AS OF MAY 2014
HADEED CCL
Quality
Environment
Safety
Energy
ISO 9001
ISO 14001
OHSAS 18001, KOSHA 18001
KEPIC, ASME Section 1&3
BUSINESS AREA
WORK
SCOPE
Planning
Engineering
Procurement
Construction
Operation
Maintenance
Planning
Project Execution
Commercial Operation
MINING PLANTS
MINE PROCESS PLANT
TRANSPORTATION
PORT FACILITIES
STEEL PLANTS
IRON MAKING PLANT
PROCESS
PROCESS LINE
PICKLING LINE
ANNEALING LINE
GALVANIZING LINE
COLOR COATING LINE
SLITTING LINE
PACKING LINE
OVERSEAS
PROJECT
CAPACITY
STORAGE MATERIAL
COAL
LOCATION
GWANGYANG, KOREA
PERIOD
WORK SCOPE
EPC
MAJOR PROJECTS
PROJECT
*) ON-GOING PROJECT
SCOPE
CAPACITY
COMPLETION
FORMOSA, RMHF,
HA TINH, VIETNAM
ECE
2016*
CSP, RMHF,
PECEM, BRAZIL
EPC
2015*
EPC
50,000 TON
4 SET
2014
EPC
50,000 TON
15 SET
2012
EPC
6,000 T/H
2 SET
2012
EPC
6,000 T/H
22 SET
2012
EPC
60,000 TON
6 SET
2011
EPC,
O&M
4,000 T/H
3 BC LINE
2010
2010
INTERNATIONAL AIRPORT
RECLAMATION, KOREA
SNNC, FE-NI RMHF,
GWANGYANG, KOREA
EPC
SCOPE
CAPACITY
COMPLETION
EPC
2006
EPC
4,000,000 T/Y
2006
EPC
2005
EPC
1,500,000 T/Y
1999
EPC
4,000,000 T/Y
1998
PROJECT
CAPACITY
1,320,000 T/Y
CHAMBER HEIGHT
7.6 M
LOCATION
CILEGON, INDONESIA
PERIOD
WORK SCOPE
EPC
MAJOR PROJECTS
PROJECT
*) ON-GOING PROJECT
SCOPE
CAPACITY
COMPLETION
EPC
1,320,000 T/Y
2015*
FORMOSA, BY-PRODUCT
PLANT, HA TINH, VIETNAM
175,000N/H
2015*
EPC
1,320,000 T/Y
2013
EPC
2,850,000 T/Y
2011
EPC
360 T/H
(DRY COKE)
2011
EPC
620,000 T/Y
2007
EPC
6,800 N/H
2007
EPC
180 T/H
(DRY COKE)
2005
PROJECT
CAPACITY
600
PRODUCTIVITY
LOCATION
GWANGYANG, KOREA
PERIOD
WORK SCOPE
EPC
MAJOR PROJECTS
PROJECT
*) ON-GOING PROJECT
SCOPE
CAPACITY
COMPLETION
EPC
400 M2
2015*
EPC
450 M2
2013
EPC
450 M2
2012
EP
204 M2
2011
EPC
600 M2
2011
EPC
518 M2
2010
EPC
470 M2
497 M2
2009
EP
420 M2
2009
SCOPE
CAPACITY
COMPLETION
EPC
450 M2
2007
EPC
504 M2
2006
EPC
NO.2: 450 M2
NO.4: 477 M2
2004
EPC
400 M2
2002
PROJECT
CAPACITY
3,000,000 T/Y
INNER VOLUME
3,800 M3
LOCATION
CILEGON, INDONESIA
PERIOD
WORK SCOPE
EPC
MAJOR PROJECTS
*) ON-GOING PROJECT
SCOPE
INNER
VOLUME
COMPLETION
EPC
3,800 M3
2015*
EPC
5,220 M3
2014
EPC
3,800 M3
2013
EPC
6,000 M3
2013
EPC
5,600 M3
2011
EPC
4,150 M3
2010
EPC
5,500 M3
2009
EPC
2,020 M3
2009
PROJECT
SCOPE
CAPACITY
COMPLETION
EPC
2008
EPC
4,600 M3
2007
EPC
4,350 M3
2006
EPC
4,350 M3
2005
EPC
3,820 M3
2002
EPC
4,020 M3
1999
EPC
2,550 M3
1997
EPC
3,000 M3
1994
PROJECT
CAPACITY
LOCATION
POHANG, KOREA
PERIOD
WORK SCOPE
EPC
MAJOR PROJECTS
PROJECT
*) ON-GOING PROJECT
SCOPE
CAPACITY
COMPLETION
EPC
300 TON/CH
KR (2)/BOF (2)
2015*
EPC
280 TON/CH
BOF(1)
2014
EPC
300 TON/CH
KR(1) / BOF(1)
2013
EPC
100 TON/CH
BOF(2) K-OBM
2013
POSCO, ALLOTHERMAL
CONVERTER, POHANG, KOREA
EPC
100 TON/CH
BOF(1) OBM
2013
EPC
330 TON/CH
KR(2) / BOF(2)
2011
EPC
280 TON/CH
KR(2) / BOF(1)
2010
EPC
280 TON/CH
KR(3) / BOF(1)
2007
EPC
BOF(1)
2007
PROJECT
CAPACITY
447,000 T/Y
LOCATION
CHANGWON, KOREA
PERIOD
WORK SCOPE
EPC
MAJOR PROJECTS
PROJECT
SCOPE
CAPACITY
COMPLETION
EPC
120 TON/CH
2014
EPC
065 TON/CH
2012
EPC
100 TON/CH
2009
EPC
060 TON/CH
2009
EPC
150 TON/CH
2009
EPC
065 TON/CH
2006
EPC
090 TON/CH
2003
EPC
040 TON/CH
2003
EPC
130 TON/CH
1996
PROJECT
CAPACITY
300 TON/CH
LOCATION
CILEGON, INDONESIA
PERIOD
2011.03 ~ 2013.12
WORK SCOPE
EPC
MAJOR PROJECTS
PROJECT
*) ON-GOING PROJECT
SCOPE
CAPACITY
COMPLETION
EPC
300 TON/CH
RH (1)/LF (1)
2015*
EPC
280 TON/CH
RH (1)/LF (1)
2014
EPC
300 TON/CH
RH (1)/LF (1)
2013
EPC
100 TON/CH
VOD(2)
2013
EPC
100 TON/CH
RH(1)/LF(1)
2013
EPC
330 TON/CH
RH (1)/LF (2)
2011
EPC
280 TON/CH
RH (1)/ VTD (1)
2010
EPC
275 TON/CH
RH(1)
2009
EPC
280 TON/CH
RH(1)
2007
PROJECT
CAPACITY
3,400,000 T/Y
PRODUCT
LOCATION
GWANGYANG, KOREA
PERIOD
WORK SCOPE
EPC
MAJOR PROJECTS
PROJECT
*) ON-GOING PROJECT
SCOPE
CAPACITY
COMPLETION
EPC
3,000,000 T/Y
2015*
EPC
3,400,000 T/Y
2014*
EPC
3,400,000 T/Y
2013
EPC
3,000,000 T/Y
2013
EPC
2,800,000 T/Y
2010
EPC
1,300,000 T/Y
2010
EPC
3,200,000 T/Y
2010
EPC
3,200,000 T/Y
2009
SCOPE
CAPACITY
COMPLETION
EPC
3,500,000 T/Y
2007
EPC
00,600,000 T/Y
2006
EPC
2,500,000 T/Y
2003
PC
1,500,000 T/Y
1999
EPC
2,200,000 T/Y
1997
MAJOR PROJECTS
PROJECT
NO.2 BILLET CASTER
REVAMPING IN NO.1
SCOPE
CAPACITY
COMPLETION
EPC
0,750,000 T/Y
2013
EPC
2,400,000 T/Y
2011
EPC
1,100,000 T/Y
2008
EPC
0,800,000 T/Y
2002
EPC
0,800,000 T/Y
2002
PROJECT
CAPACITY
2,400,000 T/Y
PRODUCT
LOCATION
POHANG, KOREA
PERIOD
JAN.2008 ~ MAR.2011
WORK SCOPE
EPC
PROJECT
POSCO-NO.4 HRM
CAPACITY
3,300,000 T/Y
PRODUCT
LOCATION
GWANGYANG, KOREA
PERIOD
WORK SCOPE
EPC
MAJOR PROJECTS
PROJECT
*) ON-GOING PROJECT
SCOPE
CAPACITY
COMPLETION
EPC
800,000 T/Y
2017*
5,300,000 T/Y
2015*
EPC
3,300,000 T/Y
2014*
EP
800,000 T/Y
2006
EPC
4,700,000 T/Y
2005
EPC
1,674,000 T/Y
2003
EPC
1,674,000 T/Y
2003
SCOPE
CAPACITY
COMPLETION
EPC
2009
EPC
2009
EPC
3,240,000 T/Y
2003
EPC
4,050,000 T/Y
2001
EPC
2,640,000 T/Y
2000
EPC
4,800,000 T/Y
1999
EPC
2,400,000 T/Y
1997
PROJECT
CAPACITY
1,500,000 T/Y
PRODUCT
LOCATION
CILEGON, INDONESIA
PERIOD
WORK SCOPE
EPC
MAJOR PROJECTS
PROJECT
*) ON-GOING PROJECT
SCOPE
CAPACITY
COMPLETION
EPC
1,500,000 T/Y
2013
EPC
2,000,000 T/Y
2010
EPC
1,800,000 T/Y
2005
EPC
1,674,000 T/Y
2003
EPC
1,674,000 T/Y
2001
EPC
2,400,000 T/Y
1997
EPC
1,674,000 T/Y
1996
PROJECT
CAPACITY
700,000 T/Y
PRODUCT
WIRE ROD
LOCATION
POHANG, KOREA
PERIOD
WORK SCOPE
EPC
MAJOR PROJECTS
PROJECT
SCOPE
CAPACITY
COMPLETION
EPC
700,000 T/Y
2013
EPC
680,000 T/Y
2006
EP
140,000 T/Y
2003
EPC
820,000 T/Y
2002
EPC
200,000 T/Y
1995
EC
200,000 T/Y
1994
EC
700,000 T/Y
1990
PROJECT
CAPACITY
300,000 T/Y
PRODUCT
LOCATION
IZMIT, TURKEY
PERIOD
WORK SCOPE
EP
MAJOR PROJECTS
PROJECT
*) ON-GOING PROJECT
SCOPE
CAPACITY
COMPLETION
EPC
600,000 T/Y
2014*
EPC
175,000 T/Y
2014*
POSCO-ASSAN TST,
STAINLESS CAPL, IZMIT,
TURKEY
EP
300,000 T/Y
2013
EP
220,000 T/Y
2012
EPC
400,000 T/Y
2009
EPCM
695,000 T/Y
2006
EPC
474,000 T/Y
2003
PROJECT
CAPACITY
1,000,000 T/Y
PRODUCT
LOCATION
MAHARASHTRA, INDIA
PERIOD
WORK SCOPE
EPC
MAJOR PROJECTS
PROJECT
SCOPE
CAPACITY
COMPLETION
POSCO MAHARASHTRA
NO.1 CAL,
MAHARASHTRA, INDIA
EPC
1,000,000 T/Y
2014
POSCO-VIETNAM
NO.1 CAL,
VUNGTAO, VIETNAM
EPC
700,000 T/Y
2009
EPC
300,000 T/Y
2005
EPC
300,000 T/Y
2005
EPC
1,000,000 T/Y
2003
EPC
1,800,000 T/Y
1997
PROJECT
CAPACITY
1,800,000 T/Y
PRODUCT
LOCATION
MAHARASHTRA, INDIA
PERIOD
MAY. 2011
WORK SCOPE
EPC
~ JUN. 2014
MAJOR PROJECTS
PROJECT
*) ON-GOING PROJECT
SCOPE
CAPACITY
COMPLETION
EPC
600,000 T/Y
2017*
POSCO MAHARASHTRA,
NO.1 CRM, INDIA
EPC
1,800,000 T/Y
2014*
EP
300,000 T/Y
2013
POSCO VST,
STS CRM, VIETNAM
EPC
100,000 T/Y
2012
EPC
1,200,000 T/Y
2009
EPCM
150,000 T/Y
2004
EPCM
140,000 T/Y
2003
1,225,000 T/Y
2003
EP
SCOPE
EPCM
CAPACITY
COMPLETION
140,000 T/Y
1999
EPC
1,100,000 T/Y
1999
EPC
500,000 T/Y
1997
EPC
1,800,000 T/Y
1997
PROJECT
CAPACITY
450,000 T/Y
PRODUCT
LOCATION
MAHARASHTRA, INDIA
PERIOD
WORK SCOPE
EPC
MAJOR PROJECTS
PROJECT
SCOPE
CAPACITY
COMPLETION
EPC
500,000 T/Y
2013
POSCO CGL,
GUANGDONG, CHINA
EPC
450,000 T/Y
2012
POSCO CGL,
MAHARASHTRA, INDIA
EPC
450,000 T/Y
2012
EP
370,000 T/Y
2009
PROSPERITY PGL,
KAOSHIUNG, TAIWAN
EP
500,000 T/Y
2009
EPC
430,000 T/Y
2008
EPC
400,000 T/Y
2006
EPC
300,000 T/Y
2006
SCOPE
CAPACITY
COMPLETION
EP
30,000 T/Y
2005
EPC
450,000 T/Y
2005
EP
200,000 T/Y
2005
EP
250,000 T/Y
X 2 LINES
2005
EPC
300,000 T/Y
2004
EP
150,000 T/Y
2004
EP
30,000 T/Y
2004
EP
150,000 T/Y
2004
EPC
580,000 T/Y
2002
EPC
200,000 T/Y
2000
EPC
450,000 T/Y
2000
EP
30,000 T/Y
1998
EPCM
100,000 T/Y
1998
EP
150,000 T/Y
1997
PROJECT
CAPACITY
120,000 T/Y
PRODUCT
LOCATION
TURKEY
PERIOD
WORK SCOPE
EP
MAJOR PROJECTS
PROJECT
SCOPE
CAPACITY
COMPLETION
EP
120,000 T/Y
2014
EP
200,000 T/Y
2009
EPC
120,000 T/Y
2007
EP
50,000 T/Y
2005
EPC
150,000 T/Y
2005
EP
100,000 T/Y
X 2 LINE
2005
EP
100,000 T/Y
2004
EP
20,000 T/Y
2004
EP
100,000 T/Y
2003
SCOPE
CAPACITY
COMPLETION
EP
2003
EP
22,000 T/Y
2002
EP
70,000 T/Y
2001
EPCM
100,000 T/Y
1999
EPCM
50,000 T/Y
1998
PROJECT
CAPACITY
300,000 T/Y
PRODUCT
NO
THICKNESS : 0.35MM ~ 0.70MM
WIDTH : 900MM ~ 1,280MM
LOCATION
MAHARASHTRA, INDIA
PERIOD
WORK SCOPE
EP
MAJOR PROJECTS
PROJECT
SCOPE
CAPACITY
COMPLETION
POSCO MAHARASHTRA
ACL,
MAHARASHTRA, INDIA
EPC
300,000 T/Y
2013
SHUNPO ACL,
SHUNDE, CHINA
EPC
1,500,000 T/Y
2010
EPC
850,000 T/Y
2009
EPC
900,000 T/Y
2009
EPC
1,000,000 T/Y
2009
EPC
3,690,000 T/Y
2009
EPC
820,000 T/Y
2006
EPC
1,640,000 T/Y
2006
EPC
3,430,000 T/Y
2006
SCOPE
CAPACITY
COMPLETION
EPC
18,000 T/Y
2006
EPC
341,000 T/Y
2005
EPC
82,000 T/Y
2004
EPC
250,000 T/Y
2002
EPC
220,000 T/Y
1998
HCI
FINE ORE
MELTING
NON-COKING
COAL FURNACE
COAL
BRIQUETTE
MOLTEN
IRON
FINEX, one of the most successful alternative ironmaking technologies jointly developed with
SIEMENS-VAI, is based on the direct use of ore fines
and non-coking coal. The key technologies of FINEX
are fluidized bed reduction of ore fines, hot DRI
fines compaction to HCI(Hot Compacted Iron),
briquetting of coal fines, and melting of HCI into hot
metal. POSCO has been operating the worlds first
commercial FINEX plant, with 1.5 MT of annual
capacity, since April 2007 and has added up a new
2.0 MT in January 2014.
ENDLESS ROLLING