Cmt

80

800

Rate

Qty.

Amount

CIVIL WORK
1

1.01

1.02

1.03

EARTHWORK
Earthwork in excavation for foundations by
mechanical or manual of walls, columns &
trenches , Tanks, Chambers etc. in all kinds of
soils such as hard stiff clay, stiff black cotton,
hard red earth, shales, gravel in all conditions
such as dry, wet and slushy, including levelling
to grade and ramming of bottoms, refilling the
trenches, dewatering wherever required
necessary shoring and strutting and disposal
-do-as
per item
lift1000
up tom
5.0radius
m to
excavated
earthNo.1.01
, lead but
upto
10.0m
depth
from the external boundary of the said building
and lift up to 5.0m ;disposed earth to be
levelled and neatly dressed as directed and
specified.theNote:
Quoted
shall beclods
inclusive
Filling
earth
incl. rate
breaking
and
of backfilling
the trenches
the up
available
dressing
(excluding
rock) forwith
making
levels
excavated
up ground
to 1.0 levels
m to
such
as for earth.
plinthsExcavation
or for raising
5.0m landscaping,
depth
for
behind retaining walls,
leveling under structures etc. as per final
formation levels, with available excavated soil
in layers not exceeding 20cm in depth
including watering ,ramming consolidating
with using vibrating compactor or roller etc.
lead up to 100 mt. and lift for any depth from
original ground level in foundation and plinth

Amount

Qty. Ammendment
required

1.04

- Do- as per item No.1.03 but with selected or


approved earth brought from out side plot
premises including all royalties, lead and lift
etc. complete.(Consolidated measurements of
fill shall be paid under this item

10

Cmt

750

7,500

1.05

Providing and laying good quality sand for


filling in foundation and plinth (under floors)
including
watering,
ramming
well,
consolidating and dressing etc. complete as
per direction of the engineer-in-charge.

Cmt

900

7,200

Total of Earthwork Carried Over to Summery

2.0

2.01

274,000

CONCRETE WORK
Providing and laying machine mixed machine
vibrated plain cement concrete M15 grade
using 40mm down graded coarse aggregate of
approved quality in sub and super structure for
base of column footings, bases of walls, rafts,
plinth beams, pits, machine foundation to make
up level, etc.; including compacting, curing
and dewatering where required by bailing or
pumping out water, cleaning, preparing
surfaces, junctions, etc.;but excluding the cost
of centering and shuttering complete at all
depths as per the drawing and to the
satisfaction of the Engineer-in-charge.
(Minimum cement content of 240 Kg/cum of

10

Cmt

4200

42,000

2.02

-do-as per item No.2.01 with M10 Grade


concrete with minimum cement content of 230
Kg/cum of concrete)
B1, Ground Floor
floors,)

( Utility block, Toilet

Cmt

4300

Total of Concrete Work Carried Over to


Summary
3.0

REINFORCED CEMENT CONCRETE

SITE MIX CONCRETE

42,000

Providing and laying machine mixed machine


vibrated reinforced cement concrete of
specified grade (cast-in-situ) using 20mm
down graded coarse aggregate of approved
quality in all RCC Works ,for all floors/all
levels /all heights/all depths from FFL/GL.in
any position & any shape for all types of
structures
as mix
shown
drawing.
including
The concrete
designinshall
be confirming
to
mixing
,
placing
and
compacting
to
proper
latest IS 10262 with minimum cement content
shape
and size ,level
plumbs
for durability
& theand
same
shall, finishing
be done the
in
surface
smooth,
curing
for
required
period etc.testing laboratory approved by the Engineer
Rate
shall including close
hacking,
in - charge/Structural
consutant.
Theproviding
finish to
recesses,
opening/cutout
for
services in
finish floor height not exceeding 4.50mts.
columns, walls, beams and plinth beams etc.,
cost of materials, labours, conveyance ,loading
and unloading, sundries, T & P etc.but
excluding cost of centering, shuttering and
reinforcement etc. All materials to confirm
relevant IS standards. complete.
3.01
a

M-25 grade with minimum cement content


340Kg/cum
Basement-I and GF( Ground Floor ( Utility
block)

10

Cmt

4850

48,500

17.815

76604.500

25

READDY MIX CONCRETE

3.02

3.03

Providing and laying in position all types of


Ready Mixed Concrete of specified grade
manufactured in fully automatic batching plant
and transported to site of work in transit mixer
having
continuous
agitated
mixer,
manufactured as per mix design, including
pumping of R.M.C. from transist mixer to site
of laying,cost of admixtures in recommended
Note : 1. Ready Mixed Concrete should be
proportions as per IS:9103 / instruction of
from reputed manufacturers and contractors
structural consultant to accelerate/retard setting
have to obtain prior approval of consultant /
of concrete, improve workability without
EIC with respect to supplier of RMC (2)Rate
impairing strength and durability, placing and
to include the transportation with all leads
compacting to proper shape and size, level and
from RMC plant to the place of work and
plumbs , finishing the surface smooth, curing
pumping
of concrete
concrete to
height and
theusing
rate
Ready
mix
of any
M10
for required
period etc.
Rategrade
shall mix
including
shall
be
for
all
leads.
(3)
Cement
concrete
20mm
and down graded
coarse aggregate
close sizehacking,
providing
recesses,
delivered
at quality
site should
be
workable
and
of
approved
in
all
PCC
workswalls,
with
opening/cutout for services in columns,
should
satisfy
all
the
required
standard
tests
minimum
content
of cost
230 of
Kg/cum
of
beams andCement
plinth beams
etc.,
materials,
like
cube test and slump test etc., as specified
concrete.
labours, conveyance ,loading and unloading,
in code practice. (4) Contractor has to ensure
sundries, T & P etc. but excluding cost of
proper strong shuttering / centering to receive
centering, shuttering and reinforcement
the concrete at all heights.(5) Department will
etc.,
as per direction of Engineer-in-charge.
Basement-I
not
have any direct contact in matters relating
to payment ,delivery schedule,quality of
concrete etc. it is the responsibility of
Supply
andensure
laying proper
RMC M25
grade (withfor the
contractor
co-ordination
minimum
cement
content
340
timely supply of concrete and Kg/cum
approvedofquality
concrete)
product.

Cmt

3900

19,500

250

Cmt

5175

1,293,750

17.765

91933.875

3.07

Charges for making holes in RCC wall, slabs


or any other RCC members by diamond core
cutting machine of HILTI or equivalent
incl.disposing the debris. etc.complete as
directed and specified by EIC.Measurement
will be taken for the depth of holes in running
meter.

Holes up to 100mm dia

10

Rmt

2500

25,000

20.056

50140.000

from 101 to 150mm dia

35

Rmt

3170

110,950

20.439

64791.630

making opening in RCC floor by stitch cutting


method (600mmx1000mm) for making shaft

75

Nos

5000

375,000

70

350000.000

Providing and inserting, fixing , rebar of


reinforcement steel including drilling,grouting
with chemical with pull out test as per
manufacture instructions (Hilti make or
equivalent )
10mm diameter

50

Nos

110

5,500

47

5170.000

12mm diameter

50

Nos

140

7,000

18

2520.000

16mm diameter

300

Nos

325

97,500

3.10

Total of RCC Work Carried Over to Summary

4.0

STEEL WORKS

1,982,700

50

4.01

5.0

5.01

Providing, straightening, cutting, bending and


binding in position thermo-mechanical
tretated (TMT) bars for RCC structure (sub
structure and super structure) / items at all
floors/all depth /all height and all level,
confirming to relevant
with Fy =500
N/Sq.mm. to correct shape and size as per
detailed drawings, specifications and approved
bar bending schedules, in all RCC works with
correct size PVC cover blocks or approved
quality concrete cover blocks of same grade of
concrete and binding wire of 16 gauge, incl.
provision of wastage, rolling margin etc.
complete
as Carried
directed
and
Total of Steel Work
Over to Summary
specified.Measurement will be made on the
length basis and converted into weight by
using
the standard co-efficient (rolling margin's
FORMWORK
and wastage shall not be paid.) The quoted rate
Providing
worktherigid
water tight,
should be form
inclusive
cost and
of binding
wire
centering
and
shuttering
using
best
of
and the same will not be measured quality
and paid
ordinary
timber
planking
and/or
shuttering
seperately. (Basic rate Rs. 47000/M.T)
plywood /steel plates with supporting system
of MS adjustable steel props / spans / Frames
for all RCC works all heights / all levels / all
depths / all floors in horizontal / vertical /
slanting surfaces of any shape and size
including strutting, propping, bracing, staging
etc. complete, so as to give smooth/ fair finish
and careful removal of formwork after
specified period etc. complete all as per
specifications and direction of Engineer-incharge. The height of propping and cenering
below supporting floor to ceiling not exceeding
U/g Basement-I to 9th Floor
4.50mts.

Total of Form Work Carried Over to Summary

50

MT

56500

2,825,000

1.030

58195.000

22.650

7927.500

2,825,000

2000

Smt

350

700,000

700,000

6.0

6.01

a
b

6.02

MASONRY WORK
Providing and laying brick masonry wall
230mm in true line, level and plumb with CM
1:6 (1 cement : 6 coarse sand) proportion for
foundation and super structure
with best
quality approved bricks crushing strength not
less than 35 Kg/ Cm2. in any shape,in any
position, including cost & conveyance of all
other materials at site, scaffolding, lead & lift
Up to Plinth
levelcuring & all other operational
raking
of joints,
& labour charges etc. complete.
All Floors
Providing and laying brick partition wall
115mm thick in true line, level and plumb
with CM 1:4 (1 cement : 4 coarse sand) with
best quality approved bricks crushing strength
not less than 35 Kg/ Cm2, in foundation and
super structure,in any shape ,in any position,
including cost & conveyance of all other
materials at site, scaffolding, lead & lift raking
Basement-I
to 9th &
floor
of
joints, curing
all other operational &
labour charges etc. complete.

Cmt

5200

26,000

100

Cmt

5000

500,000

36.641

183205.000

2000

Smt

720

1,440,000

150.414

108298.080

Total of Masonry work Carried Over to Summary

7.0

7.01

PLASTERING & WALL FINISHING


Providing and applying average 12 to15mm
thick single coat mala plaster with cement
mortar in proportion 1:4 (1 cement : 4 sand) to
all type of big or small RCC/ brick /block work
at all floors / all levels / all heights /internal or
external surfaces/all shapes finished as
specified and directed by the Engineer-incharge. work to including cost of normal patta ,
grooves, racking the joints or roughening the
RCC surface, providing and fixing 24 gauge

1,966,000

7.03

7.04

7.05

Basement-I to 9th Floor


Providing and applying minimum 20 mm thick
double coat sand faced plaster ; first coat to
be 12mm thick cement mortar of mix ratio 1:4
(1 Cement : 4 Sand). Second finishing coat to
be 8 mm thick in cement mortar of mix ratio
1:2 (1 Cement : 2 Sand) on all type of big or
small RCC /brick/ block works at all floors /
all levels / all heights /internal or external
Basement-I to 9th Floor
surface / all shapes finished as specified and
directed by the Engineer-in-charge. Work to
include hacking the R.C.C. surfaces, raking out
Providing
15 mm.surfaces,
thick water
proof
cement
joints, cleaning
curing,
necessaary
plaster
in
single
coat
on
any
surface,
at GI
all
scaffolding, providing and fixing 24 gauge
heights/all
floors/all
levels,
finished
even
and
chicken mesh 150 mm wide at junctions of
smooth
1:3 work,
(1 cement
3 sand),
concrete in
andCM
masonry
making: sharp
and
including
providing
and
mixing
water
clear
grooves,
pattas,
drip proofing
moulds,
materials
suchand
as Ditchtament
DM, Fosroc,
etc.complete
to the approval
of the
Cico
no.1
or
equivalent
as
approved
by the
Engineer-in-charge.
Supply
and
applying
White
washing
with
Engineer-in-charge, in cement mortar lime
in
(three
or more
coats) to give
an even
shade on
proportion
recommended
by the
manufacturer.
new
including
cost of
and surfaces,
all other
workwork
to include
hacking
thegum
R.C.C.
materials,
labour
etc,
complete
for
all
floors.
cleaning surfaces,curing, necessary scaffolding

3000

Smt

250

750,000

3190.884

797721.000

500

Smt

340

170,000

500

Smt

275

137,500

11.191

3077.525

1000

Smt

45

45,000

810.970

36493.650

15000

Smt

65

975,000

3835.730

249322.450

etc.complete. The contractor to give testing for


water tightness and provide guarantee for 5
years on Rs.100/- stamp paper in approved
Performa
Providing & applying three coats of putty of
7.06

approved make, brand and manufacture, on any


surfaces, at all heights/all floors/all levels, to
give an even shade, including thoroughly
cleaning the surface free from mortar
droppings and other foreign matter and sand
papered smooth; complete to entire satisfaction
of the Engineer-in-charge.

7000

7.07

7.08

8.0

Providing & applying three coats of plastic


emulsion paint of desired shade, of approved
make, brand and manufacturer, on any 12000.00
surfaces, at all heights, to give an even shade,
including thoroughly cleaning the surface free
from mortar droppings and other foreign matter
and sand papered smooth. The paint shall be
applied after applying oil base primer and
Laying/ applying/ fixing of provided
cement base putty up to desired
finish
wallpapers including all fixing materials and 2000.00
etc.complete to entire satisfaction of the
methods required for the same at all heights/
Engineer-in-charge.
Total of
Plastering
Carried Over
to Summary
levels
and
spaces mentioned
thereof.
(internal
walls only)

Smt

140

1,680,000

87.035

Smt

110

220,000

3,977,500

FLOORING
Note : The Item rate quoted shall be for all
floors, heights, shapes and places.

8.01

8.02

Providing & laying avgerage 25 mm. thick


hand dressed green polished kotah stone of
approved quality, selected and sorted for
uniform colour, in floor,otta ,trench cover etc.
at all heights and levels, in required sizes up to
60 cm. as per design with normal pattern
(square, rectangular) as per drawings,
including cement mortar bedding of 1:4
proportion
required
thickness,
with
-doas itemin-8.01
but for
platform jointed
top, vertical
grey cement
and sill
colour
pigment
as specified.
support
,window
and self
in required
sizes
Three or more
coatscutof and
polishing
,curing
etc.
including
machine
machine
polished
complete.
up tosurfaces,edges,etc.
the satisfaction of the
Architect
on
all exposed
complete.
as
& Engineer-in-charge
(No waxing will be
per
the architectural details.
permitted).

100

Smt

1050

105,000

100

Smt

1050

105,000

12184.900

8.07

8.09

8.11

8.13

8.14

Providing and laying average 18 mm. thick


Granite of approved quality selected and sorted
for its uniform colour in floor, trench cover etc.
as per design and in required sizes and shapes,
including necessary cement mortar bedding of
1:4 proportion in required thickness and using
cement slurry (3.3Kg/smt) for setting &
jointing the Granite, polishing, curing etc.
complete. All angles and edges of granite slabs
are true and square and are free from
-do-as
item
-8.07
butwill
for cladding
onout
wallaswith
chipping
.The
work
be carried
per
approved
adhesive/
neet
cement
as per
detailed drawings and direction. complete
to
standards
specification
in required
sizes and as
entire satisfaction
of the
Engineer-in-charge.
per
details,
with all joints,
(basicarchitectural
price of granite
Rs.1500/smt)
moulding, polishing, buffing,angle cutting, etc
complete to the satisfaction of the engineer- incharge.

-do- as per item No. 8.07 but for 75mm high


skirting including zari filling etc.complete., as
per architectural details

Providing and laying approved quality, colour,


design
and
shade
Vitrified
tiles(300mmx300mm) in floor confirming to IS
13753, bedded over a minimum 25 mm. thick
cement mortar 1:5 bedding on 20 mm wired
finish screed and laid to proper slope and level
as detailed drawings or as directed by the
Engineer-in-charge. Tiles fixed to correct line,
level, plumb,
slopes,approved
joints quality,
well cleaned,
Providing
and fixing
colour,
grouted with
approved
design
and matching
shade colour
vitrified
tiles ready
for
made grout, cured, etc. complete
at all height
dado(600mmx600mm)
to internal
walls
and lead complete
entire satisfaction
of the
confirming
to IS to13753
fixed to cured,
Engineer-in-charge.
rate shall
cost
hardened,
plasteredThe
surface,
withinclude
approved
of
cement
mortar
bedding
and
20mm
wired
tiles
adhesive
as
per
co.'s
specification
in
Less supply of tiles deduction base on Basic
finish
screed.(
Basic
rates
of
tiles
pattern
as per
perSqm
the architectural drawing or as
rate
425/Rs.425/Smt)
directed by the Engineer-in-charge. Tiles fixed
to correct line, level, plumb, joints well
cleaned, grouted with matching colour
approved ready made grout, cured, etc. all

30

Smt

2700

81,000

50

Smt

2750

137,500

200

Rmt

350

70,000

400

Smt

950

380,000

500

Smt

1000

500,000

450.442

450442.000

-144500

600

8.16

8.17

8.24

9.0
9.1

Providing and fixing approved quality, colour,


design and shade Glazed Ceramic tiles to
walls(300mmx600mm) confirming to IS 13753
fixed to cured, hardened, plastered surface,
with neat cement paste, in pattern as per the
architectural drawing or as directed by the
Engineer-in-charge. Tiles fixed to correct line,
Less
tileswell
deduction
on Basic
level, supply
plumb, of
joints
cleaned,base
grouted
with
rate
375/per
Sqm
matching colour approved ready made grout,
Providing
& complete
laying 20at mm
thick and
mirror
cured, etc. all
all height
lead
polished
darkof thegranite
of
complete tolight
entireand/or
satisfaction
Engineerapproved
and ofshade
for 375/sq.mt.)
sandwhich
in-charge.(quality
Basic rate
tiles Rs.
platform,facia, basin counter at all heights and
levels. Rate should include for making
necessary openings in the platform/ counter
including providing and fixing the facia at
front. The counter shall be fixed making
Providing
and laying
thick wall.
cement
chasing inside
brick 50mm
/ block
concrete
flooring
I.P.S.(Indian
Patent)
Measurement of the facia will be taken in 1:2:4
sqmt
(1
cement
:2 coarse
sand includes
:4 graded
stone
under
this item
only. Rate
necessay
aggregate),
laid inlike
alternate
panels
not more
bonding adhesive
Araldite
or equivalent,
than
10
sq.mt.area
and
in
one
layer
filling the joint with white cementfinished
slurry
with
trowel
with
using the
1:1 shade
cement
admixed
with finish
pigment
to match
of
mortar
the minor
holes confirming
granite for
andfilling
providing
protecting
layer of
to
IS:2114
as directed
at all execution
level complete.
Plaster
of Paris
during entire
period,
Rate
to
include
for
Total of Flooring
Over
to Summary
removing
same etc.Carried
complete
as forms,machine
per
design and
mixing,curing,preparing
groovesetc.
and complete.
finishing
in required sizes and shapes
etc.complete
as per
the specification
(Only finished
granite
work shall and
be
direction
of
Engineer-in-charge.
measured).
Including
Kota
stone
also
which
WATERPROOFING
shall be sandwich with granite for providing
For ToiletWhite cement is required only where
strength.
we used White stone, not necessary at every
where. moulding(hafl or full round), polishing,
Providing
and applying
integral
penetrating
buffing, corner
cutting, angle
cutting
etc to be
crystalline
considered inwaterproofing
the quoted pricetreatment
and will nottobe
base,
walls
etc. tobasis.
be carried
out asof per
the
provided
on extra
( basic price
granite
manufacturer's
specifications. Work shall be
1500 rs per sq.mt.)
carried out as per the approved method of
waterproofing by approved water proof
materials having speed of penetration of 31
cms in 56 days and resistant to 16 bar
hydrostratic water head. at all depth/height and
level etc.complete, including furnishing of a
guarantee for 10 years. The work should be

2000

Smt

950

1,900,000

1898.131

1803224.450

-617250

90

Smt

4200

378,000

100

Smt

275

27,500

3,684,000

1000

Smt

450

450,000

886.025

398711.250

2500

Total of Waterproofing Carried Over to Summary


8.23

450,000

DISMENTALING WORK
Dismantling of Brick , floor tile, RCC work in
all floor and same is to be dispose of outside of
plot area.

100

Cmt

400

40,000

Total dismental work

10

10.1

10.2

11

426.746

170698.400

450

40,000

GRANITE FRAME WORK:- (Additional


work-26/01/2016)
Providing and fixing mirrore polised light
and/or dark granite of approved quality and
shade for Granite door frames at all height
and levels. Rate includes for making necessary
opening, chamfer joints, edge moulding,
buffing, polishing etc complete. Rate includes
necessary
adhesive
aralditelight
or
Providing bonding
and fixing
mirrorelikepolised
equivelent,
filling
joint
with
white
cement
and/or dark granite of approved quality and
slurry
with window
pigment frames
to match
shade admixed
for Granite
at the
all
shade
of
granite
and
providing
protecting
layer
height and levels. Rate includes for making
of
plaster of
paris during
execution
necessary
opening,
chamferentire
joints,
edge
period;
removing
same
etc
complete
as per
Copint
basment etc
andcomplete.
ground
moulding,/ Lintel
buffing,at polishing
design
and Drawing
in necessary
required bonding
sizes andadhesive
shapes like
etc.
floor
new
Rate includes
complete.
(
Only
finished
granite
work
shall
be
araldite or equivelent, filling joint with white
measured
).
frame
design/detail
to
match
cement slurry admixed with pigment to match
existing
frames.
the
of granite Lintel
and providing
230shade
mm Concrete
/ copingprotecting
at lintel
layer of plaster of paris during entire execution
level as per given sheet
period; removing same etc complete as per
design and in required sizes and shapes etc.
complete.
( Only finished
granite
work shall
be
115 mm concrete
coping
at proper
height
measured
).
frame
design/detail
to
match
to stength partition wall
existing frames.

120

Rmt

1000

120,000

132.970

132970.000

150

233

Rmt

500

116,500

317.340

158670.000

320

New item
Qty.

Quoted rates

688

41280

New item

60

Quoted rates

400

106000

New item

265

TOTAL OF GRANITE WORK

236,500

The measurement for underground water


tank,over head water tank shall be paid in
Note : relavant item of works . No extra shall be paid.
Mode of measurement will be as per actual.
For any item, floor rise is not extra.
All materials to be disposed at no extra cost,
outside of plot limits
Grand Total INR

16,177,700

Service tax @ 6%

970,662

Total Amount

17,148,362

4450551

As per new drawing of Basement and ground

0.1

0.1

265

2.65

4850

12852.5

265

0.617

327.01

0.32701

56500

18476.065

1738.4 161.50130063

350

56525.455221

87854.020221