Schindler Modernisation
Air conditioning
and heating
48%
Space Conditioning
10%
Lighting
19%
Office Equipment
22%
Schindler Modernisation
Residential Building
Lighting
22%
Schindler Modernisation
Air conditioning
and heating
48%
Space Conditioning
10%
Lighting
19%
Office Equipment
22%
Schindler Modernisation
Residential Building
Lighting
22%
Schindler Modernisation
Machine Room
Conversion of hydraulic lift system or low-rise
machine-room solution to machine-room-less
(MRL) technology
Freeing up machine room space for other use
Reduced machine room cooling requirement
Possible use of PF1 (Power Factor 1) regenerative
power for machine room lighting and ventilation
Bank of Indonesia
Jakarta, Indonesia
Jardine House
Hong Kong
Reserve Bank
Pretoria, South Africa
Marriott Marquis
New York, USA
Car
Car lighting and ventilation automatically switched
off when lift not in use
Schindler Modernisation
Schindler Modernisation
Machine Room
Conversion of hydraulic lift system or low-rise
machine-room solution to machine-room-less
(MRL) technology
Freeing up machine room space for other use
Reduced machine room cooling requirement
Possible use of PF1 (Power Factor 1) regenerative
power for machine room lighting and ventilation
Bank of Indonesia
Jakarta, Indonesia
Jardine House
Hong Kong
Reserve Bank
Pretoria, South Africa
Marriott Marquis
New York, USA
Car
Car lighting and ventilation automatically switched
off when lift not in use
Schindler Modernisation
Schindler Modernisation
Existing
Controller
DC Machine
or
DC Inverter
Existing
Controller
AC
After Modernisation
DC
AC Machine
DC
Field
Module
DC Machine
or
AC
AC Inverter
AC Machine
New
Controller
AC
AC Inverter
AC VWF Machine
Existing component
Modular approach
Schindler offers a phased modernisation approach which
enables you to plan the scope of the modernisation stages to
suit your project schedule and nancial planning.
100%
Lift No. 1
Lift No. 2
47%
Switching Gear
Power Grid
New component
Lift No. 3
Lift No. 4
Building lighting
Cooling system
Old System Ward Leonard
Schindler Modernisation
Schindler Modernisation
Existing
Controller
DC Machine
or
DC Inverter
Existing
Controller
AC
After Modernisation
DC
AC Machine
DC
Field
Module
DC Machine
or
AC
AC Inverter
AC Machine
New
Controller
AC
AC Inverter
AC VWF Machine
Existing component
Modular approach
Schindler offers a phased modernisation approach which
enables you to plan the scope of the modernisation stages to
suit your project schedule and nancial planning.
100%
Lift No. 1
Lift No. 2
47%
Switching Gear
Power Grid
New component
Lift No. 3
Lift No. 4
Building lighting
Cooling system
Old System Ward Leonard
Schindler Modernisation
Schindler Modernisation
Conventional
Schindler Modernisation
Schindler ID
Schindler Modernisation
Conventional
Schindler Modernisation
Schindler ID
Schindler Modernisation
Eco-friendly escalator
Solution
(non-cumulative) *
30% to 55%
25% to 50%
VVVF Control
20% to 60%
10% to 25%
10% to 25%
30% to 50%
10%
10% to 50%
10% to 15%
* Remarks:
1) The specifications, options, solutions and estimates of energy savings expressed within this brochure are indicative only.
They are not intended to, and they do not, constitute an offer on the part of Jardine Schindler Group or Schindler Group.
2) Actual energy-savings results depend upon the condition of the existing equipment, the model and package offered and the
passenger flow pattern.
10
Schindler Modernisation
Schindler Modernisation
11
Eco-friendly escalator
Solution
(non-cumulative) *
30% to 55%
25% to 50%
VVVF Control
20% to 60%
10% to 25%
10% to 25%
30% to 50%
10%
10% to 50%
10% to 15%
* Remarks:
1) The specifications, options, solutions and estimates of energy savings expressed within this brochure are indicative only.
They are not intended to, and they do not, constitute an offer on the part of Jardine Schindler Group or Schindler Group.
2) Actual energy-savings results depend upon the condition of the existing equipment, the model and package offered and the
passenger flow pattern.
10
Schindler Modernisation
Schindler Modernisation
11