Beruflich Dokumente
Kultur Dokumente
Technical Description
Pipeline Filing Requirements
Manifold 203 Discharge
WPE
Road
Bore
Road Bore to
Valve Manifold
Tee to CTM
Metering
CTM to Valve
Manifold
36
36
36
36
36
16
36
914.0
914.0
914.0
914.0
914.4
406.4
914.4
19.05
12.70
12.70
12.70
9.52
9.52
9.52
GR 448
GR 359
GR 359
GR 359
GR 241
GR 241
GR 241
PN 50
PN 50
PN 50
PN 50
PN 20
PN 20
PN 20
MOP (kPag)
4960
4960
4960
4960
1900
1900
1900
876
230
180
52
25
105
35
Grade/Class
Depth of Burial
Coatings
Tank Lines
Tank 303
Tank 304
Tank 305
Tank 306
Tank 307
Tank 308
Tank 309
48
48
48
48
48
48
48
1219.0
1219.0
1219.0
1219.0
1219.0
1219.0
1219.0
10.31
10.31
10.31
10.31
10.31
10.31
10.31
GR 241
GR 241
GR 241
GR 241
GR 241
GR 241
GR 241
PN 20
PN 20
PN 20
PN 20
PN 20
PN 20
PN 20
MOP
1900
1900
1900
1900
1900
1900
1900
Approximate Length
(m)
360
345
360
225
95
110
100
Grade/Class
Depth of Burial
Coatings
BP Discharge
Valve
Manifold
to BP
Suction
To E2H
MLP
Suction
To L4
Road
Bore
L4 Road
Bore
To L4
MLP
Suction
Storm Water
Pond Drain
Line
WPE to
Common
Relief Line
Mainline
Pump
Suction to
Common
Relief Line
Common
Relief
Line
Common
Relief Line
to Tank 306
Common
Relief
Line to
Tank 307
42
36
36
36
36
12
24
24
24
24
24
Outside Diameter
(mm)
1067.0
914.0
914.0
914.0
914.0
323.9
609.6
609.6
609.6
609.6
609.6
9.52
12.70
12.70
12.70
12.70
17.48
9.52
9.52
9.52
9.52
9.52
GR 241
GR 359
GR 359
GR 448
GR 359
GR 241
GR 241
GR 241
GR 241
GR 241
GR 241
PN 20
PN 50
PN 50
PN 50
PN 50
PN 20
PN 20
PN 20
PN 20
PN 20
PN 20
MOP (kPag)
1900
4960
4960
4960
4960
1900
1900
1900
1900
1900
1900
Approximate
Length (m)
110
35
340
905
220
20
110
25
190
55
45
Wall Thickness
(mm)
Grade/Class
Depth of Burial
Coatings
Product Carried:
Heavy Crude Oil
Description of Flaring System:
N/A
Corrosion Control Elements:
Cathodic protection for underground piping
Crossings:
Enbridge has initiated the process of identifying potential pipeline crossings in the vicinity of the work area at the Edmonton Terminal (North) &
Edmonton Terminal (South) facilities. Any required crossing agreements will be in place prior to construction.
Description of corrosion control elements:
External coatings will be applied as per Enbridges Coating Specifications C-110: Coating of Buried Steel with Plural-Component Spray Applied
Coatings for the terminal and C-010: External Fusion Bonded Epoxy Coating for the transfer lines.
Cathodic Protection will be used on underground piping and structural piles. This will be achieved utilizing Anode rods, with an applied DC current
supplied via rectifiers. The cathodic protection for tank bottoms will be achieved with anode ribbons buried beneath the floor.
Centrifugal
Electric up to 4000 HP
N/A
Suction: NPS 36, 9.52 mm, carbon steel, grade 241
Discharge: NPS 36, 12.7 mm, carbon steel, grade 359
Suction flange & piping will be designed to be a PN 20 system
Discharge flange & piping will be designed to be a PN 50 system
Fluid temperature range is 0oC to 38oC
Minimum Value
Maximum Value
397
1590
2450
7066
441
517
Outlet Pressure[kPag]
303
362
Tank 02
Tank 03
Tank 04
Tank 05
88481
88481
88481
88481
88481
80000
80000
80000
80000
80000
7066
7066
7066
7066
7066
5888
5888
5888
5888
5888