DESIGN-BUILD

CONSTRUCTABILITY CHECKLIST
(FOR INSTRUCTIONS, SEE INSTRUCTION TAB BELOW)

PARK:

PROJECT TITLE:

ITEM #

PROJECT ISSUES
RFP

PMIS:

RFP COMMENTS
PART 1

ANY NON-TYPICAL CONTRACT LINE ITEMS


NEEDED FOR TRACKING PURPOSES

RECOMMENDED CONTRACT LENGTH


(Including Design & Construction consider seasonal
constraints)

DATE:

COMPLETED BY:
RESOLUTION

PROJECT INTRODUCTION

SPECIFIC PHASING REQUIREMENTS


(Fast Track allowed)

RFP

PART 2

NOISE / DUST / SAFETY CONCERNS

SALVAGEABLE ITEMS / PARK/ RECYCLE

PROJECT REQURIEMENTS

1 of 4

FORM DBCC 041509

ITEM #

PROJECT ISSUES
RFP

RFP COMMENTS
PART 1

HAZARDOUS MATERIAL CONSIDERATIONS


(State and local requirements)

ANY SPECIAL RESOURCE PROTECTION


REQUIRED

ARCHEOLOGICAL POTENTIAL MONITORING


REQUIREMENTS (Arch / Native American)

ADEQUATE SPACE ON SITE FOR CONSTRUCTION


STAGING (Prime, Subs, Material Storage)

10

AVAILABILITY OF TEMPORARY UTILITIES FOR


STAGING (electric, phone, etc.)

11

LOGISTICS- TRAFFIC CONTROL/ IMPACTS TO


PARK AND VISITOR OPERATIONS

12

SITE ACCESS ISSUES/ LOAD LIMITS


BRIDGE/TUNNEL HEIGHT RESTRICTIONS

13

REMOTE SITES -CONSTRUCTION CAMP NEEDED


(If needed consult with Park or Concessionaire)

RESOLUTION

PROJECT INTRODUCTION

2 of 4

FORM DBCC 041509

ITEM #

PROJECT ISSUES
RFP

RFP COMMENTS
PART 1

14

ANY SPECIAL SIGNAGE REQUIREMENTS

15

MAJOR SAFETY CONCERNS

16

ANY CONSTRAINTS ON MEANS AND METHODS


(blasting vs. mechanical, etc.)

17

MATERIAL SUBMITTALS ON THE CRITICAL PATH

18

SITE ACCESS AND WORK HOUR RESTRICTIONS


ON CONSTRUCTION OPERATIONS

19

PARK / CONCESSION IMPOSED RESTRICTIONS


IMPACTS ON SCHEDULE & COST

20

EQUIPMENT & MATERIAL SUBMITTALS


(Requiring Government approval)

RESOLUTION

PROJECT INTRODUCTION

3 of 4

FORM DBCC 041509

ITEM #

PROJECT ISSUES
RFP

RFP COMMENTS
PART 1

21

LONG LEAD ITEMS/ MATERIAL AND


EQUIPMENTAVAILABILITY/SPECIAL DELIVERY
REQUIREMENTS

22

ANY SOLE SOURCE OR GOVERNMENT


FURNISHED MATERIALS OR EQUIPMENT

23

IDENTIFY TEMPORARY SYSTEMS REQUIRED


(Coordinate for Park / Public needs)

24

TRAINING REQUIREMENTS
CERTIFICATIONS REQUIRED

RESOLUTION

PROJECT INTRODUCTION

4 of 4

FORM DBCC 041509