Sie sind auf Seite 1von 9

Types Of Roles & Resp

Types of Projects
Implementation
Support
Rollout
Upgradations

Implementation

Based on the customer requirement I will configured the SCM


SLA
Application Implimentation Methodology
1. Definition
2. Analysis
3. Solution
4. Build Phase
5. Testing Phase

6. Production
Vision Instance
Development
Testing Instance
Staging Instance
User Accetancy testing Instance
Production Instance

Oracle Unified Methodology

Service Level Agreement


AIM
Required Document
RD-20
BR-30, BP-40(AS_IS),BP-80(TO-BE), MD-50(FDD)
BR-10, BR-100

Buiness Requirment
Gap Ananlysis
This is the req and this is the solution

MD-50 for Functinal Design Doc)


MD-70( Technical design Document)
TE-40
TE-50
CV-60
D-70

Expected Result
Actual Result
Data Migration
User manuals

Definition, Analysis, Solution


Build
Unit, Smoke, testing, Conference Room Pilot

Segrigation Std or non Std


d this is the solution

Definition
Operation Analysis
Solution Design
Build
Transaction
Production

Data Gathering
Analys the Gathered Data
Mapping

RD-20
BP-80
BR-10
BR-100

Gap Document
Setup Document

ap Document
etup Document

GL_SUPERUINV_NAVIG Purchasing SuperUser GUI

1Z0225

Das könnte Ihnen auch gefallen