Beruflich Dokumente
Kultur Dokumente
CONDITION MONITORING
Andy Millar
Bombardier Rail Control Solutions, Plymouth, UK
77%
23%
3
Bombardier Inc. or its subsidiaries. All rights reserved.
46%
24%
16%
14%
Slow changes
Track breaks
Infrastructure faults
Tx/
Rx
Tx/
Rx
A1
Tx/
Rx
B1
Tx/
Rx
C1
10
Tx/
Rx
Tx/
Rx
A2
Tx/
Rx
D1
Tx/
Rx
C2
Decaying current
on blue channel
due to wet ballast
11
12
Must be small fraction of track circuit cost (track circuit cost typically
1000 - 5000)
13
14
15
17
18
Any Questions?
19
Bombardier Inc. or its subsidiaries. All rights reserved.