Sie sind auf Seite 1von 6

Address

Email Address
Tel no./ Cel.no.
Age
Birth Date
Birthplace
Civil Status
Gender

:
:
:
:
:
:
:

OBJECTIVE

Purok Hillside. Sta. Felomina


Iligan City City, 9200 Philippines

patricio.ylanan@gmail.com
09177916050
40 years old
July 17, 1976
Iligan City, Philippines
Married
Male

I am searching for long term employment with a company that will


give me the opportunity to advance my career. I enjoy learning new things
and working with new people that will provide me the opportunity to learn
more about the world and about myself. Im hardworking, dedicated and
continually strive for excellence in everything I do.

POSITION APPLIED:

RIGGING SUPERVISOR

International Construction Industry experience in Oil and Gas Refinery, Power


Plant, Desalination and High Rise buildings

EDUCATIONAL BACKGROUND
COLLEGE
CAPITOL UNIVERSITY

Cagayan de Oro City


Year Graduated

March 31, 1997

A graduate of BS Marine Engineering, holder of Rig Pass Licensed, qualified


and have license in Rigger
Level II Saudi Arabia and TUV-SUD Middle East LLC Qatar
Petroleum.

HIGH SCHOOL
Delmonte National High School - National High School Agusan del Sur
Year Graduated: March 31, 1993-1994

ELEMENTARY

SAN VICENTE ELEMENTARY SCHOOL

Prosperidad Agusan Del Sur

Year Graduated : March 31, 19881989

SKILLS AND INTEREST


FIFTEEN (15) years of experience in the Middle East and South East Asia with
different International Construction Companies. I am competitive, hardworking and have
thorough knowledge in the construction implementations. Consistently, assumes
responsibility to complete the projects within time and budget constraints, independently
and or with a Team. Monitoring work activities and manpower scheduling and technically
proficient in all kinds of structural works and erections and demonstrate ability to lead all
project component functions.

SERVICE RECORDS:
Company:
Project:
Address:
Position:
Year:

Company:
Project:
Address:
Position:
Year:

Sung Do Arabia Contracting Ltd.


Saudi Aramco Cogen IPP project
Abqaiq, Kingdom of Saudi Arabia
Overall Supervisor
2014 2016

Sung Do Arabia Contracting Ltd.


Shaybah NGL Power Generation Project
Shaybah, Kingdom of Saudi Arabia
Rigging supervisor / Overall Supervisor
2012 2014

Duties and Responsibilities:

Schedules and supervises all working activities.


Familiar in isometric drawing, documentation and plan work activities.
Assist the foremen in identifying changes to the scope of work and
documenting change orders.
Prepare daily report of work progress and man power utilization.
Ensures the accuracy of project information submitted by foremen.
Monitors quality of work throughout the life of the project and ensures
installations meet customer specification and industry standards.
Responsible for all necessary materials and proper equipment to handle
the job.
Responsible for daily checks on the construction management system so
that they work at optimum efficiency.
Follow up corrective actions and implement countermeasures to minimize
reoccurrence of faults.
To allocate work and completion in accordance with the monitoring
system.
Maintain knowledge of safety requirement, including emergency response
action.

Supervision of all activities and ensures safety and quality standards of


the client.
Conduct safety walk through in the site in co-ordination with the safety
department on weekly basis.

DAEWOO ENGINEERING AND CONSTRUCTION COMPANY


RUWAIS REFINERY EXPANSION PROJECT
Ruwais Abudhabi UAE
Position held

RIGGER SUPERVISOR & EQUIPMENT


COORDINATOR
June 2010 up to june 2011

Duties and Responsibilities

Supervision of all rigging & lifting works


Assign all foremen to their area of responsibilities.
Visit site for lifting plans preparation.
Conduct daily Supervision of all rigging & lifting works.
Supervision & monitoring of all equipment.
Assign TOOLBOX TALK.

GS-DAEWOO CONSORTIUM ENGINEERING AND CONSTRUCTION


COMPANY
Laffan Refinery Project, Laffan Industrial City, Al-Khor
State of Qatar
Position held -

RIGGING SUPERVISOR
July 2008 to March 2010

Duties and Responsibilities:


Lead a team for structural assembly and erections works for Laffan Refinery
Project
Supervised erections and modifications, fabrications and mechanical works for
all steel structures activities
Coordinates with Sub-Contractors for the daily activities and ensuring that all
works performed are in accordance with the engineering designs required for the
plant
Proposed changes in designs if materials did not fits on the field requirements
Ensuring that all works are performed as per built-in designs and drawings that
is Approved for Construction Revisions approval as to the proposed designs if
theres are taken into consideration prior constructions and erections works

Responsible for planning, scheduling, organizing and controlling of works on site,


lay down and workshop areas.
Knowledgeable in Microsoft office works.

SUNG DO ENGINEERING AND CONSTRUCTION COMPANY


Ras Laffan Refinery Project, Ras Laffan Industrial City, Al-Khor
State of Qatar

Position held

RIGGING SUPERVISOR

October 2007 to July 2010

Duties and Responsibilities:

Supervision of all rigging & lifting works at C2 Air separation unit (ASU).
Supervision & monitoring of all equipment.
Assign all foremen to their area of responsibilities.
Visit site for lifting plans preparation.
Conduct daily TSTI.

Work Accomplishments:

Lifting of Analyzer and VSDS house weighing 60 tons.


Continue supervision of lifting and settings of cable drum, steel support,
cable trays and ladder at high rise area.
Completion of assisting of cable pulling w/out any incident & injury.

SAMSUNG ENGINEERING AND CONSTRUCTION COMPANY


Formosa PetroChemical Corporation, Gas Plant Project
Mailiao Village, Yunlin Country, Taiwan, R.O.C

Position Held

FOREMAN RIGGER

May 2005 to September 2007

Duties & Responsibilities:

Supervise all rigging works in Module 4.


Assign all Foremen to their area of responsibilities.
Visit site for lifting plans preparation.
Conduct daily safety toolbox meeting.

Work Accomplishments:

Erection of vessels R84-C-0421 (800 tons), R84-C-0401 (650 tons), R84-C-0431 (700
tons).
Erection of drums R84-D-0421 (200 tons), R84-D-0401 (160 tons), R84-D-0431 (190
tons).
Erection of heat exchanger weighing 60 to 120 tons using heavy lift cranes. (Crawler
crane with capacity of 1,200 tons for erection and 600 tons for tailing lift).
Implement proper utilization of all necessary rigging tools and equipment with
personal protective equipment for workers safety.

Al-RASHAID CONSTRUCTION COMPANY LIMITED


Corporation

/EEI

Olefins Complex United Project- Flour Arabia Limited


Jubail, Kingdom of Saudi Arabia

Position Held

FOREMAN RIGGER

April 2003 to August 2004

Duties and Responsibilities

Supervise all lifting works.


Give instructions to Foremen.
Conduct regular safety toolbox meeting.

Work Accomplishments:

Supervision and preparation for erection of structural steel, pipes, vessels, steam
drum, and exchanger at Pipe rack and reactor area using crawler and mobile
crane 250 and 50 tons capacity.
Make sure that safety standards are implemented at work with the use of all
rigging tools, equipment and personal protective equipment.

AMEC BKW Arabia Limited, Saudi Aramco


Berri Gas Plant Recovery Project (BI-3150)
Jubail, Kingdom of Saudi Arabia
Position Held

FOREMAN RIGGER
September 2001 to March 2003

Duties and Responsibilities:

Supervise erection works.

Give instructions and crane assignments to riggers.


Conduct regular safety toolbox meeting before work commence.

Work Accomplishments:

Supervision and preparation for erection of structural steel pipes, vessels, steam
drum, valves, and exchanger at the reactor area using crawler and mobile crane
250 and 50 tons capacity, making sure that safety standards are implemented
with the use of all rigging tools, equipment and personal protective equipment.

Amco Methanol Plant Project


Moxon Dolphin Kerby
Punta Europa, Malabo, Equatorial Guinea
POSITION Held :

FOREMAN RIGGER
September 2000 to July 2001

Duties and Responsibilities:

Supervise erection works.


Give instructions to erectors for daily activities.
Prepare materials for erection.
Conduct daily safety toolbox meeting.

Work Accomplishments:

Supervision and preparation for installation and erection of structural column,


steel beams, truss girder, immediate beam, x-bracing, parlins, and hanging
sailing support prior to installation of sailing, using 50 tons capacity mobile crane
and rigging and erection tools, equipment and personal protective equipment for
safety.

Das könnte Ihnen auch gefallen