" A " Frame repairs have been completed
20 bolt bearing retaining flange
" A " Frame painted
Complete "A " Frame pin install proceedure

Mechanics
Signature

Supervisors
Signature

Mechanics
Signature

Supervisors
Signature

N/A

N/A

MEDIA NO.SEBE5558-02
Check sheet 14
Check sheet 4
Check sheet 5
Caterpiller procedure
Caterpiller procedure

N/A

N/A

MEDIA NO.SEBE5558-02

N/A

N/A

Work Proceedures
SSB
Supervisor
Paint Shop
Check Sheet 3

Work Proceedures
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

Rear axle repairs been completed by SSB


Line boring completed
Geo tech bearings installed
Machining for rear axle lubrication completed
Baffles removed
Axle housing painted
Axle housing washed
Axle housing dried
Drain plug installed
Internal lubrication lines installed
Differential & Transmission assembly installed
Lhs final drive installed
Rhs final drive installed
Lhs axle & sungear installed
Rhs axle & sun gear installed
Aeta sensors (lhs & rhs) installed
Aeta guard & mud scapers installed
External axle lubrication installed
Rear brake lines fitted
Fill differential with oil
Particle counting complete
Stabilizer Bearings replaced
Stabiliser installed to axle housing
Tyre hose & guard fitted
Install axle assembly to " A " frame in truck