Project Scheduling II
Farhan Saleem
Scheduling Tools
; Bar charts
; Network Diagrams
;CPM
;PERT
Farhan Saleem
PERT
Farhan Saleem
PERT Advantage
PERT network allows the use of probability theory for estimation of
activity and project completion dates when there is
uncertainty.
The advantage of the PERT statistical approach is that it offers a
method of dealing with chance variation
Farhan Saleem
Farhan Saleem
Farhan Saleem
Farhan Saleem
Farhan Saleem
6
5
4
3
2
1
0
0
10
15
20
25
30
Farhan Saleem
Farhan Saleem
of
Mean
and
Standard
Farhan Saleem
68%
95%
99%
-3
-2
-1
+1
+2
+3
Farhan Saleem
Farhan Saleem
Two variant curves. (a) Values are widely dispersed away from their average.
(b) Values are tightly grouped about their average.
Farhan Saleem
Farhan Saleem
Activity
Mean
based on beta distribution
tm =
a + 4m + b
6
tm1, s1
Standard deviation
T = t1 + t2 + + tn
A sequence of n independent activities
b a
3 .2
Note:
tm= m only if a and b are
symmetrically
placed
(normal
distribution)
In CPM procedure the single time
estimate is an estimate of the
mean activity duration and not
necessarily the most likely time
tmn, sn
tm2, s2
Mean
Variance
Tm
V
n
t mi
i=1
n
= V ti
i=1
=
16
Farhan Saleem
Activity
A
B
K
a
5
7
10
m b
7
10
11 15
12 13
10-5
3.2
mean
7.2
11
11.8
std dev
1.56
2.5
0.94
D
28,5
J
12,2
N
8,1.2
Milestone:
L to complete
by day 50
G
10,1.5
C
8,2.8
Mean = 47.83
Variance = 20.63
Std dev = 4.54
L
7,1.5
I
4,0
M
22,0
E
10,3
H
8,1.5
8,1.5
ADL
CGKL
BEHKL
BFHKL
F
7,2
42.17
36.83
47.83
44.83
Farhan Saleem
(4,1.0)
[a,m,b]
(2,0.5)
(1,0.1)
[1,2,3]
(5,14.06)
(4,1.56)
(3,0.39)
[6,8,10]
(1,0.1)
[3.5,5,6.5]
4
(3,0.3)
Act.
1-3
3-7
7-9
Mean
2
8
5
symmetrical
Variance
1+4x2+3
3-1 2
0.39
6
3.2
1.56
0.88
Event
3
7
8
9 (complete)
Mean
2
10
11
15
Variance
0.39
Path 1-3-7
1.95
16.01 Path 1-3-6-8
2.83
Path 1-3-7-9
(tm, vt)
Project
completion
14
15
By path 1-3-6-8-9
Mean: 14
Variance: 16.40
What is the effect of this?
Farhan Saleem
Farhan Saleem
Questions/Queries?
Farhan Saleem
10