Beruflich Dokumente
Kultur Dokumente
Lego-like
PCMs use latent heat to store & release heat (melting & crystallizing)
Developed with University of Edinburgh
Same basis as re-useable handwarmers, packaged as a system unit
Useable Water
Energy Tank
Heat
Battery
Advantage
over Water
$/kWh
$150
$150
Equivalent
$/kWh
$300
$150
2x
Wh/L
13.5
54
4x
W/L
10
300
30x
Wh/kg
23
60
>2.5x
Wh/L
35
60
~2x
energy
Intermittent input
Heat storage
energy
Controlled output
hot water
heating
time
time
Solar PV on homes
PV going on 1000 housing
association homes in concert with
Local Energy Challenge Fund
Delivered by Edison Energy using a
funded PV model (FIT + funder)
Solar PV will provide free electrical
energy to tenants
30 50% is likely to be used by
tenants
Saving them 100 150 per year
BUT the remainder (50% 70%)
would be lost to the grid
SunampPV designed to solve this
SunampPV solution
SunampPV
Combi-boiler
Bypassed most of the time
Up to 75% of
annual hot
water FREE
Heat stored
to meet
future need
Heat Pump
Heat used on
demand
when needed
Sunamp Stack
Central Heating
Aim to cover
household
baseload
electrical use
Feed in Tarrif
eligible
Sunamp
Heat
used on
demand
Central Heating
Wall Mounted
12.0
16.0
12
12
1,607
3,724
3,815
3,986
1,657
3,986
4,087
4,280
1,607
3,724
3,815
3,986
1,657
3,986
4,087
4,280
213
493
505
528
213
528
541
567
38
89
91
95
38
95
97
102
96
223
229
239
96
239
245
257
Total, [/y]
347
805
825
862
347
862
883
926
----
458
478
515
----
515
536
579
Overall we should get 1.5 to 1.8 times the heat out as gas in
Heat
stored to
meet
evening/
night
need
Heat Pump
Group
Heating
Loop
Heat
used on
demand
Sunamp Stacks
Sunamp Heat
Interface Unit
In plant room
Per Apartment
Central Heating
Range of Solutions
No one single solution fits all buildings. We are developing a pick one from
each of column A, B, C approach to maximise benefits delivered.
A
B
C
mCHP
PV
mCHP
B
PV
Heat Pump
SunampPV
Off-Peak Tariff
SunampStack
Resistance Heat
Off-Peak Tariff