Beruflich Dokumente
Kultur Dokumente
REV.
GENERAL
NO.
REV.
NO.
ITEM NUMBER
2
3
QUANTITY
CAPACITY (NOMINAL)
SERVICE
5
6
DESIGN CODE
LOCATION
2
45 KL (Water Capacity)
SHELL
9
10
FLUID
SPECIFIC GRAVITY
11
VISCOSITY
12
VAPOUR PRESSURE
(AT 30 DEG.C.)
Liquid NH3
0.58
cP
kg/cm2(a)
11.89
N9
N10 N2 N3 N11 N4
DESIGN DATA
15
16
N12
N8 N13
N5 N6 N7
SHELL
17
OPERATING TEMPERATURE
AMBIENT
18
DESIGN TEMPERATURE
(-) 33 TO 55
19
20
DESIGN PRESS.
21
INSIDE DIAMETER
22
LENGTH
23
kg/cm2(a)
23.55 kg/cm2(a)
mm
3000
mm
24
7250
- BOTTOM
DISHED END
CORROSION ALLOWANCE
26
SUPPORT
SADDLE
27
INSULATION - REQUIRED
YES / NO
28
N1
DISHED END
25
29
1 OF 1
322-T-441 A/B
13
14
SH
3.0 m
TCE.M4-CH-T-PDS-
R0-1997-03-31
- PURPOSE
mm
7.25 m
3 MM
PERS. PROTEC./CONSER.
AGITATOR
YES / NO
29
30
NOTES :
3) This vessel shall be designed, fabricated, manufactured, inspected by Third
Party & Testing as per the requirement of "The Static & Mobile Pressure
Vessels Rules"(SMPV Rules) .This vessel shall be approved by CCoE Nagpur
MATERIAL OF CONSTRUCTION
31
32
SHELL
33
JACKET
NA
34
COIL
NA
35
INTERNALS
36
GASKET
37
38
AGITATOR
YES / NO
N14
25
39
BAFFLES
YES / NO
N13
50
SPARE
40
COIL
YES / NO
N12
50
SPARE
41
42
DIP PIPES
YES / NO
N11
N10
500
25
1
1
MANHOLE
TEMPERATURE INDICATOR
SPECIAL REQUIREMENTS
43
N9
25
LEVEL GAUGE
44
RADIOGRAPHY
100%
N8
25
45
STRESS RELIEF
AS PER CODE
N7
25
46
47
BUFFING
OTHER
NA
NA
N6
N5
25
HOLD
1
1
PRESSURE TRANSMITTER
PRESSURE GAUGE
48
NOTES :
N4
HOLD
49
N3
HOLD
51
finalization.
N2
50
52
53
N1
NOZZ. NO.
50
SIZE
1
QTY.
SERVICE
NOZZLE SCHEDULE
54
REV NO.
AMMONIA IN
AMMONIA OUTLET (TO NH3 COMPRESSOR)
PPD. BY/DATE :
CKD. BY/DATE :
P0
R0
CLIENT
Sd/-SPP 31.8.05
Sd/-SPP 11.5.06
TCE-4246A
Sd/-MB 31.8.05
Sd/-VAK 11.5.06
CKD. BY:Sd/-MB
DATE :31.08.05
R1
REV.
NO.
ITEM NUMBER
2
3
QUANTITY
CAPACITY (WORKING)
SERVICE
5
6
DESIGN CODE
LOCATION
1 OF 1
322-T-442 A/B
2
35 KL
NH4OH SOLUTION STORAGE
N1 N10 N3
N7
N4
N5
N6
N9 N8 N11
SHELL
9
10
FLUID
SPECIFIC GRAVITY
11
VISCOSITY
12
35% NH4OH
0.85 - 0.94
cP
0.3
0.75
13
14
16
N12
N2
DESIGN DATA
15
SHELL
OPERATING TEMPERATURE
18
DESIGN TEMPERATURE
19
OPERATING PRESS.
kg/cm2(g)
20
DESIGN PRESS.
kg/cm2(g)
21
INSIDE DIAMETER
22
LENGTH
23
17
SH
2.75 m
TCE.M4-CH-T-PDS-
R0-1997-03-31
70
ATM.
10
mm
2750
mm
24
7000
DISHED END
- BOTTOM
25
CORROSION ALLOWANCE
26
INSULATION
DISHED END
mm
1 MM
- REQUIRED
27
7.00 m
AMBIENT
- PURPOSE
YES / NO
PERS. PROTEC./ CONSER.
28
29
MATERIAL OF CONSTRUCTION
29
SS 304L
30
SHELL
31
JACKET
32
COIL
33
34
INTERNALS
GASKET
NA
NA
SS 304L
PTFE ENVELOPED CAF
35
36
AGITATOR
YES / NO
37
BAFFLES
YES / NO
38
COIL
YES / NO
39
40
DIP PIPES
YES / NO
SPECIAL REQUIREMENTS
41
N13
N12
25
50
1
1
SAMPLING POINT
DRAIN
N11
50
RECIRCULATION INLET
42
RADIOGRAPHY
100%
N10
25
NITROGEN BLANKETING
43
STRESS RELIEF
AS PER CODE
N9
50
SPARE
44
45
BUFFING
OTHER
NA
NA
N8
N7
50
500
1
1
PVRV
SHELL MANHOLE
46
NOTES :
N6
50
SPARE
47
N5
50
PG
48
finalization.
N4
25
49
N3
25
TEMPERATURE INDICATOR
51
N2
80
52
53
N1
NOZZ. NO.
80 x 40
SIZE
1
QTY.
NOZZLE SCHEDULE
54
REV NO.
PPD. BY/DATE :
CKD. BY/DATE :
P0
R0
PPD. BY :SPP
CLIENT
TCE-4246A
Sd/- MB 31.08.05
Sd/-VAK 11.05.06
CKD. BY:MB
DATE :31.08.05
R1
REV.
NO.
ITEM NUMBER
2
3
QUANTITY
CAPACITY (NOMINAL)
SERVICE
5
6
DESIGN CODE
LOCATION
1
5 KL
VENT TANK FOR AMMONIA
9
10
FLUID
SPECIFIC GRAVITY
11
VISCOSITY
12
VAPOUR PRESSURE
(AT 30 DEG.C.)
1
cP
kg/cm2(a)
DESIGN DATA
15
16
N2
N3
N8
N1 N6 N7
SHELL
17
OPERATING TEMPERATURE
18
DESIGN TEMPERATURE
19
20
DESIGN PRESS.
21
INSIDE DIAMETER
22
LENGTH
23
AMBIENT
kg/cm2(a)
65
ATM,
LIQUID FULL
mm
1500
mm
24
N5
DISHED END
- BOTTOM
DISHED END
CORROSION ALLOWANCE
26
SUPPORT
SADDLE
27
INSULATION - REQUIRED
YES / NO
28
N4
3500
25
29
1 OF 1
322-T-445
13
14
SH
1.5 m
TCE.M4-CH-T-PDS-
R0-1997-03-31
mm
3.5 m
3 MM
- PURPOSE
PERS. PROTEC./CONSER.
AGITATOR
YES / NO
29
30
MATERIAL OF CONSTRUCTION
31
32
SHELL
33
JACKET
NA
34
COIL
NA
35
INTERNALS
36
GASKET
37
38
AGITATOR
YES / NO
39
BAFFLES
YES / NO
40
COIL
YES / NO
41
42
DIP PIPES
YES / NO
SPECIAL REQUIREMENTS
43
44
RADIOGRAPHY
NA
N8
50
SPARE
45
STRESS RELIEF
AS PER CODE
N7
50
SPARE
46
47
BUFFING
OTHER
NA
NA
N6
N5
50
50
1
1
SPARE
DRAIN
48
NOTES :
N4
25
SAMPLING POINT
49
N3
500
MANHOLE
51
finalization.
N2
50
N1
NOZZ. NO.
HOLD
SIZE
1
QTY.
AMMONIA INLET
SERVICE
52
53
NOZZLE SCHEDULE
54
REV NO.
PPD. BY/DATE :
CKD. BY/DATE :
R0
CLIENT
CKD. BY:Sd/-VAK
DATE :18.06.07
TCE-4246A
R0
ENQ.SPEC.NO.
SECTION : D
DATA SHEET A
TCE.4246-CH-K-PDS-001
SHEET :
2. NUMBER REQUIRED :
OF 6
2 NOS (1W+1S)
WATER
5. OPERATION :
32
INTERMITTENT
~ 1 1/2 hrs. for loading 10
MT Bullet
6. TYPE OF DRIVE : FLAMEPRROF
ELECTRIC MOTOR
7. APPLICABLE STANDARDS : API 618/
API 619
8.
9.
TEMPERATURE : ** 37
GENERAL
4. LOCATION : OUTDOOR
AT INLET : ** 2.5
Kg/ cm 2 (g)
Kg/ cm 2
* SPLASH/ PRESSURISED
HORIZONTAL
NON-LUBRICATED
SPEED
27. METHOD OF CAPACITY CONTROL AT
28.
29.
MAXIMUM :
(-) 33 / 55
DESIGN DATA
ISSUE NO. R5
SWITCHES : *
REV.NO.
JOB NO.
DATE
TCE.
REV. BY
DATE : 29.06.07
4246 A
Kg/ cm 2
(a) LOAD : *
(b) UNLOAD : *
Kg/ cm 2 (g)
Kg/ cm 2 (g)
PROJECT: NZOSP
TCE FORM NO. 330 R1
ENQ.SPEC.NO.
(b) STOP : *
~2
~1
Kg/ cm (g)
Kg/ cm (g)
Kg/ cm 2 (g)
* CI
Kg/ cm (g)
MATERIALS OF CONSTRUCTION
FOR RECIPROCATING COMPRESSORS
OF 6
SHEET : 2
FORGED STEEL
43. DIFFUSER : CI ASTM A 536,GR 60-4018/ CAST ALUMINIUM ASTM B 26, ALLOY
355.0 /
REV.NO.
JOB NO.
DATE
TCE.
REV. BY
DATE : 29.06.07
4246 A
SECTION : D
DATA SHEET A
TCE. 4246-CH-K-PDS-001
MATERIALS OF CONST.
FOR CENTRIFUGAL
COMPRESSORS
ISSUE NO. R5
PROJECT NZOSP
TCE FORM NO. 330 R1
ENQ.SPEC.NO.
TCE. 4246A-CH-K-PDS001
SECTION : D
DATA SHEET A
SHEET :
3 OF 6
AFTER-COOLERS FOR
YES
LATER
INTER-COOLERS / AFTER-COOLERS / OIL-COOLERS
DESIGN DATA
COMPRESSOR ACCESSORIES
ISSUE NO. R5
73. CAPACITY OF :
M3 / Hr
73.1 INTER-COOLERS : *
M3 / Hr
73.2 AFTER-COOLERS : *
Kg/ cm 2 (g)
Kg/ cm 2 (g)
61.
Kg/ cm 2(g)
Kg/ cm 2(g)
62.
GAS TEMPERATURE : *
63.
64.
65.
66.
67.
AND TEMA
68.
REV.NO.
JOB NO.
DATE
TCE.
REV. BY
DATE : 29.06.07
4246a
* mm
PROJECT: NZOSP
SHEET :
OF 6
82. SHELL : *
83. TUBES : *
ENDS
86.
87. MOISTURE AND OIL SEPARATOR
WITH AUTO DRAIN TRAP TO BE
PROVIDED WITH EACH INTERCOOLER AND AFTER-COOLER TO
DISCHARGE MOISTURE AND OIL TO
DRAIN
Kg/ cm 2 (g)
95. DESIGN PRESSURE : *
Kg/ cm 2 (g)
C
3
98. DIMENSIONS :
98.1 HEIGHT TAN TO TAN : *
98.2 DIAMETER : *
mm
mm
SEPARATOR : CENTRIFUGAL/
100. CORROSION ALLOWANCE :
IS 2002/ IS 2062
BITUMINOUS /
103. INSULATION :
89.2 TRIM :
NO
104.
CS
88.2
89.1 BODY :
1.6 mm
CI IS 210/ SS
RECEIVER
ACCESSORIES
INTER-COOLERS/AFTERCOOLERS/
OIL-COOLERS M O C
SECTION : D
DATA SHEET A
TCE4246-CH-K-PDS-001
ISSUE NO. R5
REQUIRED :
YES
YES
107.
108.
SS/
REV.NO.
JOB NO.
DATE
CHD. BY:VAK
TCE.
REV. BY
DATE : 29.06.07
4246 A
PROJECT: NZOSP
ENQ.SPEC.NO.
MISCELLANEOUS
YES
YES
OF 6
YES
114.
115. PRIMER : RED OXIDE/ EPOXY
115.1 NUMBER OF COATS :
115.2 DRY FILM THICKNESS :
116. FINISH PAINT : SYNTHETIC ENAMEL/
EPOXY/
SHEET :
(NOTE 2)
YES
128.
129.
TCE.M4-203-02
118. TURBINE : TCE.M4-133-01/ 04 /
PERFORMANCE GUARANTEES
PAINTING
SECTION : D
DATA SHEET A
TCE. 4246-CH-K-PDS-001
COMPANION SPECIFICATIONS
ISSUE NO. R5
(+)
M3/Hr
( )
( )
KW
JOB NO.
DATE
TCE.
REV. BY
DATE : 29.06.07
4246 A
( )
PROJECT: NZOSP.
TCE FORM NO. 330 R1
ENQ.SPEC.NO.
DATA SHEET A
6 OF 6
TEMPERARURE : 37
0.25
SECTION : D
SHEET :
Kg/ cm (g)
137.
138.
COST LOADING
AND PENALTY
PERFORMNCE
GUARANTEES (CONTD.)
TCE. 4246-CH-K-PDS-001
Rs. *
/ KW
Rs. *
141.
142.
143. BEARINGS
LIST OF SUB-VENDORS FOR BOUGHT-OUT AND
CRITICAL ITEMS
ISSUE NO. R5
TCE.M4-107-01
144. MOTORS
145. TURBINE
146. ENGINE
147. COUPLINGS
148. V- BELTS
149. VALVES & SPECIALITIES
150. AUTO DRAIN TRAPS
151. VIBRATION DAMPENING PADS
152. CONTROL PANEL AND INSTRUMENTS : REFER
153. MCC
154.
155.
156.
NOTES
1.
FOR COMPRESSORS UPTO MOTOR RATING OF 7.5 KW, BIDDER MAY OFFER AIR COOLED
COMPRESSOR AS AN ALTERNATIVE TO WATER COOLED COMPRESSOR.
FOLLOWING ADDITIONAL TESTS INDICATED AS B IN TCE.M4-186-01,02, 04, 05, 06, 08, 09, 12
AND 26 SHALL ALSO BE CARRIED OUT WHEN TCE.M4-186-01, 02, 04, 05, 06, 08, 09, 12 AND 26
ARE APPLICABLE
3.. * DENOTES BIDDER TO SPECIFY / CONFIRM.
2.
4. BASIS FOR SIZING : 10 MT LIQUID AMMONIA BULLET TO BE LOADED IN 1-1.5 HOURS. TIME
INCLUDES THE VAPOR RECOVERY FROM ROAD TANKER.
5. ** TO BE CONFIRMED DURING DETAILED ENGG..
6. MOTOR SHALL BE FLAME POOF TEFC , CONFORMING TO GAS GROUP IIA/B, IS 2148, IP
55,CLASS F.
REV.NO.
JOB NO.
DATE
TCE.
REV. BY
DATE :
4246 A
PROJECT: NZOSP
TCE FORM NO. 330 R1
SPECIFICATION NO.
TCE-4246A-C-300-005
SECTION D
SHEET 1 OF 1
Make
Bidder to state
Input signal
Output signal
4-20 mA DC
No. of outputs
2 nos.
Quantity
Mounting
Power Supply
24 V DC
Type of isolation
Accuracy
Stability
REV.
NO.
DATE
REV. BY
P0
PPD. BY:DMG
CKD. BY:SPA
DATE:
17.12.07
JOB
NO.
TCE
4246A
SPEC NO.
TCE-4246A-C-300-005
SECTION : CONTENTS
SHEET 1 OF 3
CONTENTS
SECTION C
(TECHNICAL SPECIFICATIONS)
SECTION
SPECIFICATION
NO.
ISSUE
NO.
TITLE
NO OF
PAGES
C1
TCE-4246A-C300-005
R1
C2
TEC-4246A-950
R1
C3
TCE-4246A-951
R0
C4
TCE.4246A
952
RO
C5
TCE-4246A-C300-005
R1
11
12
C6
TCE-4246A-C300-05
R1
C6
TCE-4246A-CHT-PDS-322T441
R1
C6
TCE-4246A-CHT-PDS-322T442
R1
C6
TCE-4246A-CHT-PDS-322T445
R0
C6
TCE-4246A-CHSM-PDS322SM101
R0
C6
TCE-4246A-CHX-PDS-001
P0
C6
TCE.4246A-CHK-PDS-001
R5
C6
TCE.M4-604-09
R4
C6
TCE.4246A-109TI-04
R0
TCE.M4-601-06
R4
DATASHEET-DIFFERENTIAL PRESSURE
TRANSMITTERS
C6
TCE.4246A-C300-005
R0
C6
TCE.4246A-C300-005
R0
C6
TCE.M4-109UCP-54
R1
C6
1
6
3
2
1
2
ISSUE
R0
SPEC NO.
TCE-4246A-C-300-005
SECTION : CONTENTS
SHEET 2 OF 3
CONTENTS
SECTION C
(TECHNICAL SPECIFICATIONS)
SECTION
SPECIFICATION
NO.
ISSUE
NO.
TITLE
NO OF
PAGES
C6
TCE.M4-607-05
R2
DATASHEET-PRESSURE/VACUUM RELIEF
C6
TCE.M4-109-CV
R0
DATASHEET-CONTROL VALVES
MECHANICAL
C7
TCE.M4-107-01
R6
10
C7
TCE-4246A-300LS-001
R2
18
C7
TCE-4246A-C300-002
R0
C7
TCE-M4-102-01
R3
10
C7
TCE-M4-102-43
R3
EARTHING CLEAT
C7
TCE-M4-102-34
R3
TCE-M4-103-99
R3
C7
C8
PAINTING SPECIFICATION
R8
INDUCTION MOTOR
TCE.M4-208-01
R7
CABLES
TCE-M4-208-11
R3
C9
R1
23
TCE.M4-134-06
R1
13
TCE.M4-185-01
R3
TCE.M4-186-01
R2
TCE.M4-186-04
R2
TCE.M4-186-05
R2
TCE.M4-186-08
R2
ISSUE
R0
SPEC NO.
TCE-4246A-C-300-005
SECTION : CONTENTS
SHEET 3 OF 3
CONTENTS
SECTION C
(TECHNICAL SPECIFICATIONS)
SECTION
SPECIFICATION
NO.
ISSUE
NO.
TITLE
GENERAL
TERMS,
REQUIREMENTS
C-10
NO OF
PAGES
CONDITIONS
AND
TCE.M4-903
R3
TCE.M4-904
R7
TCE.4246A -905
R1
TCE.M4-906
R6
TCE.M4-907
R5
TCE.M4-908
R4
TCE.M4-914
R5
TCE.M4-915
R4
TCE.M4-916
R4
TCE.M4-917
R0
10
R0
TCE.4246A-322PI-8725
R0
R0
R0
TCE.4246A322-GA-8595
TCE.4246A-322GA-8600
ISSUE
R0
SPEC NO.
TCE- 4246A-C300-005
SECTION: C1
SH 1 OF 1
1.2
1.3
Financial Stability
1.3.1
Turnover :
Average annual financial turnover during last 3 years ending 31st March of the
previous financial year. The contractor shall submit TDS certificates or
audited balance sheets showing receipts from contracts, profit and loss etc in
support of his claim.
ISSUE
R1
SPEC. NO.
SECTION D
DATA SHEET
TCE.4356A-C-300-005
SHEET 1 OF 1
Type
Microprocessor based
Mounting
size
24 mm (H) x 48 mm (W)
Digit height
12 mm
Enclosure Protection
Input
Range
User configurable
Engg. Units
C for temperature
Contact Rating
2A, 230 V AC
Power Supply
24 VDC
Accuracy
Display
Quantity
Tests
DRAWINGS/ DOCUMENTS
1.
Vendor shall submit catalogue & data sheet for review & comments by Purchaser/ Consultant.
2.
TEST CERTIFICATES
1.
Vendor shall submit all routine Test certificates for Purchaser/ Consultants review.
2.
NOTES
1.
REV. NO.
PPD. BY:DMG
JOB NO.
DATE
CKD. BY:SPA
TCE
REV. BY
DATE: 17.12.07
4246A
SPEC NO.
SECTION : C4
TITLE
SHEET 1 OF 2
TCE.4246A - 952
2.
Description
Vendor /
Contractor
Owner
Engineer
Commercial
Ori.+ 1
3 (*)
b)
Technical
Ori. + 1
3 (*)
TCE
Ori.
b)
NFC
Ori.
3 (*)
3.
3 (*)
4.
Ori. + 3
5.
6.
7.
a)
Preliminary
3 (*)
b)
Final
3 (*)
b)
As-Built
R+6
3 (*)
c)
4 (*)
(*)
:
Legend :
OF
SPEC NO.
TITLE
TCE.4246A - 952
SECTION : C4
SHEET 2 OF 2
Postal Address :
Nuclear Fuel Complex
Department of Atomic Energy,
ECIL Post,
Hyderabad 500 062,
Andhra Pradesh, India.
Attn : Mr. B.Laxminarayana
Project Director (NZOSP)
2.
Telephone
Fax
E-mail ID
bln@nfc.ernet.in
Postal Address :
TCE Consulting Engineers Ltd.
Raj Plaza, 2nd Floor,
L. B. S. Marg,
Vikhroli (West),
Mumbai 400 083.
Attn : Mr. V.A.Kunte
Project Manager
Telephone
Fax
E-mail ID
vakunte@tce.co.in
ISSUE
R0
OF
SPEC.NO.
TCE.M4-107-01
SECTION: WRITE-UP
SHEET 1 OF 10
1.0
SCOPE
This specification covers the general design, materials, construction features,
manufacture, shop inspection and testing at manufacturers works, delivery at
site, handling at site, erection, testing, commissioning, performance testing and
handing over of Air / Gas Compressors and Accessories.
2.0
2.1
2.2
The following are some of the important codes and standards relevant to this
specification.
API 617
API 618
API 619
API 672
for
IS 2825
IS 5456
IS 6206
IS 7938
IS 11780
FILENAME : M410701R6.DOC
SPEC.NO.
TCE.M4-107-01
SECTION: WRITE-UP
SHEET 2 OF 10
IS 13124
3.0
3.1
RECIPROCATING COMPRESSORS
3.1.1
Frame
The frame shall be a single casting and robust in construction. It shall be
provided with sufficiently large and easily removable inspection doors so that
the bearings and other parts are readily accessible for checking and
adjustments. Inspection doors shall be dust-proof and oil-tight.
3.1.2 Cylinder
The cylinder shall be made of cast iron or stainless steel or as specified in data
sheet A. The cylinder heads and barrels shall be provided with cooling water
jackets. The design of jackets shall be such that low air discharge temperature
and minimum carbon formation are ensured. The water jackets shall be so
constructed that the flow of water is uniform throughout the cooling surface
and no stagnant water pockets are formed. The walls of the cylinder shall have
sufficient thickness suitable for maximum working pressure and temperature
and shall be suitable for reboring. It shall be provided with liberally sized
valve openings and stream-lined passages. The internal surface of the cylinder
shall be highly polished to reduce wear of the piston rings.
3.1.3 Piston and Piston Rod
The piston shall be of such a design and construction that the piston rings exert
equal pressure at all points of the cylinder bore. The piston rod shall be
designed to take up the full thrust acting on the piston. The piston rings for
non- lubricated type compressor shall be of self lubricating type. Piston speed
shall be maximum 300 M/Min for large capacity compressors and 350 M/Min
for small capacity compressors.
3.1.4 Cross Head
The cross head shall be of solid box type with the faces ground to work closely
with the groove of the guides. The cross head pin shall be case hardened and
ground.
ISSUE
R6
FILENAME : M410701R6.DOC
SPEC.NO.
TCE.M4-107-01
SECTION: WRITE-UP
SHEET 3 OF 10
Frame Lubrication
Frame lubrication for small compressors with motor rating upto 55 kW
shall be of splash type. The pressurised i.e. forced feed system shall be
used for compressors with higher motor rating. In case of force feed
lubrication, the oil pump shall be either driven by crank shaft of the
ISSUE
R6
FILENAME : M410701R6.DOC
SPEC.NO.
TCE.M4-107-01
SECTION: WRITE-UP
SHEET 4 OF 10
compressor or shall be separately driven. The pump shall draw the oil
from the adequately sized oil well.
(b)
Cylinder Lubrication
For lubricated type of compressors, multi plunger pump or metering
pump shall be used for cylinder lubrication. In case of non-lubricated
type air compressors, a wiper ring shall be provided such that the crank
case oil is not carried to the cylinder along with the piston rod.
3.2
CENTRIFUGAL COMPRESSORS
3.2.1 Casing
Casing shall be either horizontally split or vertically split type made of cast
iron for moderate pressure applications, cast steel for high pressure
applications or as specified in data sheet A. The thickness of casing shall be
suitable for maximum working and test pressures and shall have a corrosion
allowance of at least 3 mm.
3.2.2 Impellers
Impellers shall be open, semi-open or closed type consisting of disk, hub and
blades. The blades shall be either radial or backward leaning type only. The
material of construction shall be as specified in data sheet A. The design shall
be such as to produce low operating stress levels giving high mechanical
integrity.
3.2.3 Gears
The gears shall be of high speed precision helical type designed as per AGMA
standards. The bull gear shall be directly connected to the driver by a low
speed coupling. The bull gear may be integrally forged with its shaft. In case
bull gear is forged separately, same shall be assembled with an interference fit
on its shaft. The pinion shall be integrally forged with its shaft. It shall be
hardened and precision ground to AGMA 13 quality of AGMA 2000-A88 for
longer life.
3.2.4 Bearings and Seals
The bearings used for pinion and impeller shall be such that high stability and
low vibrations are achieved. Tapered - land thrust bearings shall be provided
for rotor assembly. Bearing shoes shall be pressure lubricated and steel
babbited. Bearings shall be comparatively insensitive to load changes and
ISSUE
R6
FILENAME : M410701R6.DOC
SPEC.NO.
TCE.M4-107-01
SECTION: WRITE-UP
SHEET 5 OF 10
variations in oil supply pressure. Hydrostatic squeeze film bearings are also
acceptable. The bull gear shall be supported by horizontally split sleeve journal
bearings and thrust shall be absorbed in either direction by thrust bearings. To
prevent any oil vapour contamination and to ensure oil-free air, mechanical
type air and oil seals shall be provided on the pinion shaft.
3.2.5 Rotor Assembly
Rotor assembly shall consist of pinion shaft to which impellers are attached.
The shaft shall be of forged carbon steel or stainless steel or as specified in
data sheet A. A thrust collar shall be provided on pinion shaft.
3.3
SCREW COMPRESSORS
3.3.1 Casing
Casing shall be of barrel type made of cast iron or fabricated steel for moderate
pressure applications, cast steel or stainless steel for high pressure applications
or as specified in data sheet A. For water injected applications the casing shall
be of stainless steel or as specified in data sheet A. Casing shall have built-in
air passages either as cast or machined.
3.3.2 Rotors
Rotors shall be of asymmetric profile. The material of construction of rotors
shall be as specified in data sheet A. The rotors shall be dynamically balanced
before and after mounting timing gears and thrust collars. The rotors shall be
ultrasonically tested. For non-lubricated screw compressors rotors shall be
lined with PTFE.
3.3.3 Gears
Gear pair shall be used to step up speed of the compressor. Helical gear
hardened to minimum 55 RC shall be used. Gear shall be shrink fit on drive
shaft and shall mesh with pinion mounted on extended portion of male rotor.
Gears shall be designed as per AGMA standards.
3.3.4 Bearings
The rotors shall be carried in heavy duty ball and roller bearings to take radial
and axial loads or journal bearings with thin babbitt metal lining.
ISSUE
R6
FILENAME : M410701R6.DOC
SPEC.NO.
TCE.M4-107-01
SECTION: WRITE-UP
SHEET 6 OF 10
ACCESSORIES
Accessories such as intake filter, silencer, inter-coolers, after -coolers, oilcoolers, receivers, control cabinet etc. shall be supplied to make the system
complete in all respects.
4.1
INTAKE FILTER
The intake filter shall be generally as per IS 6206. The type of intake filter
shall be as specified in data sheet A. The filter shall be designed to retain
particles of one (1) micron and above with ninety-seven (97) percent
efficiency. In case of cloth filter, the filter element may be of nylon,
polypropylene or woollen cloth attached to the wire netting.
4.2
INTER-COOLERS
For multi stage compressors, inter-coolers shall be provided. These shall be of
shell and tube type, with removable tube bundles. The tubes shall have
sufficient thickness to withstand the operating pressure and shall be carefully
expanded into the tube sheets. Capacity of inter-coolers shall be twenty (20)
percent more than the compressor capacity or as specified in data sheet A.
Design pressure shall be twenty-five (25) percent more than the working
pressure or as specified in data sheet A. The material of construction and
design shall be as specified in data sheet A.
4.3
4.4
RECEIVERS
Receivers shall generally conform to IS 7938. Receivers shall be provided with
two (2) suitably sized safety valves to relieve the full compressor discharge
capacity individually and shall be set at a pressure 1.25 times the operating
ISSUE
R6
FILENAME : M410701R6.DOC
SPEC.NO.
TCE.M4-107-01
SECTION: WRITE-UP
SHEET 7 OF 10
MOTOR RATING
Motor shall be of suitable rating considering compressor power requirements.
Motor rating shall be calculated as follows :
(a)
SKW
t
(b)
SKW
t
Where,
SKW = Shaft Power at selected speed in KW
t = Efficiency of transmission
6.0
CAPACITY CONTROL
Capacity control shall be achieved either by speed variation or at constant
speed as specified in data sheet A. In case where capacity control is to be
achieved at constant speed, following methods are generally available. Data
sheet A shall be referred for method to be actually employed.
(a)
(b)
(c)
(d)
(e)
(f)
(g)
6.1
6.1.1 The dual type control system shall permit operation of each compressor in
either of the following two regulations:
ISSUE
R6
FILENAME : M410701R6.DOC
SPEC.NO.
TCE.M4-107-01
SECTION: WRITE-UP
SHEET 8 OF 10
(a)
(b)
6.1.2 Under continuous Run-Load-Unload Regulation, the drive motor shall run
continuously while the compressor shall be loaded at pre-set (adjustable) cut-in
pressure as the receiver pressure falls and unloaded at a higher pre-set
(adjustable) cut-out pressure, as the receiver pressure rises. With automatic
Start-Stop Regulation, the drive motor shall automatically start at pre-set
(adjustable) cut-in pressure as the receiver pressure falls and automatically stop
at a pre-set (adjustable) higher cut-out pressure as the receiver pressure rises.
6.1.3 With either system, the compressor shall always be unloaded when the drive
motor starts. The unloaders shall keep the compressor unloaded till the drive
motor comes to full speed.
6.1.4 Each compressor shall be provided with one selector switch having three
positions marked AUTO-OFF-ON for the following functions:
(a)
(b)
OFF AUTO -
(c)
ON
SPEC.NO.
TCE.M4-107-01
SECTION: WRITE-UP
SHEET 9 OF 10
Two pressure switches shall be provided to monitor receiver pressure for each
compressor, one for load-unload control and the other for start-stop control
considering two (2) steps regulation for load-unload mode. In case number of
steps are more as indicated in data sheet A, number of pressure switches
provided shall be sufficient to meet the requirement.
6.3
Pressure switches with alarm initiating contacts shall be provided for the
receiver high and low pressures.
6.4
The dual control units shall be complete with pressure switches, solenoid
valves, control air tubing, air filter (if required) and other accessories as
required for the afore-mentioned operations.
6.5
6.6
One potential free contact shall be made available for each compressor for
remote alarm under trip condition and a common contact for compressor auto
start.
ISSUE
R6
FILENAME : M410701R6.DOC
SPEC.NO.
TCE.M4-107-01
SECTION: WRITE-UP
SHEET 10 OF 10
6.7
Green and red lamps shall be provided to indicate motor running and stop
conditions respectively.
6.8
Motors shall be provided with motor winding over-heat sensors and bearing
temperature sensors for alarm indication and to trip the motor.
6.9
For compressors driven with turbine, the required turbine control and
instrumentation shall be provided.
6.10
7.0
7.1
7.2
The overall vibration level shall be as per zones A and B of ISO 10816-1.
Vibration dampening pads if required, shall be provided.
8.0
PERFORMANCE GUARANTEES
Performance parameters to be guaranteed by the CONTRACTOR and
tolerances permitted shall be as indicated in section C and / or data sheet A.
BIDDER shall confirm acceptance of these by indicating values in data sheet
B. Compressor or any portion thereof is liable for rejection, if it fails to give
any of the guaranteed performance parameters.
ISSUE
R6
FILENAME : M410701R6.DOC
SPEC.NO.
TCE.M4-107-01
SECTION: WRITE-UP
SHEET 1 OF 2
DATA SHEET C
DATA TO BE FURNISHED BY THE CONTRACTOR AFTER THE
AWARD OF CONTRACT
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
ISSUE
R4
FILENAME : M410701R6.DOC
SPEC.NO.
TCE.M4-107-01
SECTION: WRITE-UP
SHEET 2 OF 2
12.
13.
14.
15.
16.
17.
Overall foundation plan, base frame drawing for each equipment, static and
dynamic loads on each of the anchor bolts and dimensional details of pockets
and anchor bolts
18.
Motor drawings
19.
20.
21.
22.
23.
ISSUE
R4
FILENAME : M410701R6.DOC
R0 2002-09-30
TCE.M4-CH-X-PDS-440
FILENAME : PDS440.DOC
SECTION
1.
2.
3.
4.
5.
6.
7.
8.
9.
OUTDOOR / INDOOR
INTERMIT. / CONT.
12hr/day
PHYSICAL PROPERTIES
1
1
FLUID NAME
Ammonia
PHASE :
GAS/LIQ./SOLID
13.
DENSITY
15.
16.
17.
MODEL NO.
LOCATION
DUTY
12.
14.
322-SM-101 A/B
02 Nos.
Liquid. Ammonia & DM Water
SERVICE
DESIGN CODE
BIDDER / VENDOR
10.
11.
CONSTRUCTION DATA
TATA CONSULTING ENGINEER
GENERAL
ITEM TAG NO.
QUANTITY
1
4
1
6
DM water
Liquid
Liquid
580
1000
cP
&%
NA
NA
kg/m3
VISCOSITY
P
SOLIDS : SIZE
P
LIQ. NH3
CS
FLANGES
CS
370
CS
12.7
2.5
GASKETS
AMB
AMB
SUPPORTS
21.
kg/cm2
NOZZLES
22.
kg/cm2
JACKET
23.
DEGREE OF HOMOGENEITY
100
COMPOSITION /
TEMPERATURE /
DENSITY
BLENDING /
SUSPENDING SOLIDS/
DISSOLVING / HEAT
TRANSFER/GAS DISP.
ACCESSORIES BY VENDOR
30.
LIFTING LUGS
COMPANION FLANGES,
NUTS,BOLTS & GASKETS
EARTHING BOSS
31.
INSULATION
32.
29.
REFER NOTE 5
TEMPERATURE,0C
28.
mm
CLADDING / LINING
PRESSURE, kg/cm2g
27.
3 mm
INTERNALS
20.
26.
kg/cm2(g)
DM Water
200
PURPOSE OF MIXING
kg/cm2(g)
19.
25.
HORIZONTAL/VERTICAL
YES / NO
0
0C
C
kg/cm2(g)
kg/cm2(g)
HOUSING
FLOWRATE, kg/hr
mm
mm
mm
FIXED / REMOVABLE
MATERIAL OF CONSTRUCTION
18.
24.
PERFORMANCE DATA
FLUID NAME
SHEET 1 OF 1
REV.
NO.
YES / NO
AS PER PIPING SPEC. /
NA
YES / NO
YES / NO
SIZE
NB
RATING
#
FACING
FINISH
INLET
40
OUTLET
40
SIDE NOZZLE
40
JACKET INLET
JACKET OUTLET
VENT
DRAIN
33.
1) EMPTY
kgs.
HYDROTEST
34.
2) OPERATING
kgs.
HOMOGENEITY TEST
YES / NO
35.
3) FULL OF WATER
kgs.
YES / NO
YES / NO
NA
36.
37.
38.
39.
4
0
40.
41.
42.
43.
44.
45.
YES / NO
mm * mm * mm
REV. NO
PPD.BY:
SPP
PPD. BY
/ DATE
CKD.BY
/ DATE
CKDBY:
VAK
TCE-4246A
DATE:
R0
SPEC NO.
SECTION : C2
SHEET 1 OF 3
TITLE
TCE.4246A - 950
1.
Owner / Purchaser
2.
Consultant / Engineer
3.
Project Title
4.
Location
5.
Altitude
6.0
Transport
6.1
Railway
Nearest Railway Station
6.2
Road
6.3
Air Port
Madurai
6.4
Sea Port
Tuticorin
7.0
Ambient Air
Temperatures
c) Average Minimum
24.5 Deg. C
d) Average Maximum
32.3 Deg. C
26.5 Deg. C
8.0
Design Ambient
Temperature for
electrical equipment
45 Deg. C
21.01.2005
ISSUE
R2
SPEC NO.
SECTION : C2
SHEET 2 OF 3
TITLE
TCE.4246A - 950
9.0
Rainfall
a) Annual Average
500 mm
909 mm
c) Maximum Intensity
149.1 mm / hr
d) Design Intensity
75 mm / hr.
e) Period of rainfall
10.0
Relative Humidity
a) Maximum
80 %
b) Minimum
40 %
c) Average
60 %
11.0
Wind Data
b) Wind Direction
12.0
Seismic Data
a) Zone
13.0
Climate
14.0
Longitude
780 7 E (approx.)
15.0
Latitude
80 42 N (approx.)
21.01.2005
ISSUE
R2
SPEC NO.
SECTION : C2
SHEET 3 OF 3
TITLE
TCE.4246A - 950
PHONE (O)
04630-276200
TELEFAX
04630- 276111
21.01.2005
ISSUE
R2
SPEC NO.
SECTION: C3
TITLE
TCE-4246A - 951
SHEET 1 OF 2
1.0
1.1
1.2
1.3
415 V DG Supply
1.4
1.5
2.0
2.1
2.2
Control Supply
230 V , 1-phase, AC
3.0
3.1
AC SUPPLY
VOLTAGE VARIATION:
FREQUENCY VARIATION
(+) / (-) 5%
ISSUE
R0
PROJECT INFORMATION-ELECTRICAL.doc21.12.2004
OF
SPEC NO.
SECTION: C3
TITLE
TCE-4246A - 951
3.2
4.0
SHEET 2 OF 2
ISSUE
R0
PROJECT INFORMATION-ELECTRICAL.doc21.12.2004
OF
SPEC NO.
SECTION: C5
SH. 1 OF 11
1. SCOPE
1.1
1.1.1
SR.
No.
Equipment
Quantity
SOLUTION
Details
Liquid
Storage
Bullets
Ammonia
vessels
/ 02 Nos.
Detailed scope &
specifications are
given in section C6
Technical
Specifications
of
Liquid Ammonia &
35%
Ammonium
Hydroxide solution
Storage & Transfer
System
35%
Ammonium
Hydroxide
solution 02 Nos.
Storage vessels/Bullets
Online Mixer
02 Nos.
Instrumentation
Electrical
Detailed
scope
As per battery limits given in Specific
shown in TCE.4246A- Electrical
322-PI-8725 R0 issue requirements
of
section C-6
1 No.
ISSUE
R1
TCE FORM 329 R3
SPEC NO.
SECTION: C5
SH. 2 OF 11
1.2
1.3
It is not the intent to specify completely herein all details of design and
construction of equipment or materials to be supplied or of services to be
rendered. However, the equipment, materials and services shall conform in
all respects to high standards of engineering design, workmanship and be
capable of performing in continuous commercial operation in a manner
acceptable to PURCHASER who will interpret the meaning of drawings and
specifications and shall have the power to reject any work or materials which
in his judgement are not in full accordance therewith.
1.4
The scope of work under this contract shall also cover following :
a) Supply of equipment and accessories as specified.
b) Unloading, Safe storage of equipment supplied by CONTRACTOR &
Unloading & Safe Storage of equipment and free-issue items
wherever required, supplied by PURCHASER.
c) Taking over the equipment from PURCHASER'S storage / unloading
area for equipment and free-issue items supplied by PURCHASER.
d) Transfer of material / equipment to CONTRACTOR'S storage area.
e) Maintaining equipment during storage and installation in safe custody.
f)
i)
SPEC NO.
SECTION: C5
SH. 3 OF 11
2. INSTRUCTION TO BIDDERS
2.1
2.2
Bidder shall ensure that the bids are complete & are prepared in the specified
form. Incomplete bids are liable for rejection. Deviation, if any, shall be listed
in Section-D; Schedule of Deviations (from Technical Specifications &
General conditions). Except for these deviations, it is assumed that BIDDER
shall comply with all requirements of the specifications. Any deviation sought
at later date will not be entertained.
2.3
While quoting the prices, BIDDER shall quote separately for supply including
all taxes, duties & levies considered and separately for erection, testing &
commissioning including all taxes, duties & levies considered.
2.4
Bidder shall quote firm price which will be kept firm throughout the duration of
the contract.
2.5
2.6
2.7
PURCHASER can add / delete items included in scope of work. Unit rates for
different items shall prevail under such eventuality.
2.8
Bidder may provide a separate addendum to our price schedule format and
submit the unpriced format of the addendum with the technical bid (SectionD) and priced portion of the addendum with the priced bid (Section-E).
Description of items offered against such additional unit rates considered by
ISSUE
R1
TCE FORM 329 R3
SPEC NO.
SECTION: C5
SH. 4 OF 11
2.9
PURCHASERS RIGHT:
The PURCHASER does not bind himself to accept the lowest or any Bid and
reserves the right to accept or reject any Bid or a portion thereof without
assigning any reason thereof.
2.10
ACKNOWLEDGEMENT OF ENQUIRY:
BIDDER shall acknowledge the receipt of enquiry and within two (2) days
advise whether he will be quoting or not. If the BIDDER is not quoting, all
enclosures to this enquiry must be returned promptly to the issuing authority
with REGRET letter. All specifications and documents enclosed are
PURCHASERs property and are to be used only for the purpose of this
enquiry and any order which may result from it.
2.11
DELIVERY:
Tenderers should note that no tender will be considered by Purchaser unless
the Tenderer can meet the delivery schedule specified by the Purchaser. All
equipments / machinery / plant / components covered by this tender
document should be supplied on or before 24 Weeks or as specified in the
tender document from the date of receipt of LOI. The prices quoted by the
tenderer should include all charges involved for direct and safe delivery of the
items by Road to the Project site of the Purchaser. If a tenderer so desires,
separate lumpsum charges for transportation and safe delivery to the
Purchasers site at Palayakayal could be furnished. Purchaser will neither
undertake responsibility for transit insurance nor pay for it separately. No
other, delivery term will be accepted by the Purchaser. The installation and
commissioning of the Liquid Ammonia & 35% Ammonium Hydroxide solution
Storage & Transfer System shall be carried out within 8 weeks from the date
of intimation of site readiness. The vendor will depute personnel to site and
carry out joint inspection of site to confirm site readiness.
ISSUE
R1
TCE FORM 329 R3
SPEC NO.
SECTION: C5
SH. 5 OF 11
2.12
3. GENERAL REQUIREMENTS
3.1
The following definitions shall cover the scope of work and as such the
quoted prices shall be based on the same considerations. Payment claims
arising out of wrong understanding shall not be entertained or paid for.
3.1.1
3.1.1.1
SUPPLY:
This shall include supply of equipment including packing / forwarding,
transport and insurance charges complete with all fittings and accessories
which form integral part of the equipment for installation purpose to ensure
satisfactory commercial operation and timely delivery of the equipment to site.
The place of supply shall be Zirconium Complex at Palayakayal near
Tuticorin, Tamilnadu. Manufacturing, inspection & Testing at vendor's / subvendors works of equipment, accessories and items, shall conform to
relevant standards and meet statutory approvals.
ISSUE
R1
TCE FORM 329 R3
SPEC NO.
SECTION: C5
SH. 6 OF 11
3.1.1.2
b)
c)
d)
e)
3.2
ISSUE
R1
TCE FORM 329 R3
SPEC NO.
SECTION: C5
SH. 7 OF 11
3.3
DRAWINGS:
3.3.1
3.3.2
The drawings attached with this specification, are for the general guidance of
the BIDDER. The CONSULTANT / PURCHASER may also issue further
drawings and sketches if considered necessary during execution of the work.
3.4
3.4.1
3.4.2
The PURCHASER may ask for such additional tests on site, as in his opinion
are necessary to determine that the work comply with the specifications, of
manufacturer's instruction or IS code of Installation. The CONTRACTOR
shall be responsible and bear the cost of such additional tests.
3.4.3
3.4.4
Typical type tests certificate for all equipment of equivalent ratings shall be
submitted for scrutiny / approval by PURCHASER / CONSULTANT.
3.4.5
3.4.6
All instruments and accessories required for testing and commissioning of the
items specified shall be provided by the CONTRACTOR at no extra cost for
the duration of Performance Test.
3.4.7
All instruments used for Testing and Commissioning shall have valid
calibration certificates, traceable to National / International Standards of
repute.
3.4.8
3.5
MAINTENANCE REQUIREMENTS:
3.5.1
SPEC NO.
SECTION: C5
SH. 8 OF 11
3.5.2
The BIDDER shall furnish one complete set of any special maintenance tools
required for normal maintenance of equipment. The prices for the same shall
be indicated in Section-E Format for Submissions of Part-II.
3.5.3
The BIDDER shall confirm that space shown for the equipment is adequate
from point of view of access, easy maintenance and for day to day operation.
3.5.4
3.6
INSTALLATION SCHEDULE:
3.6.1
The PURCHASER requires that the CONTRACTOR shall follow schedule for
installation, testing and commissioning of the equipment under the scope of
this specification which will enable the PURCHASER to commission the
project in time.
3.6.2
3.6.3
3.6.4
3.6.5
3.7
SITE FACILITIES:
3.7.1
This section details various Site facilities as may be required for execution of
Work under this Contract, their availability and relevant terms and conditions
where applicable.
3.7.2
The following facilities will be provided by the OWNER in good faith at terms
indicated hereunder. No claims, whatsoever, arising out of use, misuse or
the
ISSUE
R1
TCE FORM 329 R3
SPEC NO.
SECTION: C5
SH. 9 OF 11
d) The contractor shall pay the charges based on his power consumption at
the rate of Rs. 7.00 per unit (kWh).
3.7.2.3
SPEC NO.
SECTION: C5
SH. 10 OF 11
3.7.3
Site shall be handed over to the OWNER in a clean and tidy conditions on
completion of Work or as instructed by the OWNER /ENGINEER.
3.7.4
The OWNER will not provide the following facilities and it is the responsibility
of the CONTRACTOR to make suitable arrangements for the same.
(a) The CONTRACTOR shall use his own portable compressors, pumps,
temporary piping and accessories as required for cleaning, testing,
flushing etc.
(b) No space will be available from the OWNER to accommodate the
CONTRACTORs workmen and supervisory personnel. Necessary
residential accommodation, for the same shall have to be arranged by the
CONTRACTOR at his own cost.
ISSUE
R1
TCE FORM 329 R3
SPEC NO.
SECTION: C5
SH. 11 OF 11
ISSUE
R1
TCE FORM 329 R3
1.1.
SECTION: C6
EQUIPMENT,
SYSTEM
AND
SERVICES
TO
BE
SHEET 1 OF 12
PROVIDED
BY
CONTRACTOR
1.2.
1.3.
The Bidder scope also includes the following for Liquid Ammonia and
Ammonium Hydroxide Solution Storage and Transfer
1.5.
All foundation bolts, nuts, washers, base plates, for all the equipment /
system. Foundation bolts shall be in SS material.
1.6.
ISSUE
R1
FILE NAME: F120R1
1.7.
SECTION: C6
SHEET 2 OF 12
Supply and erection of all the above equipment / system, supply and erection
of auxiliary steel & supporting steel for supporting the equipment / system.
Painting of all the equipment, supports etc.
1.8.
1.9.
1.10. The Layout for Liquid ammonia storage vessels / bullets shall be approved by
CCoE.
1.11. Supports, platforms, ladders: All the equipment shall be properly supported
and shall be easily accessible for maintenance. Platforms and safe access
ladders to be provided at various locations based on the height of the
equipment as per the requirement.
1.11.1. Design & supply of structural supports for the equipment is in vendor scope
of work. The load details for the structures & equipment shall be provided
by vendor and the specification shall be strictly as per the IS standards.
1.11.2. Fabrication, supply and erection of support structures are in the scope of
the vendor.
1.11.3. Grouting of the equipment etc. and Minor civil works during the erection of
the equipment and supplies are in the vendors scope.
1.12. SERVICES BY OTHERS
1.12.1. All piping utilities such as cooling water and instrument air up to battery limit.
1.12.2. Instrument air @ 6.0 kg/cm , g pressure and (+) 5.0C dew point shall be
made available at the Battery limits.
1.12.3. Cooling water @ inlet temperature of 32C & with acceptable temperature
rise of 5C shall be made available at battery limit.
ISSUE
R1
FILE NAME: F120R1
2.0
SECTION: C6
SHEET 3 OF 12
2.1
2.2
2.3
The DM water from the DM water storage tank is pumped and is online mixed
with liquid Ammonia. This is an exothermic reaction, so heat is being
generated. This heat is removed by means of cooling water in the double
pipe heat exchanger i.e. Ammonia Dissolver 322-R-441 A/B where cooling
water is used to remove the heat of mixing from Ammonium Hydroxide
solution. Cooling water is introduced in the counter current direction in the
Ammonia dissolver. Ammonium hydroxide solution is thus cooled and is
stored into the Ammonium Hydroxide solution Storage Vessels (bullets).
2.4
ISSUE
R1
FILE NAME: F120R1
3.0
SECTION: C6
SHEET 4 OF 12
3.1
SCOPE
3.1.1
3.1.4.1
3.1.4.2
3.1.4.3
Vendor shall wire all the signals from instruments provided for Ammonia
compressor up to local panel for operation and monitoring. Further
cabling from the Local Control Panel (LCP) to OPF marshalling cabinet in
OPF control room is not in the vendors scope.
3.1.4.4
3.1.4.5
ISSUE
R1
FILE NAME: F120R1
3.1.4.6
SECTION: C6
SHEET 5 OF 12
3.1.4.7
All Analog signals shall be multiplied in the LCP using signal multipliers.
One output of the multiplier shall be wired to the Digital panel meter while
another output shall be wired up to local control panel with terminal block
and further cabling from local control panel to OPF marshalling cabinet is
not in vendors scope. This will facilitate the remote operation from the
PLC panel.
3.1.2
3.1.2.1
3.1.4.1
Supply and termination of cables for all field instruments in the Ammonia
ISSUE
R1
FILE NAME: F120R1
SECTION: C6
SHEET 6 OF 12
the Local Control Panel (LCP) is also in the vendors scope. Two nos. of
junction boxes shall be supplied as free issue item by NFC (Refer 1.1.3).
3.1.4.4
All Analog signals shall be multiplied in the LCP using signal multipliers.
One output of the multiplier shall be wired to the Digital panel meter while
another output shall be wired up to local control panel with terminal block
and further cabling from local control panel to OPF marshalling cabinet is
not in vendors scope. This will facilitate the remote operation from the
PLC panel. Two no. of junction boxes will be supplied as a FIM to vendor
by NFC.
3.1.4.5
3.1.4.6
3.1.4.7
3.1.3
ISSUE
R1
FILE NAME: F120R1
3.1.4
SECTION: C6
SHEET 7 OF 12
3.1.4.1
3.1.4.2
Cables for instrument power supply (24 VDC) and digital signals (24
VDC)
660V/1100V grade multicore cables, multistranded high conductivity
annealed 1.0 sq.mm (1.5 sq.mm for 230 V AC). Stranded tinned copper
conductor, overall shielded with aluminium mylar tape, 0.5 sq.mm ATC drain
wire shall run continuously in contact with aluminium side of the tape,
extruded PVC insulated, inner sheathed with extruded PVC, with galvanised
steel wire braided, overall sheathed with extruded FRLS PVC confirming to IS
1554, BS:5308 & IEC:189 part II.
3.1.4.3
3.1.5
POWER SUPPLY
All the field instruments shall be suitable for working on 24 VDC. Purchaser
will provide 230 VAC supply at one point in local panel. Further conversion
ISSUE
R1
FILE NAME: F120R1
SECTION: C6
SHEET 8 OF 12
3.2.1
All equipment, systems and works covered under this specification shall
comply with all currently applicable statutes, regulations, standards and
safety codes in the locality where the equipment will be installed.
3.2.2
DIN-43760
IEC-332
IEC 529
IEC 584-2
Thermocouple Tolerances
IEC 751
IEC 801
ISSUE
R1
FILE NAME: F120R1
SECTION: C6
SHEET 9 OF 12
S-7.3
S-75.01
IS:13947.
Part-1
IEC 326.
3.2.3
3.2.4
In the event of any conflict between the codes and standards referred to in
the specification and the requirements of this specification, the more stringent
of these requirements shall govern.
3.2.5
Unless indicated otherwise, all codes and standards referred to in this enquiry
specification shall be understood to be the latest version on the date of offer
made by the Bidder.
ISSUE
R1
FILE NAME: F120R1
SECTION: C6
SHEET 10 OF 12
3.3.0
3.3.1
For all field instruments, material for the wetted parts shall be stainless steel.
3.3.2
3.3.3
3.3.4
All transmitters and gauges shall have at least accuracy of +/- 1.0%.
3.3.5
3.3.6
Separate earth shall be provided for power supply, instrument shielding and
for panel.
3.3.7
3.3.8
The cable glands shall be of double compression type with high quality
neoprene gaskets. Cable glands shall be of brass with nickel plating.
4.1
Drive Motor
2.0
Local Control stations (i.e. Local start / Stop push buttons etc.)
4.0
5.0
ISSUE
R1
FILE NAME: F120R1
SECTION: C6
SHEET 11 OF 12
Electric supply for motors covered under this package shall be 415V, 3
phases, 4 wire. PURCHASER shall make a provision of Motor feeder for
each Compressor motor.
4.2
Induction Motors
4.2.1
Motors shall be provided with enclosures as per data sheet A1.Motors shall
be painted with anti-corrosive epoxy paint. Motors shall conform to the
enclosed specification No. TCE. M4-203-01.
4.3
4.3.1
4.3.2
4.3.3
1.1 KV grade stranded copper conductor of 2.5 sq. mm, PVC insulated,
extruded FRLS PVC inner sheathed, steel wire armoured, FRLS PVC
outer sheathed as per IS : 1554 (Part 1).
4.3.4
Power cable sizing shall be done based on the various derating factors and
site conditions. The voltage drop in the cable at full rated current shall not
exceed 2 % of rated voltage.
4.3.5
The successful Bidders shall submit the cable sizing calculations for review
and approval by the purchaser / consultant along with the details such as
ratings of motors, other electrical load, approximate feeder length etc.
4.3.6
4.3.7
The supply of the cables shall be as per enclosed specification No. TCE.
M4-208-01.
4.3.8
Cable tray shall be of hot dip GI with ladder type for power cables and
perforated for control cables.
ISSUE
R1
FILE NAME: F120R1
4.3.9
SECTION: C6
SHEET 12 OF 12
4.3.10 Termination of incoming 415 V cables for power, at the MCC and shall be
in the scope of PURCHASER.
4.3.11 The supply of the cable tray and accessories shall be as per enclosed
specification No. TCE. M4-208-11.
4.3.12 It shall be in the BIDDERS scope, to supply, install, wire etc. Junction
boxes if required to terminate the control / instrumentation cables. The
junction boxes shall have 20% extra terminals than actual required.
4.3.13 All instruments such as recording and indicating instruments, controller
level switches, pressure switches etc. shall be provided with the suitable
cable glands to suit the selected cable size.
4.3.14 All equipment shall be provided with lugs and cable glands, to suit the
selected cable size. Cable glands shall be of brass metal, double
compression type and lugs shall be of tinned copper type.
4.4 Earthing of equipment
4.4.1
4.4.2
The main earthing grid shall be provided by the PURCHASER, the Bidder
scope include providing earthing conductor from individual equipment
supplied by the BIDDER to main grid.
4.4.3