SAUDI ARAMCO ID/PID FORM REV 1 - 010109

Rev 4

SAUDI ARAMCO TYPICAL INSPECTION PLAN

COS 3/31/2010
SATIP No.

Internal FBE Coating of Field Girth Welds & Repairs

SATIP-H-002-08

PROJECT TITLE:

ITEM
NO.

1.0

PROJECT PHASE

APPROVED DATE

WBS/BI/JO/NO.

TASK / ACTIVITY

QUALITY
PROCEDURE

QUALITY
RECORD

DISCIPLINE:

31-Aug-11

MECHANICAL

CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR

SAUDI
ARAMCO

REMARKS

DOCUMENT REVIEW

1.1

Procedure for Internal FBE Coating of


Field Girth Welds & Repairs*

SAIC-H-2057

SAIC-H-2057

RH

RH

1.2

Coating Personnel Qualification

SAIC-H-2010

SAIC-H-2010

RH

2.1

Verification of FBE Powder materials and


Abrasive materials including Storage and
Handling (APCS-102)

SAIC-H-2058

SAIC-H-2058

2.2

Inspection and verification of FBE


Coating application equipment

SAIC-H-2013

SAIC-H-2013

Use SATR-H-2004 & SATR-H-2012

3.1

Inspect Pipe end prep prior to tack


welding field joints. *Chloride Content
Testing & Contamination Prevention

SAIC-H-2059

SAIC-H-2059

Use SATR-H-2011.

3.2

Verification/Calibration of
Crawler+internal mechanical blasting
head on "TEST PUP"

SAIC-H-2059

SAIC-H-2059

Use SATR-H-2011.
Test Set-up & Calibration each Production run

3.3

Verification/Calibration of
Crawler+Powder spray head on "TEST
PUP" Prior to internal of production
welds

SAIC-H-2060

SAIC-H-2060

Use SATR-H-2008, SATR-H-2009, SATR-H-2010 &


SATR-H-2012
Test Set-up & Calibration each Production run

3.4

Internal FBE Coating Application on Field


Girth Welds Including Repairs

SAIC-H-2060

SAIC-H-2060

Use SATR-H-2012
Repairs (Rework criteria) is clearly identified

2.0

3.0

The procedure shall be approved by RSA (CSD).

MATERIAL RECEIVING

FIELD APPLICATION

Page 1 of 2
2/14/2012 2:19 PM

SAUDI ARAMCO ID/PID FORM REV 1 - 010109

Rev 4

SAUDI ARAMCO TYPICAL INSPECTION PLAN

COS 3/31/2010
SATIP No.

Internal FBE Coating of Field Girth Welds & Repairs

SATIP-H-002-08

PROJECT TITLE:

ITEM
NO.

1.0
3.5

APPROVED DATE

WBS/BI/JO/NO.

PROJECT PHASE

DOCUMENT REVIEW

TASK / ACTIVITY

Final Inspection and Acceptance (Using


Video Camera)

QUALITY
PROCEDURE

QUALITY
RECORD

SAIC-H-2060

SAIC-H-2060

DISCIPLINE:

31-Aug-11

MECHANICAL

CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ASSIGNMENTS

CNTRCTR

SAUDI
ARAMCO

REMARKS

Use SATR-H-2012

GENERAL NOTES
1
2
3
4

Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness:

QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
organization representative is not present.

Hold:

QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization
representative in attendance.

If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND

Hold Point for QC Inspection/ Test

Witness Inspection/Test

Surveillance

R
RH
I

Review of Documents
Review and Approval of Documents
100% Contractor Inspection

Page 2 of 2
2/14/2012 2:19 PM