METHOD STATEMENT
DG Khan Cement
Zealcon Engineering (Pvt.) Ltd
Rev.
Description
No
00
QHSE
Farhan
A. Hafeez
Ahmad
Khan
Sohail Rabbani
Page
1 of 14
Zealcon Engineering
(Pvt.) Ltd
Zealcon-DGK-9000 TPD-MS-004
Issue # 001
Issue Date
Page 2 of 14
25-07-2016
1. PURPOSE
This MATERIAL HANDLING AND STORAGE PROCEDURE is intended to define
the requirements, storing, care and custody etc., from receipt through to
issue of the MATERIALS supplied by the VENDOR to the CONTRACTOR and
to set forth the respective CONTRACTOR's responsibilities and obligations in
this respect.
2. SCOPE OF APPLICATION
This Method Statement is to apply to all aspects of MATERIALS handling and
Control carried out by the respective Contractor.
3. DEFINITIONS & KEY PERSONNEL
3.1 Definitions
In this Method Statement, the following words and expressions are used,
and they have the respective meanings hereby assigned to them, except
where the context otherwise requires,
COMPANY:
DG Khan Cement
CONTRACTOR:
SITE:
the
construction of the PLANT including such
places adjacent there
Page
2 of 14
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Material
Handling And Storage
Zealcon-DGK-9000 TPD-MS-004
Issue # 001
Issue Date
Page 3 of 14
25-07-2016
by the
Contractor.
VENDOR
Company or
Contractor for supply and construction.
3.2 Key Personnel
The following key personnel of the Contractors may be assigned in respect
of MATERIALS Handling and Storing
3.2.1 Incharge Warehouse
A person employed and assigned who shall be responsible to the
overall control of MATERIALS, which includes receiving, storing,
issuing, stock taking and disposal of MATERIALS and also includes
forecasting of MATERIALS availability and arranging of replacement
for shortage, damaged or shortfall MATERIALS.
3.2.2 Store Officer
A person employed and assigned, who shall be reporting to the
Incharge Warehouse, for the receiving, storing, issuing and stock
taking of MATERIALS at the Warehouse And Open Storage Area.
3.2.3 Store Keeper
Page
3 of 14
Zealcon Engineering
(Pvt.) Ltd
Zealcon-DGK-9000 TPD-MS-004
Issue # 001
Issue Date
Page 4 of 14
25-07-2016
and
Storing
activities
are
listed
as
follows,
including
Page
4 of 14
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Material
Handling And Storage
Zealcon-DGK-9000 TPD-MS-004
Issue # 001
Issue Date
Page 5 of 14
25-07-2016
Page
5 of 14
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Material
Handling And Storage
Zealcon-DGK-9000 TPD-MS-004
Issue # 001
Issue Date
Page 6 of 14
25-07-2016
Page
6 of 14
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Material
Handling And Storage
Zealcon-DGK-9000 TPD-MS-004
Issue # 001
Issue Date
Page 7 of 14
25-07-2016
Page
7 of 14
Zealcon Engineering
(Pvt.) Ltd
Zealcon-DGK-9000 TPD-MS-004
Issue # 001
Issue Date
Page 8 of 14
25-07-2016
Store keeper..
All Unpacking inspection shall be carried out with the utmost care, to
ensure that no damage occurs to the MATERIALS.
Page
8 of 14
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Material
Handling And Storage
Zealcon-DGK-9000 TPD-MS-004
Issue # 001
Issue Date
Page 9 of 14
25-07-2016
b.
The Store Officer shall submit both reports to the Warehouse Incharage
for review and confirmation.
The Warehouse Incharge shall take any necessary steps for the
replacement of irreparable MATERIALS, or to make up any deficiency in
quantities, through one of the following actions:
1. Checking whether the available spare quantities can cover the
damage or shortage quantities,
2. Requesting local procurement and necessary approval by Site
Manager/ Project Manager.
Page
9 of 14
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Material
Handling And Storage
Zealcon-DGK-9000 TPD-MS-004
Issue # 001
Issue Date
Page 10 of 14
25-07-2016
Request for Urgent Procurement (RUP) shall be prepared only when resending of replacement is required and issued to the Company (If
purchased by Company). (Where the damage or shortage can be
covered by the available spares, RUP is not required.). One (1) copy of
the relevant ESD shall be attached to.
6. STORING
6.1 General
The Store Officer shall instruct his Storekeepers, the following
Page
10 of 14
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Material
Handling And Storage
Zealcon-DGK-9000 TPD-MS-004
Issue # 001
Issue Date
Page 11 of 14
25-07-2016
Responsibility for the care and protection for stored materials lies with
the Storekeeper, under the direction of the Store Officer, until the
MATERIALS are issued to the respective Construction Engineer, and
after which, lies with the Construction Engineer until the Completion of
Work.
Page
11 of 14
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Material
Handling And Storage
Zealcon-DGK-9000 TPD-MS-004
Issue # 001
Issue Date
Page 12 of 14
25-07-2016
The Storekeepers must enter daily, on the Stock Book and/or Bin Card,
the type and quantity of MATERIALS issued.
Page
12 of 14
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Material
Handling And Storage
Zealcon-DGK-9000 TPD-MS-004
Issue # 001
Issue Date
Page 13 of 14
25-07-2016
Page
13 of 14
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Material
Handling And Storage
Zealcon-DGK-9000 TPD-MS-004
Issue # 001
Issue Date
Page 14 of 14
25-07-2016
When any MATERIALS are returned, the Store Officer shall record
the quantities on "Issued Quantities" of Stock Book as minus(-)
values.