Name of the Location

Side arm

T' RISER

11 Mtr Pole
Concreting

Pole Coil Earthing

9.1 Mtr Pole


Concreting

Stay Concreting

Cut Point

33 KV DP

33 KV VF

Span of Length

33 KV Disks & MP

33 KV Pins &
Insulators

Stay Sets

Spl. Top cleats

33 KV Tapping
Channel

33 KV V Crossarm

8.0 Mtr Stut Pole

9.1 Mtr Pole

11 Mtr Pole

Survey

Location No.

Sl. No.

33 KV Pole Schedule

Thatikonda to Malkapur Link Line 33 KV

850

37

37

37

37

34

34

37

30

30

56

56

55

51

10

62

62

11

10

42

42

12
13
14
15
16
17

11
12
13
14
15
16

58
38
36
40
52
56

1
1
1
1
1
1

1
1
1
1
1

1
1
1
1
1
1

3
3
3
3
3
3

58
38
36
40
52
56

18

17

48

48

19
20
21
22
23
24

18
19
20
21
22
23

41
47
30
35
47
56

1
1
1
1
1
1

1
1
1
1
1
1

1
1
1
1
1
1

3
3
3
3
3
3

41
47
30
35
47
56

25

24

57

57

26

25

53

53

27

26

40

28

27

55

29

28

40

30

29

93

31

30

60

32

31

33

12

1
1

2
1

1
2

850

37

55
6

51

1
1

1
1

1
2
1
1
1
2
1

40

55

93

60

52

52

32

54

34

33

35

35

35

34

51

51

36

35

41

41

37

36

40

40

38

37

37

37

39

38

52

40

39

43

43

41

40

54

54

42

41

48

48

43

42

66

66

44

43

47

47

45

44

71

71

46

45

46

46

47

46

38

38

48

47

54

54

49

48

41

41

50

49

51

51

51

50

45

45

52

51

62

62

53

52

34

34

1
1
1
1
1
1

40

54

52

48

49

39

42

42

59

53

53

61

60

54

54

62

61

42

42

63

62

43

64

63

53

53

65

64

54

54

66

65

56

56

67

66

42

42

68

67

40

40

69

68

64

70

69

39

71

70

32

72

71

43

73

72

46

74

73

41

75

74

61

76

75

31

31

77

76

43

43

78

77

36

36

79

78

41

41

80

79

62

62

81

80

48

48

82

81

62

62

83

82

31

84

83

35

35

85

84

33

33

86

85

41

41

87

86

44

44

88

87

52

89

88

27

27

90

89

38

38

91

90

50

50

92

91

54

54

93

92

52

52

94

93

42

42

95

94

48

48

96

95

43

43

97

96

52

52

98

97

42

42

99

98

49

49

100

99

93

101 100

47

47

102 101

48

48

103 102

43

43

104 103

42

42

105 104

72

72

106 105

58

58

107 106

52

52

43

1
2

39

32

43

46

41

45

64

36

1
1

61

93

31

52

1
1

1
1

Side arm

60

T' RISER

58

11 Mtr Pole
Concreting

59

Pole Coil Earthing

39

9.1 Mtr Pole


Concreting

57

Stay Concreting

58

Cut Point

33 KV DP

49

33 KV VF

48

56

Span of Length

55

57

33 KV Disks & MP

56

33 KV Pins &
Insulators

Stay Sets

45

Spl. Top cleats

54

33 KV Tapping
Channel

55

33 KV V Crossarm

8.0 Mtr Stut Pole

Survey
36

9.1 Mtr Pole

Location No.
53

11 Mtr Pole

Sl. No.
54

53

53

109 108

44

44

110 109

48

48

111 110

45

45

112 111

52

52

113 112

42

42

114 113

26

26

115 114

31

31

116 115

54

54

117 116

47

47

118 117

48

119 118

51

51

120 119

48

48

121 120

51

51

122 121

47

47

123 122

51

124 123

56

125 124

37

126 125

53

127 126

38

128 127

37

129 128

38

37

65

65

130 129

44

44

131 130

67

67

132 131

38

38

133 132

39

39

134 133

46

135 134

49

49

136 135

52

52

137 136

39

39

138 137

41

139 138

37

37

140 139

52

52

141 140

69

69

142 141

43

43

143 142

67

144 143

50

50

145 144

35

35

146 145

38

38

147 146

33

33

148 147

53

53

149 148

33

150 149

44

44

151 150

42

42

152 151

31

31

153 152

30

30

154 153

47

47

155 154

52

52

156 155

35

35

157 156

41

41

158 157

54

54

159 158

34

34

160 159

34

34

161 160

55

56
6

37

53

1
1

46

3
1

1
1

41

3
1

67

1
1

33

55

Side arm

T' RISER

48

51

11 Mtr Pole
Concreting

Pole Coil Earthing

9.1 Mtr Pole


Concreting

Stay Concreting

Cut Point

33 KV DP

33 KV VF

Span of Length

33 KV Disks & MP

33 KV Pins &
Insulators

Stay Sets

Spl. Top cleats

33 KV Tapping
Channel

33 KV V Crossarm

8.0 Mtr Stut Pole

9.1 Mtr Pole

11 Mtr Pole

Survey

Location No.

Sl. No.

108 107

29

163 162

32

32

164 163

41

41

165 164

41

41

166 165

50

50

167 166

52

52

168 167

51

51

169 168

40

40

170 169

38

38

171 170

30

30

172 171

32

32

173 172

52

52

174 173

87

87

175 174

52

52

176 175

71

71

177 176

48

48

178 177

55

55

179 178

124

124

180 179

61

61

181 180

46

46

182 181

44

44

183 182

58

184 183

44

44

185 184

47

47

186 185

54

54

187 186

44

44

188 187

41

189 188

37

191 190

1
2

1
1

9717

190 189
Total

194

41

37

1
1

1
1

2
1

58

Side arm

T' RISER

Pole Coil Earthing


1

29

11 Mtr Pole
Concreting

9.1 Mtr Pole


Concreting

Stay Concreting

Cut Point

33 KV DP

33 KV VF

Span of Length

33 KV Disks & MP

33 KV Pins &
Insulators

Stay Sets

Spl. Top cleats

33 KV Tapping
Channel

33 KV V Crossarm

8.0 Mtr Stut Pole

9.1 Mtr Pole

11 Mtr Pole

Survey

Location No.

Sl. No.

162 161

0
1
1

60 ### 35 ### 15

564 ### 9717

15 15

66 255

850

20

19

43

48

37

50

49

49

38

38

62

62

10

10

47

47

11

11

47

47

12

12

65

65

13

13

47

47

14

14

42

42

15

15

44

44

16

16

32

32

17

17

33

33

18

18

32

32

19

19

35

20

20

51

21

21

37

22

22

67

23

23

58

24

24

41

25

25

54

26

26

36

27

27

43

28

28

56

29

29

46

46

30

30

50

50

31

31

45

45

32

32

39

39

33

33

40

40

34

34

51

51

35

35

53

53

36

36

37

37

37

37

44

44

38

38

41

41

39

39

45

45

40

40

53

41

41

45

42

42

49

43

43

42

44

44

53

45

45

46

46

46

53

47

47

52

48

48

48

49

49

41

50

50

50

51

51

45

850

20

19

43

48

37

1
1
2
1

1
1

50

2
1

1
1

1
1

35

51

37

67

58

41
6

54

36

43

Side arm

Chagal to Thatikonda Link Line 33 KV

T' RISER

11 Mtr Pole
Concreting

Pole Coil Earthing

9.1 Mtr Pole


Concreting

Stay Concreting

Cut Point

33 KV DP

33 KV VF

Span of Length

33 KV Disks & MP

33 KV Pins &
Insulators

Stay Sets

Spl. Top cleats

33 KV Tapping
Channel

33 KV V Crossarm

8.0 Mtr Stut Pole

9.1 Mtr Pole

11 Mtr Pole

Survey

Location No.

Sl. No.

Name of the Location

56

53

1
1

45

49

42

53

46

53

52

48

41

50

45

o
o
o

1
0

56

45

57

57

36

58

58

49

59

59

46

60

60

44

61

61

44

62

62

46

63

63

47

64

64

50

65

65

85

66

66

45

67

67

45

68

68

56

69

69

22

70

70

37

71

71

62

72

72

51

73

73

40

74

74

38

75

75

51

76

76

49

77

77

46

78

78

57

79

79

44

80

80

47

47

81

81

46

46

82

82

43

43

83

83

44

44

84

84

47

47

85

85

37

37

86

86

45

45

87

87

49

49

88

88

44

44

89

89

50

50

90

90

48

48

91

91

57

57

92

92

53

53

93

93

55

94

94

55

95

95

52

96

96

52

97

97

61

98

98

42

99

99

50

43

49

49

47

47

45

36

1
1

1
1
1

44

44

46

50

85

45

56

22

37

62

51

40

38

51

49

2
1

1
1
1

1
1

1
1

47

1
1

2
1

46

55

52

52

61

42

1
1

43

101 101

35

35

102 102

47

47

103 103

46

104 104

105 105

32

46

2
0

32

43

44

55

55

100 100

45

55

2
1

57
6

46

49

Side arm

56

T' RISER

55

9.1 Mtr Pole


Concreting

54

55

Cut Point

54

33 KV DP

43

33 KV VF

53

Stay Sets

53

11 Mtr Pole
Concreting

Pole Coil Earthing

Stay Concreting

Span of Length

33 KV Disks & MP

33 KV Pins &
Insulators

Spl. Top cleats

33 KV Tapping
Channel

33 KV V Crossarm

8.0 Mtr Stut Pole

Survey
50

9.1 Mtr Pole

Location No.
52

11 Mtr Pole

Sl. No.
52

48

66

55

55

111 111

54

54

112 112

67

67

113 113

45

114 114

27

115 115

61

116 116

11 Mtr Pole

110 110

Survey
66

Location No.

48

109 109

Sl. No.

108 108

45

27

61

55

55

117 117

42

42

118 118

45

45

119 119

53

53

120 120

48

48

121 121

54

54

122 122

56

56

123 123

42

42

124 124

57

57

125 125

34

34

126 126

42

42

127 127

45

45

128 128

48

48

129 129

67

130 130

76

131 131

85

132 132

76

85

48

48

133 133

57

134 134

88

135 135

73

136 136

61

137 137

54

138 138

58

139 139

56

140 140

62

141 141

59

142 142

57

88

73

54

58

56

62

59

41

41

143 143

52

52

144 144

48

145 145

59

59

146 146

36

36

147 147

52

52

148 148

49

49

149 149

57

57

150 150

53

53

151 151

50

50

152 152

60

153 153

73

73

154 154

47

47

155 155

56

56

156 156

35

35

157 157

42

42

158 158

57

57

159 159

67

67

Side arm

T' RISER

Pole Coil Earthing

57

11 Mtr Pole
Concreting

9.1 Mtr Pole


Concreting

57

Stay Concreting

107 107

Cut Point

Span of Length

33 KV DP

33 KV Disks & MP

45

33 KV VF

33 KV Pins &
Insulators

45

Stay Sets

8.0 Mtr Stut Pole

9.1 Mtr Pole

Spl. Top cleats

33 KV Tapping
Channel

33 KV V Crossarm

106 106

67

61

48

60

1
2

1
1

1
1

1
1

162 162
49
1

Total
8733 10 145

33 KV V Crossarm

8.0 Mtr Stut Pole

9.1 Mtr Pole

11 Mtr Pole

Survey

Location No.

Sl. No.

1
2
3
6
60

1
1
1
3
40

1
1
3
49

36 ### 16 ### 27
501 ### 8733
4
4

Stay Concreting

1
2

13 27

163 163
1
1
1

164 164
1
1
1

165 165
1
1
1

166 166
1
1
1

167 167
1
1
1

168 168
1
1
1

68 190 10

Side arm

T' RISER

11 Mtr Pole
Concreting

Pole Coil Earthing

9.1 Mtr Pole


Concreting

Cut Point

33 KV DP

33 KV VF

33 KV Tapping
Channel

Span of Length

40

33 KV Disks & MP

161 161
33 KV Pins &
Insulators

Stay Sets

60

Spl. Top cleats

160 160
1

7 12

Sl. No.

Location Name

Survey

11 Mtr Pole

9.1 Mtr Pole

8.0 Mtr Stut Pole

33 KV V Crossarm

33 KV Tapping Channel

Spl. Top cleats

Stay Sets

33 KV Pins &
Insulators

33 KV Disks & MP

Span of Length

33 KV VF

33 KV DP

Cut Point

Stay Concreting

9.1 Mtr Pole


Concreting

Pole Coil Earthing

11 Mtr Pole Concreting

T RISER

Side arm

33 KV Pole Schedule Abstract 1st Bill

Thatikonda to Malkapur Link Line 33 KV

9717

194

60

165

35

178

15

564

165

9717

15

15

66

255

Limited to Agt. Qty. (Present Bill)

9717

194

165

24

178

15

564

165

9717

15

66

139

116

To Be Billed Qty.
2

Chagal to Thatikonda Link Line 33 KV


Limited to Agt. Qty. (Present Bill)

60

11

15

8733

10

145

36

134

16

156

27

501

135

8733

13

27

68

190

10

12

8733

145

134

16

156

27

501

135

8733

13

27

68

17

173

10

11

134 156

12

12

To Be Billed Qty.

10

35

Total Billed (1st Bill)

18450

339

299

40

334

42

Total To Be Billed Qty.

12

95

11

1065 300 18450


0

11

13

42

15

289

Erection of 40.0 Kms of 33 kv lines on Semi-turnkey basis for providing 9 Hrs Agriculture Supply in Operation Jangaon DIVISION
As per Agreement
Cumulative Bill
Previous Bill
Present Bill
Description of Item
Materi Labou
Qty. Unit
Rate
Amount Qty.
Amount
Qty.
Amount Qty.
Amount
al
r
2
3
4
5
6
7
8
9
10
11
12

Sl.
No.
1
1

2.1A
2.2A
2B
2.1B

Detailed survey of new Line and Peg markings for supports &
stays, tree & root clearance and transportation of men & T& P
materials like Sticks, Flags, Vigils, Ropes including cost of
marking powder etc.,
Supply and erection of 11 Mtr. PSCC pole in a pit of size
0.76x0.76x1.82m for 11m PSCC poles including dewatering,
shoring and shuttering where-ever necessary and back filling
the pits with excavated earth after erection including cost of
Bolts,Nuts & washers etc.,
Supply and erection of 11M 365 kgs. WL PSCC pole except
Hard gravel
Supply and erection of 11 M 365 Kgs. WL PSCC poles with
Hard gravel
Supply and erection of 9.1 Mtr. PSCC pole in a pit of size
0.76x0.76x1.52m for 9.1 Mtr PSCC Poles including
dewatering, shoring and shuttering wherever necessary and
back filling the pits with excavatedearth after erection
including
cost
of Bolts,
Supply and
erection
ofNuts
9.1M 280 Kgs. WL PSCC pole except

40

KM

1389

1389

55560.00 18.45

0.00

0.00

0.00

Each Pole

7349

5009

12358

0.00

0.00

0.00

0.00

Each Pole

7349

5207

12556

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

306

871488.00

306

###

###

35

103985.00

35

225785.00 121800.00

299

11661.00

299

440726.00 429065.00

40

1560.00

40

334

8016.00

334

42

35658.00

42

127134.00

91476.00

14910.00

1065

14910.00

0.00

2848

6328

###

80

Each Pole

3480

2971

6451

516080.00

680

Each

1435

39

1474

###

40

Each

1372

39

1411

56440.00

680

Each

409

24

433

Supply and erection of MS Stay Set complete as per drawing


where ever necessary including excavation of stay pit of size
0.45x0.45x1.34 Mts in all soils (except which require
dewatering, shoring and shuttering whereever necessary and
erection of anchor rod and anchor plate

400

Each Set

2178

849

3027

Supply and fixing of 33 kv pin insulators with pins (Standards


to which the pin conforms - IS-2486-Part-II/1989 (latest
version thereof) Minimum failing load 5 KN, Length of
threaded portion in the shank 100 mm, Shank length 150
mm, Total length 450 mm, Type of Galvanization Hot Dip,
Waight of Pin 2400 gms +/- 2%) on already fixed 33 kv x-arms
including transportation, (33 KV pin insulators will be supplied
by TSNPDCL)

###

Each

14

14

3
4
5

Supply and fixing of 1.53 mts. 100x50x6 mm channel 33 kv V


x-arm with suitable clamps (75x8mm) and bolts on to the
already erected poles including transportation
Supply and fixing of 2.1 mts. 100x50x6 mm channel 33 kv
horizental x-arm with suitable back clamps (75x8mm) and
bolts, nuts & washers on to the already erected poles
including transportation
Supply and fixin of Top clamp (MS flat 75x8mm) with cleats
(Ms Angle 65z65x6mm, MS Channel 100x50x6mm) for 33 kv
on to the already erected poles including transportation.

0.00

3480

gravel

25627.05

0.00

Each Pole

2.2B

18.450

640

Hard gravel
Supply and erection of 9.1M 280 Kgs. WL PSCC pole with Hard

25627.05

Material

294440.00

###

26880.00 1065

56440.00

54880.00

144622.00 136606.00

Sl.
No.
1

Description of Item

As per Agreement
Materi Labou
Rate
al
r
5

Qty.
3

Unit
4

Supply and fixing of 33 kv Polymer string insulator set to the


x-arms already fixed wherever necessary, the set should
consists of composite formof 33 kv String insulator with
suitable metal parts, clamp with bolts, nuts and washers for
holding the conductor including transportation. (33 KV
polymer string insulator will be supplied by TSNPDCL)

###

Each Set

183

42

Supply and fixing of standard bracing set with double x-arm


of standard channels and angle for the DPs where ever
necessary including pipe earthing of the DP using no.8 GI
wire, bentonite powder, GI pipe of 40 mm dia 2.5 m long,
suitable bolts and nuts including transportation

40

Each Set

9233

2496

Supply and fixing of danger boards where ever necessary

80

Each
Route
km 3
Nos.
condcut
ors

117

22

Span

11086

4258

15344

120

Set

2481

1328

80

Nos.

2828

1340

10
11

12

13a

13b
14
14a)
14b)
14c
15
16

Stringing of 100 Sqmm AAA conductor on the already erected


pole and insulators, with suitable sag and tension with
necessary jumpers whereever required (conductor will be
supplied by NPDCL).
Supply and erection of suitable cradle type guarding of
standard size per span where ever necessary using channels
of size 75x40x6 mm, no.8 GI Wire etc (As per sketch)
including 2 Nos. stay sets complete, 2 Nos. GI pipes, back
clamps, pipe earthing with GI wire, stay wire and bolts, nuts &
washers with transportation.
Supply and fixing of set of clamps to the already erected pole
for erection of set of Polymer string insulator with metal parts
for vertical formation poles, the 6 set of clamps consists of
12 Nos. Stay clamp made up of MS flat of 100x50x6mm for
supporting the 33 KV jumpers including cost ofBolts, Nuts &
Washers etc.
Supply and fixing of channel x-arms to the already erected
pole for erection of set of polymer string insulator with metal
parts for cutpoint formation poles, including cost of Bolts,
Nuts
& Washers
etc.with CC Mix (1:4:8) using 40 mm HBG
Concreting
of pits
metal including cost of all materials, curing etc., as per the
clause
Pole concreting for DP cut point poles, vertical formation
poles of size0.76x0.76x1.52m
Stays concreting size 0.45x0.45x1.34m
Pole Coil Earthing
Supply and erection of Strut Poles with 8.0 M PSCC Poles, stay
clamps and concreating (0.45x0.45x1.34m) cost of Bolts and
nuts etc
33 KV 'T' raisers made with 100x50 mm MS Channel with
length of 3.6 M and 1 stay clamps set including bolts, nuts &
washers on to the already erected poles including
transportation.
Total :

40

225

Amount
6

270000.00

11729 469160.00
139

11120.00

Cumulative Bill
Qty.
Amount
7
8

12600.00

300

11

27456.00

11

0.00

0.00

3809

457080.00

0.00

4168

333440.00

13

17420.00

0.00

67500.00

Material

54900.00

129019.00 101563.00
0.00

209628.90

0.00

0.00

Present Bill
Qty.
Amount
11
12

300

11362 11362 454480.00 18.45

Previous Bill
Qty.
Amount
9
10

18.450 209628.90

0.00
0.00

0.00

0.00

0.00

0.00

13

54184.00

36764.00

0.00

0.00

160

Nos.

2084

552

2636

421760.00

134

73968.00

134

400
160

Nos.
Nos.

661
94

258
23

919
117

367600.00
18720.00

42
156

10836.00
3588.00

42
156

38598.00
18252.00

27762.00
14664.00

Nos.

4203

1298

5501

5501.00

1298.00

5501.00

4203.00

80

Nos.

2144

56

2200

176000.00

56.00

2200.00

2144.00

10197301.00

1429755.95

0.00

353224.00 279256.00

3849718.95

###

basis for providing 9 Hrs Agriculture Supply in Operation Jangaon DIVISION


Labour

25627.05

0.00

0.00
0.00
0.00
871488.00
103985.00
11661.00
1560.00
8016.00

35658.00

14910.00

Labour

12600.00

27456.00
0.00
209628.90

0.00

0.00

17420.00
0.00
73968.00
10836.00
3588.00
1298.00
56.00
###

ABSTRACT OF THE BILL


Name of the Work: Erection of 40.0 Kms of 33 kv lines on Semi-turnkey basis for providing 9
Hrs Agriculture Supply in Operation Jangaon DIVISION

This certificate CC 1st & Part Bill

Name of the Contractor: M/s. Chaitanya Enterprises,Hanumakonda

M Book No.:

Agreement No. CGM(Opn)/Bulk Scheme/TSNPDCL/9 Hrs Agl/ Agt. No.45/15-16.

Period of work:

Check measured by DE/Const. on


Sl.
No.
1

1335 of Page No.

Date of recording:
Schedule
Code

As per
Agreement

33 KV LINE

10,197,301.00

3,849,718.95

3,849,718.95

Total

10,197,301.00

3,849,718.95

3,849,718.95

Cess @ 1%

101,973.01

38,497.19

38,497.19

Service Tax @ 15%

522,124.41

214,463.39

214,463.39

Total

10,821,398.42

4,102,679.53

4,102,679.53

( + ) Excess @ 4.95 %

535,659.22

203,082.64

203,082.64

Grand Total

11,357,057.64

4,305,762.17

4,305,762.17

( - ) Less Retention @ 6 %

258,345.73

258,345.73

( - ) Less I.T. @ 2 %

86,115.24

86,115.24

( - ) Less @ 4 % APGST on 70% Total Amount

150,701.68

150,701.68

Description of Work

Erection of 33 kv lines

to

Cumulative Bill

Previous Bill

Present Bill

Cess @ 1%

38,497.19

38,497.19

Service Tax @ 15%

107,231.70

107,231.70

Net Amount

3,664,870.63

3,664,870.63

Material

Labour

2419963.00

1429755.95

Sl. No.

Location Name

Survey

11 Mtr Pole

9.1 Mtr Pole

8.0 Mtr Stut Pole

33 KV V Crossarm

33 KV Tapping Channel

Spl. Top cleats

Stay Sets

33 KV Pins &
Insulators

33 KV Disks & MP

Span of Length

33 KV VF

33 KV DP

Cut Point

Stay Concreting

9.1 Mtr Pole


Concreting

Pole Coil Earthing

11 Mtr Pole Concreting

T RISER

Side arm

33 KV Pole Schedule Abstract 1st Bill

Thatikonda to Malkapur Link Line 33 KV

9717

174

20

60

165

35

178

15

564

165

9717

15

15

66

255

Limited to Agt. Qty. (Present Bill)

9717

174

20

165

24

178

15

564

165

9717

15

15

66

154

101

To Be Billed Qty.
2

Chagal to Thatikonda Link Line 33 KV


Limited to Agt. Qty. (Present Bill)

60

11

8733

10

130

15

36

134

16

156

27

501

135

8733

13

27

68

190

10

12

8733

130

15

134

16

156

27

501

135

8733

13

27

68

188

10

134 156

10

12

12

To Be Billed Qty.

10

35

Total Billed (1st Bill)

18450

304

35

299

40

334

42

Total To Be Billed Qty.

12

95

11

1065 300 18450