(Pvt.) Ltd
Method Statement for Surface
Preparation And Protective Coating
Zealcon-DGK-9000 TPD-MS003
Issue # 001
Issue Date
Page 1 of 11
16-06-2016
METHOD STATEMENT
Client:
DG Khan Cement
Contractor:
(Pvt.) Ltd
Rev.
No
00
Zealcon Engineering
Description
By
Prepared
By
Reviewed
By
Approved By
MS for Control of
Surface Preparation
And Protective Coating
QHSE
Farhan
Ahmad
A. Hafeez
Khan
Sohail Rabbani
Page 1 of 11
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Surface
Preparation And Protective Coating
Zealcon-DGK-9000 TPD-MS003
Issue # 001
Issue Date
Page 2 of 11
16-06-2016
CONTENTS
1. Purpose
2. References
3. Definitions
4. Responsibilities
5. Pre-blast Preparations
6. Ambient Conditions
7. Equipments
8. Abrasives
9. Cleanliness degree
10. Precautions
11. Mechanical Cleaning
12. Cleaning of surface between coats
13. Painting
14. Painting Applications
15. Application Equipment
16. Re coating interval
17. Handling of coated items
18. Dry Film Thickness
19. Repairing of coating
20. Quality Control
21. Blast Cleaning and Painting Inspection Report
1. PURPOSE
This Method Statement provides the guidelines for Blast Cleaning and Painting of
Fabricated structural steel materials & Mechanical equipment for D G Cement
Page 2 of 11
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Surface
Preparation And Protective Coating
Zealcon-DGK-9000 TPD-MS003
Issue # 001
Issue Date
Page 3 of 11
16-06-2016
2. REFERENCE DOCUMENTS
General Workshop Instructions 520530-8.0
EN ISO 8503-2:2012 Preparation of steel substrates before application of paints
and related products
Steel Structure Painting Council (SSPC)
ASTM D3335 Test Method for Low Concentrations of Lead, Cadmium and Cobalt
in Paint by Atomic Absorption Spectroscopy
AOAC 974.02, Lead in Paint, Atomic Absorption Spectophometric Method or
equivalent shall be used.
Design Drawings and Standards
Project application datasheets
3. DEFINATIONS
COMPANY
DG Khan Cement
CONTRACTOR
ZEAL Construction Engineering
CONSULTANT
FL Smidth
ITP
Inspection & Test Plan
QC
Quality Control
MS
Method Statements
4. RESPONSIBILITIES.
Project Manager shall be responsible to provide recourses for execution of the
activity.
Painting supervisor and Painting QC Inspector shall be the responsible persons for
blast cleaning & Painting activities in accordance with General Workshop
Instruction 520530-8.0 and this Method Statement.
5. PRE-BLASTING PREPARATIONS
Before shipment for blast cleaning of fabricated items, shall be checked for free
Page 3 of 11
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Surface
Preparation And Protective Coating
Zealcon-DGK-9000 TPD-MS003
Issue # 001
Issue Date
Page 4 of 11
16-06-2016
6. AMBIENT CONDITION
Blast cleaning shall not proceed on surfaces that are moist or may become moist
before the application of primer. Blasting shall not be permitted when metal
surfaces are less than 3 deg above the dew point or when the relative humidity of
the air is greater than 85%.
7. BLASTING EQUIPMENTS
The compressed air used for blasting shall be free of water and oil.
Adequate
coolers and separators/traps shall be fitted and these shall be kept emptied. The
discharge pressure shall be measured at the nozzle with a hypodermic pressure
gauge of 7 kg/cm (100 PSI) and not less than 5.5 Kg/cm (80Psi).
8. ABRASIVES
Abrasive for use on carbon steel and low alloy steel shall be in accordance with
General Workshop 520530-8.0
Abrasive used on stainless steel shall be free for chloride, zinc and iron
contaminants.
Company approval shall be required prior to use of abrasive.
9. CLEANLINESS DEGREE
Page 4 of 11
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Surface
Preparation And Protective Coating
Zealcon-DGK-9000 TPD-MS003
Issue # 001
Issue Date
Page 5 of 11
16-06-2016
10.
PRECAUTIONS
Page 5 of 11
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Surface
Preparation And Protective Coating
Zealcon-DGK-9000 TPD-MS003
Issue # 001
Issue Date
Page 6 of 11
16-06-2016
The surfaces which cannot be blast cleaned due to un-access or blast cleaning is
impracticable may be cleaned mechanically subject to Company approval.
11.
MECHANICAL CLEANING
Mechanical cleaning comprises power and hand tool cleaning method. Such surface
preparation methods shall be restricted to those areas where standard cleaning is
prohibited or impossible due to access or dust sensitive equipment presence and
shall be performed only with the acceptance of manufacturer approval procedure
and equipment used shall be recorded.
12.
Oil, Grease, dirt, dust or any other contaminants shall be removed completely prior
to the application of any succeeding coat of paint system.
13.
PAINTING
13.1
Storage conditions
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Surface
Preparation And Protective Coating
Zealcon-DGK-9000 TPD-MS003
Issue # 001
Issue Date
Page 7 of 11
16-06-2016
Products which have reached their expiry date shall not be used unless checked
and approved by paint manufacturer.
13.2
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Surface
Preparation And Protective Coating
14.
Zealcon-DGK-9000 TPD-MS003
Issue # 001
Issue Date
Page 8 of 11
16-06-2016
PAINTING APPLICATIONS
14.1
Paint system
The type, number of coats and thickness of paint shall be as indicated in General
Workshop Instructions 520530-8.0 Para 5.5.6, 5.7 and 5.5.8
The primer and subsequent coats of each painting system shall be of the same
make.
The manufacturers instructions, including safety precautions, form part of the
present document and shall prevail over all other instructions in case of conflict.
The dry film thickness shall not be less 90% of the specified thickness
14.2
Ambient Conditions
Coating application shall not be performed when weather conditions are not as
per the Manufacturers recommendations, and particularly;
a. In dusty or windy weather, or dust laden air.
b. In areas where injurious particles are in suspension.
c. If the surface temperature is less than 3c above the dew point of the
ambient air.
d. If the relative humidity is in excess of 85% (95% for inorganic ethyl zinc
silicate primer application.)
Generally when adverse conditions are expected soon, outdoor painting shall be
stopped. If it is raining either during or immediately after paint application, proper
steps such as re-painting shall be taken. (Except for ethyl zinc silicate primer).
Paint application shall not be carried out if ambient temperature reaches or
exceeds 55c.
14.3
Precautions
Blast cleaned surface shall be given a coat of primer as soon as possible and not
later than 4 hours after surface preparation completion. If oxidation appears
Page 8 of 11
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Surface
Preparation And Protective Coating
Zealcon-DGK-9000 TPD-MS003
Issue # 001
Issue Date
Page 9 of 11
16-06-2016
15.
APPLICATION EQUIPMENT
16.
RE-COATING INTERVALS
Each coat shall be allowed to dry or cure for a time specified by the manufacturer
before the application of any succeeding coat.
If the specified period between coats has been exceeded, sweeping with abrasive
or the corrective actions as recommended by the manufacturer shall be carried
out.
Page 9 of 11
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Surface
Preparation And Protective Coating
Zealcon-DGK-9000 TPD-MS003
Issue # 001
Issue Date
Page 10 of 11
16-06-2016
All products that have been exposed to weathering for any length of time shall
be carefully checked for chalking or surface contamination and cleaned by
appropriate means to obtain a sound, contamination free surface for subsequent
coat application.
17.
18.
The tolerance limits for dry film thickness for each coat and the total coating
systems shall be strictly followed. It shall be observed that excessive film thickness
may be determined due to solvent retention and improper curing.
19.
REPAIRING OF COATING
Zealcon Engineering
(Pvt.) Ltd
Method Statement for Surface
Preparation And Protective Coating
Zealcon-DGK-9000 TPD-MS003
Issue # 001
Issue Date
Page 11 of 11
16-06-2016
20.
QUALITY CONTROL
During blast cleaning & painting the following instruments shall be available with
QC Inspector for inspection.
1. Wet Film Thickness Gauge.
2. Dry Film Thickness Gauge.
3. Humidity Gauge.
21.
Page 11 of 11