Sie sind auf Seite 1von 2

Silcasia Energy

Generating Power from Waste

This document provides a brief detail


about our project and processes in
setting up a power and fuel conversion
plant in Dhaka Bangladesh.

1/1/2010
Project overview opportunity to us as a new technology energy company to
establish a strong company in this sector.
Silcasia Energy has been setup to promote new
technology converting waste to fuel and manage We planned to invest 105,000,000.00 (one hundred and
environmental service for municipal authorities in South five million pounds) over a period of five years. The
Asia. project has been designed to be completed in three
phases.
Our primary objective is to own and
operate Waste to Fuel processing plants The first phase will be implemented with only one unit of
in Bangladesh producing synthetic diesel WTF2000 in Dhaka City at a cost of 22 million.
from all types of municipal and industrial
Phase two and three will be completed by year 3-5 which
waste to generate electricity.
will include a sewage treatment plant.
Silcasia Energy is looking forward to work with the
We are looking for initial investors in the company who
respective local Governments/Companies to provide
will become promoter investors and hold places of
solutions in Waste Management Process and turning it
directorship in the board of company directors.
from a cost based activity to a profit oriented and
environment friendly production process. We are presently looking to raise 120,000.00 (one
hundred and twenty thousand pounds) for the setup and
The group has initiated a project to participate and
promotion of the company in Bangladesh and to raise
establish in the commercial viability of a newly developed
finance from NRBs abroad.
municipal solid waste to energy conversion process and a
limited number of activities in environmental and The company will be setup with the government of
ecological technology. Bangladesh on PPP 30/70 basis to facilitate a strong and
continuous operational relationship with the government.
Our technology is known as WTF2000 and the details
including cost of plant and production can be found at: It is proposed that in order to maximise our profit and
minimise costs a group of 10 initial investors are invited to
http://mjowardhar.web.officelive.com/default.aspx
join the three exiting promoters in the company. A
We are the pioneers in introducing waste to fuel green summary of initial investment costs are detailed below;
energy conversion process. And with our unique
Office in Dhaka 15,00,000.00 BDT 15,000.00
technological advantage there isnt a competitor in the
Accommodation 5,00,000.00 BDT 5,000.00
market to compete with our technology or the business. Transport 10,00,000.00 BDT 10,000.00
Overhead 50,00,000.00 BDT 50,000.00
There is a huge market for energy in Bangladesh and
Publicity 5,00,000.00 BDT 20,000.00
opportunity to invest with high return is likely to continue
Travelling 5,00,000.00 BDT 20,000.00
for next 40 years. The global energy investment
requirement by 2050 is estimated to stand at 50 trillion
USD. We are looking for a group of 10 venture capitalists to
invest in this exciting and profitable business and hold
The national governments are under obligation to reduce shares worth in millions of pounds.
greenhouse emissions and the developing nations
presents a great opportunity to introduce new initiatives For more information please visit our website or contact
and technologies in producing low emission alternative us by email or telephone. Details can be found on our
energy for power. Bangladesh is in such an website.
advantageous position and presents such and unique

Das könnte Ihnen auch gefallen