Beruflich Dokumente
Kultur Dokumente
Using ATPDraw program set up the model of the MV network shown in Fig.1
20 kV
L1 overhead 15km
110 kV
U
Zs
T1
ZL1
L2 cable 6km
ZL2
W
Rn
L3 cable 5km
L4 overhead 25 km
ZL3
Xn
L5 overhead 18km
ZL4
Busbar
1,85 m
1,85 m
V tower =10 m
Vmid = 9 m
5. Loads:
ZL1
ZL2
ZL3
ZL4